Commission Information Collection Activities (FERC-510); Comment Request; Submitted for OMB Review, 64932-64933 [2011-26985]
Download as PDF
64932
Federal Register / Vol. 76, No. 202 / Wednesday, October 19, 2011 / Notices
Technologies Program, Mailstop EE–2J,
1000 Independence Avenue, SW.,
Washington, DC 20585–0121.
Telephone: (202) 586–2945. Please
submit one signed original paper copy.
• Hand Delivery/Courier: Ms. Brenda
Edwards, U.S. Department of Energy,
Building Technologies Program, 950
L’Enfant Plaza, SW., 6th Floor,
Washington, DC 20024. Please submit
one signed original paper copy.
Docket: For access to the docket to
read background documents or
comments received, please call Ms.
Brenda Edwards at the above telephone
number for additional information.
FOR FURTHER INFORMATION CONTACT:
Requests for additional information may
be sent to Ms. Kym Carey, U.S.
Department of Energy, Office of Energy
Efficiency and Renewable Energy,
Building Technologies Program, EE–2J,
1000 Independence Avenue, SW.,
Washington, DC 20585–0121.
Telephone: 202–287–1775. E-mail:
Kym.Carey@ee.doe.gov.
For legal issues contact Kavita
Vaidyanathan, U.S. Department of
Energy, Office of the General Counsel,
Forrestal Building, Mailstop GC–71,
1000 Independence Ave., SW.,
Washington, DC 20585, Telephone:
(202) 586–0669, E-mail:
kavita.vaidyanathan@hq.doe.gov.
On
September 13, 2011, the U.S.
Department of Energy (DOE or the
Department) published a request for
information (RFI) in the Federal
Register (76 FR 56413) to request
information on how the Department
may improve the methodology it
intends to use for assessing cost
effectiveness (which includes an energy
savings assessment) of changes to
residential building energy codes. The
RFI provided for the submission of
comments by October 13, 2011.
Commenters requested an extension of
the comment period given the extensive
analysis required to complete a
thorough response. DOE has determined
that a reopening of the public comment
period is appropriate based on the
complexity of the issues to be
considered in the analysis and the need
for interested parties to submit a
thorough response—and is hereby
reopening the comment period. DOE
will consider any comments received by
the date presented in the DATES section
of this notice.
emcdonald on DSK5VPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Further Information on Submitting
Comments
Under 10 CFR 1004.11, any person
submitting information that he or she
believes to be confidential and exempt
VerDate Mar<15>2010
16:34 Oct 18, 2011
Jkt 226001
by law from public disclosure should
submit two copies: one copy of the
document including all the information
believed to be confidential, and one
copy of the document with the
information believed to be confidential
deleted. DOE will make its own
determination about the confidential
status of the information and treat it
according to its determination.
Factors of interest to DOE when
evaluating requests to treat submitted
information as confidential include (1)
A description of the items, (2) whether
and why such items are customarily
treated as confidential within the
industry, (3) whether the information is
generally known by or available from
other sources, (4) whether the
information has previously been made
available to others without obligation
concerning its confidentiality, (5) an
explanation of the competitive injury to
the submitting person which would
result from public disclosure, (6) when
such information might lose its
confidential character due to the
passage of time, and (7) why disclosure
of the information would be contrary to
the public interest.
Issued in Washington, DC, on October 13,
2011.
Kathleen B. Hogan,
Deputy Assistant Secretary for Energy
Efficiency, Energy Efficiency and Renewable
Energy.
[FR Doc. 2011–27049 Filed 10–18–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC11–510–001]
Commission Information Collection
Activities (FERC–510); Comment
Request; Submitted for OMB Review
Federal Energy Regulatory
Commission.
ACTION: Notice.
AGENCY:
In compliance with the
requirements of section 3507 of the
Paperwork Reduction Act of 1995, 44
USC 3507, the Federal Energy
Regulatory Commission (Commission or
FERC) has submitted the information
collection described below to the Office
of Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
issued a Notice in the Federal Register
SUMMARY:
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
(76 FR 43996, 07/22/2011) requesting
public comments. FERC received no
comments on the FERC–510 and has
made this notation in its submission to
OMB.
