Environmental Impact Statements; Notice of Availability, 65509-65510 [2011-27284]
Download as PDF
Federal Register / Vol. 76, No. 204 / Friday, October 21, 2011 / Notices
sroberts on DSK5SPTVN1PROD with NOTICES
FOR FURTHER INFORMATION CONTACT:
Requests for additional information on
the Draft SWEIS, including requests for
copies of the document, should be
directed to Ms. Linda Cohn by contact
methods shown above under
ADDRESSES.
For general information regarding the
DOE NEPA process, contact Ms. Carol
M. Borgstrom, Director, Office of NEPA
Policy and Compliance, GC–54, U.S.
Department of Energy, 1000
Independence Ave., SW., Washington,
DC 20585; by telephone at 202–586–
4600 or leave a message at 1–800–472–
2756; by electronic mail at
askNEPA@hq.doe.gov; or by facsimile at
202–586–7031. Additional information
regarding DOE NEPA activities is
available on the Internet through the
DOE NEPA Web site at https://
nnsa.energy.gov/nepa.
SUPPLEMENTARY INFORMATION: The Draft
SWEIS for the continued management
and operation of the Nevada National
Security Site (formerly known as the
Nevada Test Site) and other NNSAmanaged sites in Nevada, including the
Remote Sensing Laboratory on Nellis
Air Force Base, the North Las Vegas
Facility, and the Tonopah Test Range on
the U.S. Air Force Nevada Test and
Training Range, analyzes the potential
environmental impacts for three
alternatives: No Action, Expanded
Operations, and Reduced Operations.
Each alternative comprises current and
reasonably foreseeable activities at the
NNSS and three offsite locations in the
NNSA mission-associated programs in
Nevada of (1) the National Security/
Defense Mission, which includes the
Stockpile Stewardship and
Management, Nuclear Emergency
Response, Nonproliferation and
Counterterrorism, and Work for Others
Programs; (2) the Environmental
Management Mission, which includes
the Waste Management and
Environmental Restoration Programs;
and (3) the Nondefense Mission, which
includes the General Site Support and
Infrastructure, Energy Conservation and
Renewable Energy, and Other Research
and Development Programs.
The NNSA Nevada Site Office held
five public hearings to receive
comments on the Draft Site-Wide
Environmental Impact Statement for the
Continued Operation of the Department
of Energy/National Nuclear Security
Administration Nevada National
Security Site and Off-Site Locations in
the State of Nevada (Draft SWEIS, DOE/
EIS–0426D). In response to comments
received prior to and at the public
hearings, NNSA has decided to extend
the public comment period. The original
VerDate Mar<15>2010
18:11 Oct 20, 2011
Jkt 226001
NNSA Notice of Availability (76 FR
45548) indicated that the public
comment period would close on
October 27, 2011. The comment period
will now end on December 2, 2011.
Comments received after this date will
be considered to the extent practicable
as the Final NNSS SWEIS is prepared.
Signed in Washington, DC, on October 17,
2011.
Thomas P. D’Agostino,
Administrator, National Nuclear Security
Administration.
[FR Doc. 2011–27287 Filed 10–20–11; 8:45 am]
BILLING CODE P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8999–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 10/10/2011 Through 10/14/2011.
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110349, Final EIS, USFS, NV,
Ely Westside Rangeland Project,
Authorization of Livestock Grazing,
To Improve the Health of the Land
and To Protect Essential Ecosystem
Functions and Values,
Implementation, Humboldt-Toiyabe
National Forest, Lincoln, Nye, and
Pine Counties, NV, Review Period
Ends: 11/21/2011, Contact: Vern
Keller 775–355–5356.
EIS No. 20110350, Draft EIS, USFS, AZ,
Rosemont Copper Project, Proposed
Construction, Operation with
Concurrent Reclamation and Closure
of an Open-Pit Copper Mine,
Coronado National Forest, Pima
County, AZ, Comment Period Ends:
01/18/2012, Contact: Bev Everson
520–388–8300.
EIS No. 20110351, Final EIS, BLM, OR,
North Steens 230-kV Transmission
Line Project, Construction and
Operation of a Transmission Line and
Access Roads Associated with the
Echanis Wind Energy Project,
Authorizing Right-of-Way Grant,
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
65509
Harney County, OR, Review Period
Ends: 11/21/2011, Contact: Skip
Renchler 541–573–4443.
