Mandatory Reliability Standards for the Bulk-Power System; Notice of Staff Meeting, 64082-64083 [2011-26695]
Download as PDF
64082
Federal Register / Vol. 76, No. 200 / Monday, October 17, 2011 / Notices
the public interested in submitting
written comments may do so by
submitting them to the attention of
Jenelle Leonard, Designated Federal
Official, U.S. Department of Education,
and 400 Maryland Avenue, SW., Room
3W203, Washington, DC 20202–6400 by
October 28, 2011.
FOR FURTHER INFORMATION CONTACT:
Jenelle Leonard, Designated Federal
Official, U.S. Department of Education,
400 Maryland Avenue, SW.,
Washington, DC 20202. Telephone:
202–205–2161. Fax: 202–205–5870.
Detailed minutes of the meeting will
be available to the public within 14 days
of the meeting. Records are kept of all
Council proceedings and are available
for public inspection at the Office of
Indian Education, United States
Department of Education, 400 Maryland
Avenue, SW., Washington, DC 20202.
Monday–Friday, 8:30 a.m.—5 p.m.
Washington, DC time.
Electronic Access to This Document:
You may view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF) on the Internet at the
following site: https://www.ed.gov/news/
fedregister/
To use PDF you must have Adobe
Acrobat Reader, which is available free
at this site. If you have questions about
using PDF, call the U.S. Government
Printing Office (GPO), toll free at 1–866–
512–1830; or in the Washington, DC,
area at (202) 512–0000.
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations are available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Michael Yudin,
Acting Assistant Secretary for Elementary and
Secondary Education.
[FR Doc. 2011–26801 Filed 10–14–11; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on DSK4TPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG12–1–000.
Applicants: Agua Caliente Solar, LLC.
Description: Agua Caliente Solar, LLC
Notice of Self Certification of Exempt
Wholesale Generator Status.
VerDate Mar<15>2010
16:32 Oct 14, 2011
Jkt 226001
Filed Date: 10/04/2011.
Accession Number: 20111004–5142.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 25, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4500–001.
Applicants: Enel Stillwater, LLC.
Description: Enel Stillwater, LLC
submits tariff filing per 35: Enel
Stillwater, LLC MBR Tariff to be
effective 9/12/2011.
Filed Date: 10/04/2011.
Accession Number: 20111004–5178.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 25, 2011.
Docket Numbers: ER11–4618–001.
Applicants: White Pine Electric
Power.
Description: White Pine Electric
Power submits tariff filing per 35:
Market-Based Rate Tariff Compliance
Filing to be effective 9/23/2011.
Filed Date: 10/04/2011.
Accession Number: 20111004–5067.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 25, 2011.
Docket Numbers: ER12–22–000.
Applicants: Endure Energy, LLC.
Description: Endure Energy, LLC
submits tariff filing per 35.13(a)(2)(iii:
Amended Market Based Rate to be
effective 10/4/2011.
Filed Date: 10/04/2011.
Accession Number: 20111004–5136.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 25, 2011.
Docket Numbers: ER12–24–000.
Applicants: ML Partnership, LLC.
Description: ML Partnership, LLC
Notification of Cancellation.
Filed Date: 10/04/2011.
Accession Number: 20111004–5179.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 25, 2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Dated: October 5, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–26697 Filed 10–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. RM10–6–000]
Mandatory Reliability Standards for the
Bulk-Power System; Notice of Staff
Meeting
Take notice that the Federal Energy
Regulatory Commission staff will
conduct a Technical Discussion on the
reliability issues relating to ‘‘Single
Point of Failure on Protection Systems,’’
on Monday, October 24, from 1 p.m. to
approximately 5 p.m. and on Tuesday,
October 25, from 8 a.m. to
approximately noon. This staff meeting
will be held in Hearing Room #3 at the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Members of the Commission may
attend the conference.