DATES: Comments on the collection of
information are due by November 18,
2011.
Address comments on the
collection of information to the Office of
Management and Budget, Office of
Information and Regulatory Affairs,
Attention: Federal Energy Regulatory
Commission Desk Officer. Comments to
OMB should be filed electronically, c/o
oira_submission@omb.eop.gov and
include OMB Control Number 1902–
0068 for reference. The Desk Officer
may be reached by telephone at 202–
395–4718.
A copy of the comments should also
be sent to the Federal Energy Regulatory
Commission and should refer to Docket
No. IC11–510–001. Comments may be
filed either electronically or in paper
format. Those persons filing
electronically do not need to make a
paper filing. Documents filed
electronically via the Internet must be
prepared in an acceptable filing format
and in compliance with the Federal
Energy Regulatory Commission
submission guidelines. Complete filing
instructions and acceptable filing
formats are available at https://
www.ferc.gov/help/submissionguide.asp. To file the document
electronically, access the Commission’s
Web site and click on Documents &
Filing, E-Filing (https://www.ferc.gov/
docs-filing/efiling.asp), and then follow
the instructions for each screen. First
time users will have to establish a user
name and password. The Commission
will send an automatic
acknowledgement to the sender’s e-mail
address upon receipt of comments.
For paper filings, the comments
should be submitted to the Federal
Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street, NE., Washington, DC 20426, and
should refer to Docket No. IC11–510–
001.
Users interested in receiving
automatic notification of activity in
FERC Docket Number IC11–510 may do
so through eSubscription at https://
www.ferc.gov/docs-filing/
esubscription.asp. All comments may be
viewed, printed or downloaded
remotely via the Internet through
FERC’s homepage using the ‘‘eLibrary’’
link. For user assistance, contact
ferconlinesupport@ferc.gov or toll-free
at (866) 208–3676, or for TTY, contact
(202) 502–8659.
ADDRESSES:
E:\FR\FM\19OCN1.SGM
19OCN1
64933
Federal Register / Vol. 76, No. 202 / Wednesday, October 19, 2011 / Notices
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by e-mail
at DataClearance@FERC.gov, by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION: The
information collected under the
requirements of FERC–510,
‘‘Application for Surrender of
Hydropower License’’ (OMB No. 1902–
0068), is used by the Commission to
implement the statutory provisions of
sections 4(e), 6 and 13 of the Federal
Power Act (FPA) (16 U.S.C. sections
797(e), 799 and 806). Section 4(e) gives
the Commission authority to issue
licenses for the purposes of
constructing, operating and maintaining
dams, water conduits, reservoirs,
powerhouses, transmission lines or
other power project works necessary or
convenient for developing and
improving navigation, transmission and
utilization of power using bodies of
before issuing an order for Surrender of
a License. The order is the result of an
analysis of the information produced,
i.e., economic, environmental concerns,
etc., which are examined to determine
if the application for surrender is
warranted. The order implements the
existing regulations and is inclusive for
surrender of all types of hydropower
licenses issued by FERC and its
predecessor, the Federal Power
Commission. The Commission
implements these mandatory filing
requirements in the Code of Federal
Regulations (CFR) under 18 CFR 6.1–
6.4.
water over which Congress has
jurisdiction. Section 6 gives the
Commission the authority to prescribe
the conditions of licenses including the
revocation or surrender of the license.
Section 13 defines the Commission’s
authority to delegate time periods for
when a license must be terminated if
project construction has not begun.
Surrender of a license may be desired by
a licensee when a licensed project is
retired or not constructed or natural
catastrophes have damaged or destroyed
the project facilities. The information
collected under the designation FERC–
510 is in the form of a written
application for surrender of a
hydropower license. The information is
used by Commission staff to determine
the broad impact of such surrender. The
Commission will issue a notice
soliciting comments from the public and
other agencies and conduct a careful
review of the prepared application
The Commission is requesting a
three-year extension of the current
expiration date, with no changes to the
existing collection of data.
