Drawbridge Operation Regulation; Nanticoke, Seaford, DE, 66184 [2011-27722]
Download as PDF
66184
Federal Register / Vol. 76, No. 207 / Wednesday, October 26, 2011 / Rules and Regulations
Dated: October 18, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, By direction of the
Commander, Fifth Coast Guard District.
[FR Doc. 2011–27721 Filed 10–25–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0972]
Drawbridge Operation Regulation;
Nanticoke, Seaford, DE
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the SR 13 Bridge across
the Nanticoke River, mile 39.6, at
Seaford, DE. The deviation is necessary
to accommodate the cleaning and
painting of the bridge. This deviation
allows the bridge to remain in the
closed position throughout the month of
November to facilitate the maintenance
work.
DATES: This deviation is effective from
12:01 a.m. on November 1, 2011 to
11:59 on November 30, 2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0972 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–0972 in the ‘‘Keyword’’
box and then clicking ‘‘Search’’. They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Lindsey Middleton, Bridge
Management Specialist, Coast Guard;
telephone 757–398–6629, e-mail
Lindsey.R.Middleton@uscg.mil. If you
have questions on viewing the docket,
call Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: Marinis
Bros. Inc., on behalf of Delaware
Department of Transportation (DelDOT),
has requested a temporary deviation
from the current operating regulation of
erowe on DSK2VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:10 Oct 25, 2011
Jkt 226001
the SR 13 Bridge across the Nanticoke
River, mile 39.6, at Seaford, DE. The
requested deviation is to accommodate
painting and cleaning of the bridge. The
vertical clearance of this single-leaf
bascule bridge is three feet at mean high
water (MHW) in the closed position and
unlimited in the open position. During
this deviation period, the vertical
clearance will be limited to one foot at
MHW due to the scaffolding that will be
used for the maintenance of the bridge.
The bridge will remain in the closed
position for the entire month. In critical
situations the bridge will be able to
open if at least 24 hours of notice is
given. There are no alternate routes
available to vessels.
The current operating schedule for the
bridge is set out in 33 CFR 117.243(b).
According to that schedule, during the
month of November the bridge shall
open on signal, except that from 6 p.m.
to 8 a.m. Monday through Friday and
3:30 p.m. through 7:30 a.m. Saturday
and Sunday, if at least four hours notice
is given.
Logs from November 2010 have
shown that there were 20 openings for
the entire month. Sixteen of those
openings were on November 13th and
14th. The openings were due to a Bass
Fishing Tournament; however, the
tournament is not scheduled for this
year minimizing the amount of
anticipated openings. The majority of
vessel traffic utilizing this waterway is
recreational boaters. There is one
mariner that requests most of the bridge
openings throughout the winter months.
Marinis Bros., Inc. has coordinated with
this mariner. DelDOT has coordinated
with the town concerning the month
long bridge closure as well. The Coast
Guard will inform all other users of the
waterway through our Local and
Broadcast Notices to Mariners so that
mariners can arrange their transits to
minimize any impact caused by the
temporary deviation. The Coast Guard
will also require the bridge owner to
post signs on either side of the bridge
notifying mariners of the temporary
regulation change.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: October 12, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2011–27722 Filed 10–25–11; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00016
Fmt 4700
Sfmt 4700
POSTAL SERVICE
39 CFR Part 241
Post Office Organization and
Administration: Establishment,
Classification, and Discontinuance
Postal Service.
Final rule.
AGENCY:
ACTION:
The Postal Service is
amending its regulations to improve the
administration of the Post Office closing
and consolidation process. This final
rule adopts changes to Postal Service
regulations pertaining to the definition
of ‘‘consolidation’’ and the staffing of
Post Offices.
DATES: Effective Date: December 1, 2011.
FOR FURTHER INFORMATION CONTACT: Jim
Boldt, (202) 268–6799.
SUPPLEMENTARY INFORMATION: On March
31, 2011, the Postal Service published a
proposed rule in the Federal Register
(76 FR 17794) to improve the process for
discontinuing Post Offices and other
Postal Service-operated retail facilities.