The purpose of the meeting is to
discuss the reliability implications to
the interconnected transmission system
associated with a single point of failure
on protection systems. In Order No. 754,
the Commission approved NERC’s
interpretation of Requirement R1.3.10 of
Commission-approved transmission
planning Reliability Standard TPL–002–
0 (System Performance Following Loss
of a Single Bulk Electric System
Element).1 In addition, the Commission
stated that it believes there is an issue
concerning the study of a single point of
failure on protection systems.2 The
Commission directed Commission staff
to meet with NERC and appropriate
subject matter experts to explore this
reliability concern, including how it can
best be addressed, and identify any
additional actions necessary to address
the matter.3
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
1 Mandatory Reliability Standards for the BulkPower System, Order No. 693, FERC Stats. & Regs.
¶ 31,242, order on reh’g, Order No. 693–A, 120
FERC ¶ 61,053 (2007).
2 Interpretation of Transmission Planning
Reliability Standard, Order No. 754, 76 FR 58716
(September 22, 2011), 136 FERC ¶ 61,186, at P 19
(2011).
3 Id. at P 20. The Commission also directed NERC
to make an informational filing within six months
of the date of the issuance of the Final Rule.
E:\FR\FM\17OCN1.SGM
17OCN1
Federal Register / Vol. 76, No. 200 / Monday, October 17, 2011 / Notices
or 202–208–1659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
meeting, please contact: Sarah
McKinley, Office of External Affairs,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, (202) 502–8368,
sarah.mckinley@ferc.gov.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Western Area Power Administration
Loveland Area Projects—2025 Power
Marketing Initiative Proposal
[ Docket No. AD12–1–000]
Reliability Technical Conference;
Notice of Technical Conference
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the Southwest Power Pool, Inc. (SPP):
SPP Strategic Planning Committee
Meeting, October 13, 2011,8 a.m.–
3 p.m., Local Time.
The above-referenced meeting will be
held at: Doubletree Dallas, 4099 Valley
View Lane, Dallas, TX 75244.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
https://www.spp.org.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER10–1069–001,
Southwest Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER09–548–001, ITC Great
Plains, LLC.
Docket No. ER09–35–001, Tallgrass
Transmission, LLC.
Docket No. ER09–36–001, Prairie
Wind Transmission, LLC.
Docket No. ER09–36–002, Prairie
Wind Transmission, LLC.
For more information, contact Partha
Malvadkar, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6332 or
partha.malvadkar@ferc.gov.
Dated: October 7, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: October 7, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–26696 Filed 10–14–11; 8:45 am]
[FR Doc. 2011–26694 Filed 10–14–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
[FR Doc. 2011–26695 Filed 10–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
jlentini on DSK4TPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Take notice that the Federal Energy
Regulatory Commission will hold a
Technical Conference on Tuesday,
November 29, 2011, from 1 p.m. to
5 p.m. and Wednesday, November 30,
2011, from 9 a.m. to 4 p.m. This
Commissioner-led conference will be
held in the Commission Meeting Room
at the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. The conference
will be open for the public to attend,
and advance registration is not required.
The purpose of the conference is to
discuss policy issues related to
reliability of the Bulk-Power System.
The conference will explore the
progress made on the priorities for
addressing risks to reliability that were
identified in earlier Commission
technical conferences. The conference
also will discuss emerging issues,
including processes used by planning
authorities and other entities to identify
reliability concerns that may arise in the
course of compliance with
Environmental Protection Agency
regulations, and the tools and processes
(including tariffs and market rules)
available to address any identified
reliability concerns.
The agenda for this conference will be
issued at a later date. Information on
this event will be posted on the
Calendar of Events on the Commission’s
Web site, https://www.ferc.gov, prior to
the event.
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an e-mail to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–208–1659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
conference, please contact: Sarah
McKinley, Office of External Affairs,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, (202) 502–8368,
sarah.mckinley@ferc.gov.
Dated: October 7, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
VerDate Mar<15>2010
16:32 Oct 14, 2011
Jkt 226001
64083
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed 2025 Power
Marketing Initiative.
AGENCY:
Western Area Power
Administration (Western), Rocky
Mountain Region (RMR), a Federal
power marketing agency of the
Department of Energy (DOE), is seeking
comments on this proposed 2025 Power
Marketing Initiative (2025 PMI).