EIS No. 20110352, Final EIS, FHWA,
CA, Yerba Buena Island Ramps
Improvement Project on Interstate 80
(I–80), Proposals to Replace the
Existing Westbound on- and off-ramp,
Funding, San Francisco County, CA,
Review Period Ends: 11/21/2011,
Contact: Melanie Brent 510–286–
5231.
EIS No. 20110353, Draft EIS, USFS, UT,
Fishlake National Forest Oil and Gas
Leasing Analysis Project, To
Exploration, Development, and
Production of Mineral and Energy
Resources and Reclamation of
Activities, Beaver, Garfield, Iron, Juab,
Millard, Piute, Sanpete, Sevier, and
Wayne Counties, UT, Comment
Period Ends: 12/05/2011, Contact:
Diane Freeman 435–896–1050.
EIS No. 20110354, Draft EIS, NOAA,
AS, Fagatele Bay National Marine
Sanctuary, Management Plan,
Implementation, along the
southwestern coast of Tutuila Island,
AS, Comment Period Ends: 01/06/
2012, Contact: Gene Brighouse 684–
633–5155 Ext 264.
EIS No. 20110355, Final EIS, FHWA,
CA, Northwest Corridor
Improvements, I–75/I–575
Construction, New Alternative,
USACE Section 404 Permit, NPDES
Permit, Cobb and Cherokee Counties,
CA, Review Period Ends: 11/21/2011,
Contact: Rodney N. Barry 404–562–
3630.
EIS No. 20110356, Final EIS, BLM, AZ,
Sonoran Solar Energy Project,
Construction and Operation of a 3756megawatt (MW) Concentrated Solar
Thermal Power Plant and Ancillary
Facilities on 3,702 Areas, Right-ofWay Granting, Maricopa County, AZ,
Review Period Ends: 11/21/2011,
Contact: Joe Incardine 801–524–3833.
Amended Notices
EIS No. 20110241, Draft EIS, NNSA,
NV, Site-Wide EIS—Continued
Operation of the Department of
Energy/National Nuclear Security
Administration, Nevada National
Security Site and Off-Site Location in
Nevada, Comment Period Ends: 12/
02/2011, Contact: Linda M. Cohn
702–295–0077 Revision to FR Notice
Published 07/29/2011: Extending
Comment Period from 10/27/2011 to
12/02/2011.
E:\FR\FM\21OCN1.SGM
21OCN1
65510
Federal Register / Vol. 76, No. 204 / Friday, October 21, 2011 / Notices
Dated: October 18, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–27284 Filed 10–20–11; 8:45 am]
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
BILLING CODE 6560–50–P
[OMB Control No. 9000–0141; Docket 2011–
0079; Sequence 15]
FEDERAL RESERVE SYSTEM
Federal Acquisition Regulation;
Submission for OMB Review; Buy
American—Construction
Notice of Proposals To Engage in or
To Acquire Companies Engaged in
Permissible Nonbanking Activities
sroberts on DSK5SPTVN1PROD with NOTICES
The companies listed in this notice
have given notice under the Home
Owners’ Loan Act (HOLA) (12 U.S.C.
1461 et seq.), and Regulation LL (12 CFR
part 238) or Regulation MM (12 CFR
part 239) to engage de novo, or to
acquire or control voting securities or
assets of a company, including the
companies listed below, that engages
either directly or through a subsidiary or
other company, in a nonbanking activity
that is described in 238.53 or 238.54 of
Regulation LL (12 CFR 238.53 or 238.54)
or 239.8 of Regulation MM (12 CFR
239.8). Unless otherwise noted, these
activities will be conducted throughout
the United States.
Each notice is available for inspection
at the Federal Reserve Bank indicated.
The notice also will be available for
inspection at the offices of the Board of
Governors. Interested persons may
express their views in writing on the
question whether the proposal complies
with the standards of section
10a(c)(4)(B) of HOLA (12 U.S.C.
1467a(c)(4)(B)).
