Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67172-67173 [2011-28099]
Download as PDF
67172
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14167–000, 14185–000 and
14196–000]
jlentini on DSK4TPTVN1PROD with NOTICES
Riverbank Hydro No. 16 LLC, Lock
Hydro Friends Fund IV, FFP Project 55
LLC; Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On May 2, 2011, Riverbank Hydro No.
16 LLC (Riverbank), and on May 3,
2011, Lock Hydro Friends Fund IV
(Lock Hydro), and FFP Project 55 LLC
(FFP 55) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Kentucky River Lock
& Dam No. 2, located on the Kentucky
River, in Henry and Owen Counties,
Kentucky. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Riverbank’s Project No. 14167–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing one generating unit with a
total capacity of 9.4 megawatts (MW);
(4) a tailrace structure; and (5) a 2.7mile-long, 25 kilo-volt (kV) transmission
line. The project would have an
estimated average annual generation of
31.0 gigawatt-hours (GWh), and operate
run-of-river utilizing surplus water from
the Kentucky River Lock & Dam No. 2,
as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Toronto, ON, Canada M5J2J4. (416) 861–
0092 x 154.
Lock Hydro’s Project No. 14185–000
would consist of: (1) One lock frame
modules, the frame module will be 45feet long, 20-feet-high and contain four
generating units with a total combined
capacity of 3.0 MW; (2) a new
switchyard containing a transformer;
and (3) a proposed 3.0-mile-long, 115
kV transmission line to an existing
distribution line. The proposed project
would have an average annual
generation of 13.149 GWh, and operate
run-of-river utilizing surplus water from
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
the Kentucky River Lock & Dam No. 2,
as directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566 x 709.
FFP 55’s Project No. 14196–000
would consist of: (1) An 170-foot-long,
130-foot-wide approach channel; (2) a
powerhouse, located on the
southeastern side of the dam, containing
two generating units with a total
capacity of 6.6 MW; (3) a 275-foot-long,
130-foot-wide tailrace; (4) a 4.16/25 KV
substation; and (5) a 3.0-mile-long, 25
kV transmission line. The proposed
project would have an average annual
generation of 26.4 GWh, and operate
run-of-river utilizing surplus water from
the Kentucky River Lock & Dam No. 2,
as directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14167–000, P–14185–000, or P–
14196–000) in the docket number field
to access the document. For assistance,
contact FERC Online Support.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28101 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[14160–000; 14179–000; 14194–000]
Riverbank Hydro No. 8 LLC Lock
Hydro Friends Fund XLIV FFP Project
51 LLC; Notice of Competing
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 2, 2011, Riverbank Hydro No.
8 LLC (Riverbank), and on May 3, 2011,
Lock Hydro Friends Fund XLIV (Lock
Hydro) and FFP Project 51 LLC (FFP 51)
filed preliminary permit applications,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of a hydropower project at the
U.S. Army Corps of Engineers’ (Corps)
Emmett Sanders Lock & Dam, located on
the Arkansas River in Jefferson County,
Arkansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Riverbank’s Project No. 14160–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing three generating units with a
total capacity of 50.1 megawatts (MW);
(4) a tailrace structure; and (5) a 3.3mile-long, 69 kilo-volt (kV) transmission
line. The project would have an
estimated average annual generation of
145.0 gigawatt-hours (GWh), and
operate run-of-river utilizing surplus
water from the Emmett Sanders Lock &
Dam, as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong,
Riverbank Power Corporation, Royal
Bank Plaza, South Tower, P.O. Box 166,
200 Bay Street, Suite 3230, Toronto, ON,
Canada M5J2J4. (416) 861–0092 x 154.
Lock Hydro’s Project No. 14179–000
would consist of: (1) Three lock frame
modules, each frame module will be
109-feet long, 40-feet-high and contain
ten generating units with a total
combined capacity of 25.0 MW; (2) a
new switchyard containing a
transformer; and (3) a proposed 7.0mile-long, 115 kV transmission line to
E:\FR\FM\31OCN1.SGM
31OCN1
jlentini on DSK4TPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
an existing distribution line. The
proposed project would have an average
annual generation of 164.362 GWh, and
operate run-of-river utilizing surplus
water from the Emmett Sanders Lock &
Dam, as directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566 x 709.
