Environmental Impacts Statements; Notice of Availability, 63922 [2011-26610]

Download as PDF 63922 Federal Register / Vol. 76, No. 199 / Friday, October 14, 2011 / Notices Docket No. ER10–253 and EL10–14, Primary Power, L.L.C. Docket No. EL10–52, Central Transmission, LLC v. PJM Interconnection, L.L.C. Docket No. ER11–4070, RITELine Indiana et al. Docket No. ER11–2875 and EL11–20, PJM Interconnection, L.L.C. Docket No. ER08–386 and ER09–1256, Potomac-Appalachian Transmission Highline, L.L.C. Docket No. ER09–1589, FirstEnergy Service Company. Docket No. EL11–56, FirstEnergy Service Company. FOR MORE INFORMATION CONTACT: Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502– 6604 or jonathan.fernandez@ferc.gov. Dated: October 6, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–26570 Filed 10–13–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR09–16–000; PR09–16–001; PR09–22–000; PR09–22–001] Enogex LLC; Notice of Stipulation and Agreement of Settlement and Notice of Comment Period tkelley on DSK3SPTVN1PROD with NOTICES Take notice that on October 4, 2011, Enogex LLC (Enogex) filed a Stipulation and Agreement of Settlement (Settlement) in the above-docketed proceedings. Enogex states that it is the parties’ belief that the Settlement will be unopposed and will resolve all issues in these dockets in their entirety. Included in its filing was a request to set the period for filing initial and reply comments in response to the Settlement. Notice is hereby given that the deadline for filing initial comments is Monday, October 24, 2011. Reply comments should be filed on or before Thursday, November 3, 2011. Dated: October 6, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–26568 Filed 10–13–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 15:20 Oct 13, 2011 Jkt 226001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8999–5] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 10/03/2011 Through 10/07/2011 Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EIS are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20110341, Final EIS, FTA, NC, LYNX—Blue Line Extension Northeast Corridor Light Rail Project, Proposed Light Rail Extension from Center City Charlotte to I–485 near the Mecklenburg-Cabarrus County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/14/2011, Contact: Brian C. Smart 404–865– 5607. EIS No. 20110342, Draft Supplement, FHWA, CO, US 550 South Connection to US 160, Updated Information to US 160 from Durango to Bayfield, US Army COE Section 404 Permit, LaPlata County, CO, Comment Period Ends: 11/28/2011, Contact: Stephanie Gibson 720–963–3013. EIS No. 20110343, Final EIS, FHWA, WI, Zoo Interchange Corridor Study, Interstate I–94, I–894, and U.S. Highway 45 (Zoo Interchange) 124th Street to 70th Street Lincoln Avenue to Burleigh Street, Milwaukee County, WI, Review Period Ends: 11/14/2011, Contact: Wesley Shemwell 608–829– 7521. EIS No. 20110344, Draft EIS, USA, HI, Programmatic—Pohakuloa Training Area (PTA), Proposed Modernization of Training Infrastructure to Construction and Operation of an Infantry Platoon Battle Area (IPBA), HI, Comment Period Ends: 11/28/ 2011, Contact: Lindy McDowell 210– 466–1593. EIS No. 20110345, Draft EIS, APHIS, 00, Glyphosate-Tolerant H7–1 Sugar Beets, Request for Nonregulated Status, United States, Comment Period Ends: 11/28/2011, Contact: Rebecca Stankiewicz Gabel, PhD 301– 734–5603. EIS No. 20110346, Final Supplement, USFS, NV, Martin Basin Rangeland PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Project, Updated Information on the Analysis on the Effects of Livestock Grazing on the Wilderness, Reauthorizing Grazing on Eight Existing Cattle and Horse Allotments: Bradshaw, Buffalo, Buttermilk, Granite Peak, Indian, Martin Basin, Rebel Creek, and West Side Flat Creek, Santa Rosa Ranger District, Humboldt-Toiyabe National Forest, NV, Review Period Ends: 11/14/2011, Contact: Vern Keller 775–355–5356. EIS No. 20110347, Final EIS, BLM, CA, East County Substation/Tule Wind/ Energia Sierra Juarez Gen-Tie Projects, Construction and Operation, Right-ofWay Grants, San Diego County, CA, Review Period Ends: 11/14/2011, Contact: Greg Thomsen 951–697– 5237. EIS No. 20110348, Final EIS, BR, CA, Upper Truckee River Restoration and Golf Course Reconfiguration Project, To Restore Natural Geomorphic Ecological Process, Lake Tahoe, EL Dorado County, CA, Review Period Ends: 11/14/2011, Contact: Doug Kleinsmith 916–978–5034. Amended Notices EIS No. 20110340, Draft EIS, BLM, CA, Withdrawn—Walker Ridge Wind Energy Generation Facility, Construction, Operation and Decommissioning of a Wind Energy Generation Facility of up to 70 megawatts, Lake and Colusa Counties, CA, Comment Period Ends: 11/21/ 2011, Contact: Joseph Vieira 719– 852–6213. Revision to FR Notice Published 10/07/2011: Officially. Withdrawn by the preparing agency by letter dated 10/05/2011. Dated: October 10, 2011. Cliff Rader, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2011–26610 Filed 10–13–11; 8:45 am] BILLING CODE 6560–50–P FEDERAL DEPOSIT INSURANCE CORPORATION Sunshine Act Meeting Pursuant to the provisions of the ‘‘Government in the Sunshine Act’’ (5 U.S.C. 552b), notice is hereby given that at 10:36 a.m. on Tuesday, October 11, 2011, the Board of Directors of the Federal Deposit Insurance Corporation met in closed session to consider matters related to the Corporation’s supervision, corporate, and resolution activities. In calling the meeting, the Board determined, on motion of Director E:\FR\FM\14OCN1.SGM 14OCN1

