Riverbank Hydro No. 3 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67182 [2011-28092]

Download as PDF jlentini on DSK4TPTVN1PROD with NOTICES 67182 Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices River Lock and Dam No. 3, located on the Arkansas River, in Lincoln and Jefferson Counties, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) An 400-foot-long, 280-foot-wide approach channel; (2) a powerhouse, located on the west side of the dam, containing four generating units with a total capacity of 48.0 MW; (3) a 500foot-long, 280-foot-wide tailrace; (4) a 7.2/115 kilo-Volt (kV) substation; and (5) a 2.6-mile-long, 115 kV transmission line. The proposed project would have an average annual generation of 192.0 GWh, and operate run-of-river utilizing surplus water from the Arkansas River Lock and Dam No. 3, as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can VerDate Mar<15>2010 17:21 Oct 28, 2011 Jkt 226001 be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14134–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28095 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14132–000] Riverbank Hydro No. 3 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Riverbank Hydro No. 3 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Millwood Dam, located on the Little River in Little River County, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) A forebay; (2) an intake structure; (3) a powerhouse containing two generating units with a total capacity of 18.0 megawatts (MW); (4) a tailrace structure; and (5) 8.1-mile-long, 25 kilovolt (KV) transmission line. The project would have an estimated average annual generation of 46.0 gigawatt-hours (GWh), and operate run-of-river utilizing surplus water from the Millwood Dam, as directed by the Corps. Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation, Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 3230, Toronto, ON, Canada M5J2J4. (416) 861– 0092 x 154. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1 (866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14132–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28092 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY EPA–HQ–OARM–2011–0803, EPA–HQ– OARM–2–11–0804; FRL–9484–8] Agency Information Collection Activities; Proposed Collection; Comment Request; Background Checks for Contractor Employees (Renewal) and Drug Testing for Contract Employees (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that EPA is planning to submit a request to renew two existing SUMMARY: E:\FR\FM\31OCN1.SGM 31OCN1

Agencies

[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Page 67182]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28092]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14132-000]


Riverbank Hydro No. 3 LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On April 1, 2011, Riverbank Hydro No. 3 LLC filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of a hydropower project 
at the U.S. Army Corps of Engineers' (Corps) Millwood Dam, located on 
the Little River in Little River County, Arkansas. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of: (1) A forebay; (2) an intake 
structure; (3) a powerhouse containing two generating units with a 
total capacity of 18.0 megawatts (MW); (4) a tailrace structure; and 
(5) 8.1-mile-long, 25 kilo-volt (KV) transmission line. The project 
would have an estimated average annual generation of 46.0 gigawatt-
hours (GWh), and operate run-of-river utilizing surplus water from the 
Millwood Dam, as directed by the Corps.
    Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation, 
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
    FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1 (866) 208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14132-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28092 Filed 10-28-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.