The proposed rule also included various
proposals to apply certain
discontinuance procedures to all retail
facilities operated by Postal Service
employees. The Postal Service requested
comments on the proposed rule.
On July 13, 2011, the Postal Service
published an initial final rule (76 FR
41413), with minor corrections
published on July 21, 2011 (76 FR
43898). That final rule responded to
comments and made numerous changes
from the proposed rule, resulting in
revised regulations that took effect on
July 14, 2011. In the final rule, the
Postal Service noted that certain aspects
of the proposed rule were subject to
then-ongoing consultations under 39
U.S.C. 1004(b)–(d). As a result, the first
final rule implemented only changes to
39 CFR part 241 that were not subject
to ongoing consultations. 76 FR 41413.
The Postal Service advised that changes
subject to consultation—namely, those
concerning the definition of
‘‘consolidation’’ and the staffing of Post
Offices—were being deferred and could
be addressed in a subsequent final rule.
Id. at 41414–15.
At this time, the consultations
referenced in the first final rule have
run their course, and the Postal Service
is prepared to issue the remaining
proposed changes, with minor
modifications as explained in section III
below. Analysis of the pertinent
comments received appears below. With
the changes described herein, the final
rule will take effect upon the
publication of corresponding changes in
SUMMARY:
E:\FR\FM\26OCR1.SGM
26OCR1
Agencies
[Federal Register Volume 76, Number 207 (Wednesday, October 26, 2011)]
[Rules and Regulations]
[Page 66184]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-27722]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0972]
Drawbridge Operation Regulation; Nanticoke, Seaford, DE
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
SR 13 Bridge across the Nanticoke River, mile 39.6, at Seaford, DE. The
deviation is necessary to accommodate the cleaning and painting of the
bridge. This deviation allows the bridge to remain in the closed
position throughout the month of November to facilitate the maintenance
work.
DATES: This deviation is effective from 12:01 a.m. on November 1, 2011
to 11:59 on November 30, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0972 and are available online
by going to https://www.regulations.gov, inserting USCG-2011-0972 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Lindsey Middleton, Bridge Management Specialist, Coast
Guard; telephone 757-398-6629, e-mail Lindsey.R.Middleton@uscg.mil. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Marinis Bros. Inc., on behalf of Delaware
Department of Transportation (DelDOT), has requested a temporary
deviation from the current operating regulation of the SR 13 Bridge
across the Nanticoke River, mile 39.6, at Seaford, DE. The requested
deviation is to accommodate painting and cleaning of the bridge. The
vertical clearance of this single-leaf bascule bridge is three feet at
mean high water (MHW) in the closed position and unlimited in the open
position. During this deviation period, the vertical clearance will be
limited to one foot at MHW due to the scaffolding that will be used for
the maintenance of the bridge. The bridge will remain in the closed
position for the entire month. In critical situations the bridge will
be able to open if at least 24 hours of notice is given. There are no
alternate routes available to vessels.
The current operating schedule for the bridge is set out in 33 CFR
117.243(b). According to that schedule, during the month of November
the bridge shall open on signal, except that from 6 p.m. to 8 a.m.
Monday through Friday and 3:30 p.m. through 7:30 a.m. Saturday and
Sunday, if at least four hours notice is given.
Logs from November 2010 have shown that there were 20 openings for
the entire month. Sixteen of those openings were on November 13th and
14th. The openings were due to a Bass Fishing Tournament; however, the
tournament is not scheduled for this year minimizing the amount of
anticipated openings. The majority of vessel traffic utilizing this
waterway is recreational boaters. There is one mariner that requests
most of the bridge openings throughout the winter months. Marinis
Bros., Inc. has coordinated with this mariner. DelDOT has coordinated
with the town concerning the month long bridge closure as well. The
Coast Guard will inform all other users of the waterway through our
Local and Broadcast Notices to Mariners so that mariners can arrange
their transits to minimize any impact caused by the temporary
deviation. The Coast Guard will also require the bridge owner to post
signs on either side of the bridge notifying mariners of the temporary
regulation change.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 12, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2011-27722 Filed 10-25-11; 8:45 am]
BILLING CODE 9110-04-P