Unless otherwise noted, comments
regarding the applications must be
received at the Reserve Bank indicated
or the offices of the Board of Governors
not later than November 4, 2011.
A. Federal Reserve Bank of Kansas
City (Dennis Denney, Assistant Vice
President) 1 Memorial Drive, Kansas
City, Missouri 64198–0001:
1. Lincoln Federal Bancorp, Inc. and
Lincoln Federal Bancorp M.H.C., both in
Lincoln, Nebraska; to engage in real
estate development activities through
Stone Bridge Creek, L.L.C., Lincoln,
Nebraska, pursuant to section 239.8(a)
of Regulation MM.
Board of Governors of the Federal Reserve
System.
Dated: October 17, 2011.
Robert deV. Frierson,
Deputy Secretary of the Board.
[FR Doc. 2011–27238 Filed 10–20–11; 8:45 am]
BILLING CODE 6210–01–P
VerDate Mar<15>2010
18:11 Oct 20, 2011
Jkt 226001
Department of Defense (DOD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Notice of request for comments
regarding an extension to an existing
OMB clearance.
AGENCIES:
Under the provisions of the
Paperwork Reduction Act, the
Regulatory Secretariat will be
submitting to the Office of Management
and Budget (OMB) a request to review
and approve an extension of a
previously approved information
collection requirement concerning the
Buy American Act—Construction
(Grimberg Decision). A notice was
published in the Federal Register at 76
FR 40367, on July 8, 2011. No comments
were received.
Public comments are particularly
invited on: Whether this collection of
information is necessary for the proper
performance of functions of the FAR,
and whether it will have practical
utility; whether our estimate of the
public burden of this collection of
information is accurate, and based on
valid assumptions and methodology;
ways to enhance the quality, utility, and
clarity of the information to be
collected; and ways in which we can
minimize the burden of the collection of
information on those who are to
respond, through the use of appropriate
technological collection techniques or
other forms of information technology.
DATES: Submit comments on or before
November 21, 2011.
SUMMARY:
Ms.
Cecelia Davis, Procurement Analyst,
Acquisition Policy Division, GSA (202)
219–0202 or Cecelia.davis@gsa.gov.
ADDRESSES: Submit comments
identified by Information Collection
9000–0141, Buy American—
Construction, by any of the following
methods:
• Regulations.gov: https://
www.regulations.gov. Submit comments
via the Federal eRulemaking portal by
inputting ‘‘Information Collection 9000–
0141’’, Buy American—Construction,
FOR FURTHER INFORMATION CONTACT:
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
under the heading ‘‘Enter Keyword or
ID’’ and selecting ‘‘Search’’. Select the
link ‘‘Submit a Comment’’ that
corresponds with ‘‘Information
Collection 9000–0141’’, Buy
American—Construction. Follow the
instructions provided at the ‘‘Submit a
Comment’’ screen. Please include your
name, company name (if any), and
‘‘Information Collection 9000–0141’’,
Buy American—Construction, on your
attached document.
• Fax: 202–501–4067.
• Mail: General Services
Administration, Regulatory Secretariat
(MVCB), 1275 First Street, NE.,
Washington, DC 20417. Attn: Hada
Flowers/IC 9000–0141, Buy American—
Construction.
Instructions: Please submit comments
only and cite Information Collection
9000–0141, Buy American—
Construction, in all correspondence
related to this collection. All comments
received will be posted without change
to https://www.regulations.gov, including
any personal and/or business
confidential information provided.
SUPPLEMENTARY INFORMATION:
A. Purpose
The clauses at FAR 52.225–9, Buy
American Act—Construction Materials,
and FAR 52.225–11, Buy American
Act—Construction Materials under
Trade Agreements, provide that
offerors/contractors requesting to use
foreign construction material, other than
construction material eligible under a
trade agreement, shall provide adequate
information for Government evaluation
of the request.
These regulations implement 41
U.S.C. chapter 83, Buy American, for
construction.
B. Annual Reporting Burden
Respondents: 500.
Responses per Respondent: 2.
Annual Responses: 1,000.
Hours per Response: 2.5.
Total Burden Hours: 2,500.