Western’s firm electric service contracts
associated with the current marketing
plan will expire September 30, 2024.
This proposed 2025 PMI provides the
basis for marketing the long-term firm
hydroelectric resources of the Loveland
Area Projects (LAP) beginning with the
Federal fiscal year 2025. The 2025 PMI
proposes to extend the current
marketing plan, with amendments to
key marketing plan principles. This
Federal Register notice initiates
Western’s public process for the
proposed 2025 PMI and requests public
comments. Western will prepare and
publish the final 2025 PMI in the
Federal Register after all public
comments are considered.
DATES: Entities and individuals
interested in commenting on the
proposed 2025 PMI must submit written
comments to Western’s RMR. Western
must receive written comments by
4 p.m. M.S.T., on Monday, January 30,
2012, and reserves the right to not
consider any comments received after
the deadline.
Western will hold two combined
public information and public comment
forums, not to exceed three hours each,
on the proposed 2025 PMI. On each
date, the public information forum will
immediately precede the public
comment forum.
The public information and public
comment forum dates and times are:
1. November 29, 2011, 9 a.m., M.S.T.,
Loveland, Colorado.
2. November 30, 2011, 1 p.m., C.S.T.,
Topeka, Kansas.
ADDRESSES: Submit written comments
regarding this proposed 2025 PMI to
Mr. Bradley S. Warren, Regional
Manager, Rocky Mountain Region,
Western Area Power Administration,
5555 East Crossroads Boulevard,
Loveland, CO 80538–8986. Comments
may also be faxed to (970) 461–7204, or
e-mailed to 2025PMI@wapa.gov.
SUMMARY:
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 76, Number 200 (Monday, October 17, 2011)]
[Notices]
[Pages 64082-64083]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26695]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Docket No. RM10-6-000]
Mandatory Reliability Standards for the Bulk-Power System; Notice
of Staff Meeting
Take notice that the Federal Energy Regulatory Commission staff
will conduct a Technical Discussion on the reliability issues relating
to ``Single Point of Failure on Protection Systems,'' on Monday,
October 24, from 1 p.m. to approximately 5 p.m. and on Tuesday, October
25, from 8 a.m. to approximately noon. This staff meeting will be held
in Hearing Room 3 at the Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. Members of the Commission
may attend the conference.
The purpose of the meeting is to discuss the reliability
implications to the interconnected transmission system associated with
a single point of failure on protection systems. In Order No. 754, the
Commission approved NERC's interpretation of Requirement R1.3.10 of
Commission-approved transmission planning Reliability Standard TPL-002-
0 (System Performance Following Loss of a Single Bulk Electric System
Element).\1\ In addition, the Commission stated that it believes there
is an issue concerning the study of a single point of failure on
protection systems.\2\ The Commission directed Commission staff to meet
with NERC and appropriate subject matter experts to explore this
reliability concern, including how it can best be addressed, and
identify any additional actions necessary to address the matter.\3\
---------------------------------------------------------------------------
\1\ Mandatory Reliability Standards for the Bulk-Power System,
Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g, Order
No. 693-A, 120 FERC ] 61,053 (2007).
\2\ Interpretation of Transmission Planning Reliability
Standard, Order No. 754, 76 FR 58716 (September 22, 2011), 136 FERC
] 61,186, at P 19 (2011).
\3\ Id. at P 20. The Commission also directed NERC to make an
informational filing within six months of the date of the issuance
of the Final Rule.
---------------------------------------------------------------------------
Commission conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an email to accessibility@ferc.gov or call toll free 1-866-208-
3372 (voice)
[[Page 64083]]
or 202-208-1659 (TTY), or send a fax to 202-208-2106 with the required
accommodations.
For more information about this meeting, please contact: Sarah
McKinley, Office of External Affairs, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426, (202) 502-8368,
sarah.mckinley@ferc.gov.
Dated: October 7, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-26695 Filed 10-14-11; 8:45 am]
BILLING CODE 6717-01-P