Federal Register / Vol. 76, No. 199 / Friday, October 14, 2011 / Notices
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11–4070, RITELine
Indiana et al.
Docket No. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER08–386 and ER09–1256,
Potomac-Appalachian Transmission
Highline, L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company.
Docket No. EL11–56, FirstEnergy
Service Company.
FOR MORE INFORMATION CONTACT:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: October 6, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–26570 Filed 10–13–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. PR09–16–000; PR09–16–001;
PR09–22–000; PR09–22–001]
Enogex LLC; Notice of Stipulation and
Agreement of Settlement and Notice of
Comment Period
tkelley on DSK3SPTVN1PROD with NOTICES
Take notice that on October 4, 2011,
Enogex LLC (Enogex) filed a Stipulation
and Agreement of Settlement
(Settlement) in the above-docketed
proceedings. Enogex states that it is the
parties’ belief that the Settlement will be
unopposed and will resolve all issues in
these dockets in their entirety. Included
in its filing was a request to set the
period for filing initial and reply
comments in response to the Settlement.
Notice is hereby given that the
deadline for filing initial comments is
Monday, October 24, 2011. Reply
comments should be filed on or before
Thursday, November 3, 2011.
Dated: October 6, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–26568 Filed 10–13–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:20 Oct 13, 2011
Jkt 226001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8999–5]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 10/03/2011 Through 10/07/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110341, Final EIS, FTA, NC,
LYNX—Blue Line Extension
Northeast Corridor Light Rail Project,
Proposed Light Rail Extension from
Center City Charlotte to I–485 near the
Mecklenburg-Cabarrus County Line,
Charlotte-Mecklenburg County, NC,
Review Period Ends: 11/14/2011,
Contact: Brian C. Smart 404–865–
5607.
EIS No. 20110342, Draft Supplement,
FHWA, CO, US 550 South Connection
to US 160, Updated Information to US
160 from Durango to Bayfield, US
Army COE Section 404 Permit,
LaPlata County, CO, Comment Period
Ends: 11/28/2011, Contact: Stephanie
Gibson 720–963–3013.
EIS No. 20110343, Final EIS, FHWA, WI,
Zoo Interchange Corridor Study,
Interstate I–94, I–894, and U.S.
Highway 45 (Zoo Interchange) 124th
Street to 70th Street Lincoln Avenue
to Burleigh Street, Milwaukee County,
WI, Review Period Ends: 11/14/2011,
Contact: Wesley Shemwell 608–829–
7521.
EIS No. 20110344, Draft EIS, USA, HI,
Programmatic—Pohakuloa Training
Area (PTA), Proposed Modernization
of Training Infrastructure to
Construction and Operation of an
Infantry Platoon Battle Area (IPBA),
HI, Comment Period Ends: 11/28/
2011, Contact: Lindy McDowell 210–
466–1593.
EIS No. 20110345, Draft EIS, APHIS, 00,
Glyphosate-Tolerant H7–1 Sugar
Beets, Request for Nonregulated
Status, United States, Comment
Period Ends: 11/28/2011, Contact:
Rebecca Stankiewicz Gabel, PhD 301–
734–5603.
EIS No. 20110346, Final Supplement,
USFS, NV, Martin Basin Rangeland
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Project, Updated Information on the
Analysis on the Effects of Livestock
Grazing on the Wilderness,
Reauthorizing Grazing on Eight
Existing Cattle and Horse Allotments:
Bradshaw, Buffalo, Buttermilk,
Granite Peak, Indian, Martin Basin,
Rebel Creek, and West Side Flat
Creek, Santa Rosa Ranger District,
Humboldt-Toiyabe National Forest,
NV, Review Period Ends: 11/14/2011,
Contact: Vern Keller 775–355–5356.
EIS No. 20110347, Final EIS, BLM, CA,
East County Substation/Tule Wind/
Energia Sierra Juarez Gen-Tie Projects,
Construction and Operation, Right-ofWay Grants, San Diego County, CA,
Review Period Ends: 11/14/2011,
Contact: Greg Thomsen 951–697–
5237.
EIS No. 20110348, Final EIS, BR, CA,
Upper Truckee River Restoration and
Golf Course Reconfiguration Project,
To Restore Natural Geomorphic
Ecological Process, Lake Tahoe, EL
Dorado County, CA, Review Period
Ends: 11/14/2011, Contact: Doug
Kleinsmith 916–978–5034.