ACTION:
Public reporting
burden for this collection is estimated
as:
BURDEN STATEMENT:
Number of
responses per
respondent
(2)
Average burden
hours per
response
(3)
Total annual
burden hours
(1)×(2)×(3)
16 .....................................................................................................................................
emcdonald on DSK5VPTVN1PROD with NOTICES
Number of respondents annually
(1)
1
10
160
Estimated cost burden to respondents
is $10,952 (160 hours/2080 hours per
year times $142,372 per year average per
employee = $10,952(rounded)). The
estimated annual cost per respondent is
$685 (rounded).
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
disclose, or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing, and
utilizing technology and systems for the
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) adjusting the existing ways to
comply with any previously applicable
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
VerDate Mar<15>2010
17:56 Oct 18, 2011
Jkt 226001
benefit the whole organization rather
than any one particular function or
activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimates of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collections of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses.
Dated: October 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–26985 Filed 10–18–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14285–000]
Alaska Power Company, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 12, 2011, Alaska Power
Company, Inc., filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Moira Sound Hydroelectric
Project (Moira Sound Project or project)
to be located on Dickman, Kugel, Aiken,
Luelia, and Niblack Creeks; Lake Luelia,
Kugel and Aiken Lakes, and seven
unnamed lakes near Hollis, on Prince of
Wales Island in the Prince of Wales—
Hyder Census Area, Alaska. The project
as proposed would occupy 10,041 acres,
7,839 acres of which are lands of the
Tongass National Forest, managed by
the U.S. Forest Service. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
E:\FR\FM\19OCN1.SGM
19OCN1
Agencies
[Federal Register Volume 76, Number 202 (Wednesday, October 19, 2011)]
[Notices]
[Pages 64932-64933]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26985]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC11-510-001]
Commission Information Collection Activities (FERC-510); Comment
Request; Submitted for OMB Review
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of section 3507 of the
Paperwork Reduction Act of 1995, 44 USC 3507, the Federal Energy
Regulatory Commission (Commission or FERC) has submitted the
information collection described below to the Office of Management and
Budget (OMB) for review of the information collection requirements. Any
interested person may file comments directly with OMB and should
address a copy of those comments to the Commission as explained below.
The Commission issued a Notice in the Federal Register (76 FR 43996,
07/22/2011) requesting public comments. FERC received no comments on
the FERC-510 and has made this notation in its submission to OMB.
DATES: Comments on the collection of information are due by November
18, 2011.
ADDRESSES: Address comments on the collection of information to the
Office of Management and Budget, Office of Information and Regulatory
Affairs, Attention: Federal Energy Regulatory Commission Desk Officer.
Comments to OMB should be filed electronically, c/o oira_submission@omb.eop.gov and include OMB Control Number 1902-0068 for
reference. The Desk Officer may be reached by telephone at 202-395-
4718.
A copy of the comments should also be sent to the Federal Energy
Regulatory Commission and should refer to Docket No. IC11-510-001.
Comments may be filed either electronically or in paper format. Those
persons filing electronically do not need to make a paper filing.
Documents filed electronically via the Internet must be prepared in an
acceptable filing format and in compliance with the Federal Energy
Regulatory Commission submission guidelines. Complete filing
instructions and acceptable filing formats are available at https://www.ferc.gov/help/submission-guide.asp. To file the document
electronically, access the Commission's Web site and click on Documents
& Filing, E-Filing (https://www.ferc.gov/docs-filing/efiling.asp), and
then follow the instructions for each screen. First time users will
have to establish a user name and password. The Commission will send an
automatic acknowledgement to the sender's e-mail address upon receipt
of comments.
For paper filings, the comments should be submitted to the Federal
Energy Regulatory Commission, Secretary of the Commission, 888 First
Street, NE., Washington, DC 20426, and should refer to Docket No. IC11-
510-001.