Obtaining Copies of Proposals:
Requesters may obtain a copy of the
information collection documents from
the General Services Administration,
Regulatory Secretariat (MVCB), 1275
First Street, NE., Washington, DC 20417,
telephone (202) 501–4755. Please cite
OMB Control No. 9000–0141, Buy
American—Construction, in all
correspondence.
Dated: October 14, 2011.
Laura Auletta,
Acting Director, Office of Governmentwide
Acquisition Policy, Office of Acquisition
Policy.
[FR Doc. 2011–27333 Filed 10–20–11; 8:45 am]
BILLING CODE 6820–EP–P
E:\FR\FM\21OCN1.SGM
21OCN1
Agencies
[Federal Register Volume 76, Number 204 (Friday, October 21, 2011)]
[Notices]
[Pages 65509-65510]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-27284]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8999-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 10/10/2011 Through 10/14/2011.
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110349, Final EIS, USFS, NV, Ely Westside Rangeland Project,
Authorization of Livestock Grazing, To Improve the Health of the Land
and To Protect Essential Ecosystem Functions and Values,
Implementation, Humboldt-Toiyabe National Forest, Lincoln, Nye, and
Pine Counties, NV, Review Period Ends: 11/21/2011, Contact: Vern Keller
775-355-5356.
EIS No. 20110350, Draft EIS, USFS, AZ, Rosemont Copper Project,
Proposed Construction, Operation with Concurrent Reclamation and
Closure of an Open-Pit Copper Mine, Coronado National Forest, Pima
County, AZ, Comment Period Ends: 01/18/2012, Contact: Bev Everson 520-
388-8300.
EIS No. 20110351, Final EIS, BLM, OR, North Steens 230-kV Transmission
Line Project, Construction and Operation of a Transmission Line and
Access Roads Associated with the Echanis Wind Energy Project,
Authorizing Right-of-Way Grant, Harney County, OR, Review Period Ends:
11/21/2011, Contact: Skip Renchler 541-573-4443.
EIS No. 20110352, Final EIS, FHWA, CA, Yerba Buena Island Ramps
Improvement Project on Interstate 80 (I-80), Proposals to Replace the
Existing Westbound on- and off-ramp, Funding, San Francisco County, CA,
Review Period Ends: 11/21/2011, Contact: Melanie Brent 510-286-5231.
EIS No. 20110353, Draft EIS, USFS, UT, Fishlake National Forest Oil and
Gas Leasing Analysis Project, To Exploration, Development, and
Production of Mineral and Energy Resources and Reclamation of
Activities, Beaver, Garfield, Iron, Juab, Millard, Piute, Sanpete,
Sevier, and Wayne Counties, UT, Comment Period Ends: 12/05/2011,
Contact: Diane Freeman 435-896-1050.
EIS No. 20110354, Draft EIS, NOAA, AS, Fagatele Bay National Marine
Sanctuary, Management Plan, Implementation, along the southwestern
coast of Tutuila Island, AS, Comment Period Ends: 01/06/2012, Contact:
Gene Brighouse 684-633-5155 Ext 264.
EIS No. 20110355, Final EIS, FHWA, CA, Northwest Corridor Improvements,
I-75/I-575 Construction, New Alternative, USACE Section 404 Permit,
NPDES Permit, Cobb and Cherokee Counties, CA, Review Period Ends: 11/
21/2011, Contact: Rodney N. Barry 404-562-3630.
EIS No. 20110356, Final EIS, BLM, AZ, Sonoran Solar Energy Project,
Construction and Operation of a 3756-megawatt (MW) Concentrated Solar
Thermal Power Plant and Ancillary Facilities on 3,702 Areas, Right-of-
Way Granting, Maricopa County, AZ, Review Period Ends: 11/21/2011,
Contact: Joe Incardine 801-524-3833.
Amended Notices
EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued
Operation of the Department of Energy/National Nuclear Security
Administration, Nevada National Security Site and Off-Site Location in
Nevada, Comment Period Ends: 12/02/2011, Contact: Linda M. Cohn 702-
295-0077 Revision to FR Notice Published 07/29/2011: Extending Comment
Period from 10/27/2011 to 12/02/2011.
[[Page 65510]]
Dated: October 18, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-27284 Filed 10-20-11; 8:45 am]