Amended Notices
EIS No. 20110340, Draft EIS, BLM, CA,
Withdrawn—Walker Ridge Wind
Energy Generation Facility,
Construction, Operation and
Decommissioning of a Wind Energy
Generation Facility of up to 70
megawatts, Lake and Colusa Counties,
CA, Comment Period Ends: 11/21/
2011, Contact: Joseph Vieira 719–
852–6213.
Revision to FR Notice Published
10/07/2011: Officially.
Withdrawn by the preparing agency
by letter dated 10/05/2011.
Dated: October 10, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–26610 Filed 10–13–11; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
Sunshine Act Meeting
Pursuant to the provisions of the
‘‘Government in the Sunshine Act’’ (5
U.S.C. 552b), notice is hereby given that
at 10:36 a.m. on Tuesday, October 11,
2011, the Board of Directors of the
Federal Deposit Insurance Corporation
met in closed session to consider
matters related to the Corporation’s
supervision, corporate, and resolution
activities.
In calling the meeting, the Board
determined, on motion of Director
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 76, Number 199 (Friday, October 14, 2011)]
[Notices]
[Page 63922]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26610]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8999-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/03/2011 Through 10/07/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110341, Final EIS, FTA, NC, LYNX--Blue Line Extension
Northeast Corridor Light Rail Project, Proposed Light Rail Extension
from Center City Charlotte to I-485 near the Mecklenburg-Cabarrus
County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/
14/2011, Contact: Brian C. Smart 404-865-5607.
EIS No. 20110342, Draft Supplement, FHWA, CO, US 550 South Connection
to US 160, Updated Information to US 160 from Durango to Bayfield, US
Army COE Section 404 Permit, LaPlata County, CO, Comment Period Ends:
11/28/2011, Contact: Stephanie Gibson 720-963-3013.
EIS No. 20110343, Final EIS, FHWA, WI, Zoo Interchange Corridor Study,
Interstate I-94, I-894, and U.S. Highway 45 (Zoo Interchange) 124th
Street to 70th Street Lincoln Avenue to Burleigh Street, Milwaukee
County, WI, Review Period Ends: 11/14/2011, Contact: Wesley Shemwell
608-829-7521.
EIS No. 20110344, Draft EIS, USA, HI, Programmatic--Pohakuloa Training
Area (PTA), Proposed Modernization of Training Infrastructure to
Construction and Operation of an Infantry Platoon Battle Area (IPBA),
HI, Comment Period Ends: 11/28/2011, Contact: Lindy McDowell 210-466-
1593.
EIS No. 20110345, Draft EIS, APHIS, 00, Glyphosate-Tolerant H7-1 Sugar
Beets, Request for Nonregulated Status, United States, Comment Period
Ends: 11/28/2011, Contact: Rebecca Stankiewicz Gabel, PhD 301-734-5603.
EIS No. 20110346, Final Supplement, USFS, NV, Martin Basin Rangeland
Project, Updated Information on the Analysis on the Effects of
Livestock Grazing on the Wilderness, Reauthorizing Grazing on Eight
Existing Cattle and Horse Allotments: Bradshaw, Buffalo, Buttermilk,
Granite Peak, Indian, Martin Basin, Rebel Creek, and West Side Flat
Creek, Santa Rosa Ranger District, Humboldt-Toiyabe National Forest,
NV, Review Period Ends: 11/14/2011, Contact: Vern Keller 775-355-5356.
EIS No. 20110347, Final EIS, BLM, CA, East County Substation/Tule Wind/
Energia Sierra Juarez Gen-Tie Projects, Construction and Operation,
Right-of-Way Grants, San Diego County, CA, Review Period Ends: 11/14/
2011, Contact: Greg Thomsen 951-697-5237.
EIS No. 20110348, Final EIS, BR, CA, Upper Truckee River Restoration
and Golf Course Reconfiguration Project, To Restore Natural Geomorphic
Ecological Process, Lake Tahoe, EL Dorado County, CA, Review Period
Ends: 11/14/2011, Contact: Doug Kleinsmith 916-978-5034.
Amended Notices
EIS No. 20110340, Draft EIS, BLM, CA, Withdrawn--Walker Ridge Wind
Energy Generation Facility, Construction, Operation and Decommissioning
of a Wind Energy Generation Facility of up to 70 megawatts, Lake and
Colusa Counties, CA, Comment Period Ends: 11/21/2011, Contact: Joseph
Vieira 719-852-6213.
Revision to FR Notice Published 10/07/2011: Officially.
Withdrawn by the preparing agency by letter dated 10/05/2011.
Dated: October 10, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-26610 Filed 10-13-11; 8:45 am]