Users interested in receiving automatic notification of activity in
FERC Docket Number IC11-510 may do so through eSubscription at https://www.ferc.gov/docs-filing/esubscription.asp. All comments may be viewed,
printed or downloaded remotely via the Internet through FERC's homepage
using the ``eLibrary'' link. For user assistance, contact
ferconlinesupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
[[Page 64933]]
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by e-mail
at DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax
at (202) 273-0873.
SUPPLEMENTARY INFORMATION: The information collected under the
requirements of FERC-510, ``Application for Surrender of Hydropower
License'' (OMB No. 1902-0068), is used by the Commission to implement
the statutory provisions of sections 4(e), 6 and 13 of the Federal
Power Act (FPA) (16 U.S.C. sections 797(e), 799 and 806). Section 4(e)
gives the Commission authority to issue licenses for the purposes of
constructing, operating and maintaining dams, water conduits,
reservoirs, powerhouses, transmission lines or other power project
works necessary or convenient for developing and improving navigation,
transmission and utilization of power using bodies of water over which
Congress has jurisdiction. Section 6 gives the Commission the authority
to prescribe the conditions of licenses including the revocation or
surrender of the license. Section 13 defines the Commission's authority
to delegate time periods for when a license must be terminated if
project construction has not begun. Surrender of a license may be
desired by a licensee when a licensed project is retired or not
constructed or natural catastrophes have damaged or destroyed the
project facilities. The information collected under the designation
FERC-510 is in the form of a written application for surrender of a
hydropower license. The information is used by Commission staff to
determine the broad impact of such surrender. The Commission will issue
a notice soliciting comments from the public and other agencies and
conduct a careful review of the prepared application before issuing an
order for Surrender of a License. The order is the result of an
analysis of the information produced, i.e., economic, environmental
concerns, etc., which are examined to determine if the application for
surrender is warranted. The order implements the existing regulations
and is inclusive for surrender of all types of hydropower licenses
issued by FERC and its predecessor, the Federal Power Commission. The
Commission implements these mandatory filing requirements in the Code
of Federal Regulations (CFR) under 18 CFR 6.1-6.4.
ACTION: The Commission is requesting a three-year extension of the
current expiration date, with no changes to the existing collection of
data.
BURDEN STATEMENT: Public reporting burden for this collection is
estimated as:
----------------------------------------------------------------------------------------------------------------
Number of Average burden Total annual
Number of respondents annually (1) responses per hours per burden hours
respondent (2) response (3) (1)x(2)x(3)
----------------------------------------------------------------------------------------------------------------
16..................................................... 1 10 160
----------------------------------------------------------------------------------------------------------------
Estimated cost burden to respondents is $10,952 (160 hours/2080
hours per year times $142,372 per year average per employee =
$10,952(rounded)). The estimated annual cost per respondent is $685
(rounded).
The reporting burden includes the total time, effort, or financial
resources expended to generate, maintain, retain, disclose, or provide
the information including: (1) Reviewing instructions; (2) developing,
acquiring, installing, and utilizing technology and systems for the
purposes of collecting, validating, verifying, processing, maintaining,
disclosing and providing information; (3) adjusting the existing ways
to comply with any previously applicable instructions and requirements;
(4) training personnel to respond to a collection of information; (5)
searching data sources; (6) completing and reviewing the collection of
information; and (7) transmitting, or otherwise disclosing the
information.
The estimate of cost for respondents is based upon salaries for
professional and clerical support, as well as direct and indirect
overhead costs. Direct costs include all costs directly attributable to
providing this information, such as administrative costs and the cost
for information technology. Indirect or overhead costs are costs
incurred by an organization in support of its mission. These costs
apply to activities which benefit the whole organization rather than
any one particular function or activity.
Comments are invited on: (1) Whether the proposed collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimates of the burden of
the proposed collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information to be collected; and (4) ways to
minimize the burden of the collections of information on those who are
to respond, including the use of appropriate automated, electronic,
mechanical, or other technological collection techniques or other forms
of information technology, e.g., permitting electronic submission of
responses.
Dated: October 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-26985 Filed 10-18-11; 8:45 am]
BILLING CODE 6717-01-P