FFP 51’s Project No. 14194–000 would
consist of: (1) An 840-foot-long, 340foot-wide approach channel; (2) a
powerhouse, located on the east side of
the dam, containing four generating
units with a total capacity of 36.0 MW;
(3) a 425-foot-long, 260-foot-wide
tailrace; (4) a 7.2/115 KV substation; and
(5) a 2.6-mile-long, 69 kV transmission
line. The proposed project would have
an average annual generation of 144.0
GWh, and operate run-of-river utilizing
surplus water from the Emmett Sanders
Lock & Dam, as directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14160–000, P–14179–000, or P–
14194–000) in the docket number field
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
to access the document. For assistance,
contact FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28099 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14158–000; 14191–000]
Arkansas Electric Cooperative Corp.;
FFP Project 1 LLC; Notice of
Competing Preliminary Permit
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 2, 2011, Arkansas Electric
Cooperative Corp. (Arkansas Electric),
and on May 3, 2011, FFP Project 1 LLC
(FFP 1) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Col. Charles D.
Maynard Lock & Dam, located on the
Arkansas River in Jefferson County,
Arkansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Arkansas Electric’s Project No. 14158–
000 would consist of: (1) An 750-footlong, 400-foot-wide headrace channel;
(2) a powerhouse, located on the right
abutment of the dam, containing four
generating units with a total capacity of
36.0 megawatt (MW); (3) a 1,200-footlong, 450-foot-wide tailrace; and (4) a
proposed 4.0-mile-long, 115 kilo-volt
(kV) transmission line to an existing
switchyard. The proposed project would
have an average annual generation of
140.0 GWh, and operate run-of-river
utilizing surplus water from the Col.
Charles D. Maynard Lock & Dam, as
directed by the Corps.
Applicant Contact: Mr. Jonathan
Oliver, Arkansas Electric Cooperative
Corp., One Cooperative Way, Little
Rock, AR 72209. (501) 570–2488.
FFP 1’s Project No. 14191–000 would
consist of: (1) An 500-foot-long, 450foot-wide approach channel; (2) a
powerhouse, located on the west side of
the dam, containing four generating
PO 00000
Frm 00046
Fmt 4703
Sfmt 9990
67173
units with a total capacity of 42.0 MW;
(3) a 1,785-foot-long, 315-foot-wide
tailrace; (4) a 7.2/115 KV substation; and
(5) a 2.0-mile-long, 115 kV transmission
line. The proposed project would have
an average annual generation of 168.0
GWh, and operate run-of-river utilizing
surplus water from the Col. Charles D.
Maynard Lock & Dam, as directed by the
Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14158–000, or P–14191–000) in the
docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28098 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Pages 67172-67173]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28099]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[14160-000; 14179-000; 14194-000]
Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP
Project 51 LLC; Notice of Competing Preliminary Permit Applications
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On May 2, 2011, Riverbank Hydro No. 8 LLC (Riverbank), and on May
3, 2011, Lock Hydro Friends Fund XLIV (Lock Hydro) and FFP Project 51
LLC (FFP 51) filed preliminary permit applications, pursuant to section
4(f) of the Federal Power Act, proposing to study the feasibility of a
hydropower project at the U.S. Army Corps of Engineers' (Corps) Emmett
Sanders Lock & Dam, located on the Arkansas River in Jefferson County,
Arkansas. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
Riverbank's Project No. 14160-000 would consist of: (1) A forebay;
(2) an intake structure; (3) a powerhouse containing three generating
units with a total capacity of 50.1 megawatts (MW); (4) a tailrace
structure; and (5) a 3.3-mile-long, 69 kilo-volt (kV) transmission
line. The project would have an estimated average annual generation of
145.0 gigawatt-hours (GWh), and operate run-of-river utilizing surplus
water from the Emmett Sanders Lock & Dam, as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
Lock Hydro's Project No. 14179-000 would consist of: (1) Three lock
frame modules, each frame module will be 109-feet long, 40-feet-high
and contain ten generating units with a total combined capacity of 25.0
MW; (2) a new switchyard containing a transformer; and (3) a proposed
7.0-mile-long, 115 kV transmission line to
[[Page 67173]]
an existing distribution line. The proposed project would have an
average annual generation of 164.362 GWh, and operate run-of-river
utilizing surplus water from the Emmett Sanders Lock & Dam, as directed
by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090
Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709.
FFP 51's Project No. 14194-000 would consist of: (1) An 840-foot-
long, 340-foot-wide approach channel; (2) a powerhouse, located on the
east side of the dam, containing four generating units with a total
capacity of 36.0 MW; (3) a 425-foot-long, 260-foot-wide tailrace; (4) a
7.2/115 KV substation; and (5) a 2.6-mile-long, 69 kV transmission
line. The proposed project would have an average annual generation of
144.0 GWh, and operate run-of-river utilizing surplus water from the
Emmett Sanders Lock & Dam, as directed by the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14160-000, P-14179-000, or P-14194-000) in
the docket number field to access the document. For assistance, contact
FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28099 Filed 10-28-11; 8:45 am]
BILLING CODE 6717-01-P