Agencies

[Federal Register Volume 76, Number 199 (Friday, October 14, 2011)]
[Notices]
[Page 63922]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26610]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8999-5]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/03/2011 Through 10/07/2011
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20110341, Final EIS, FTA, NC, LYNX--Blue Line Extension 
Northeast Corridor Light Rail Project, Proposed Light Rail Extension 
from Center City Charlotte to I-485 near the Mecklenburg-Cabarrus 
County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/
14/2011, Contact: Brian C. Smart 404-865-5607.
EIS No. 20110342, Draft Supplement, FHWA, CO, US 550 South Connection 
to US 160, Updated Information to US 160 from Durango to Bayfield, US 
Army COE Section 404 Permit, LaPlata County, CO, Comment Period Ends: 
11/28/2011, Contact: Stephanie Gibson 720-963-3013.
EIS No. 20110343, Final EIS, FHWA, WI, Zoo Interchange Corridor Study, 
Interstate I-94, I-894, and U.S. Highway 45 (Zoo Interchange) 124th 
Street to 70th Street Lincoln Avenue to Burleigh Street, Milwaukee 
County, WI, Review Period Ends: 11/14/2011, Contact: Wesley Shemwell 
608-829-7521.
EIS No. 20110344, Draft EIS, USA, HI, Programmatic--Pohakuloa Training 
Area (PTA), Proposed Modernization of Training Infrastructure to 
Construction and Operation of an Infantry Platoon Battle Area (IPBA), 
HI, Comment Period Ends: 11/28/2011, Contact: Lindy McDowell 210-466-
1593.
EIS No. 20110345, Draft EIS, APHIS, 00, Glyphosate-Tolerant H7-1 Sugar 
Beets, Request for Nonregulated Status, United States, Comment Period 
Ends: 11/28/2011, Contact: Rebecca Stankiewicz Gabel, PhD 301-734-5603.
EIS No. 20110346, Final Supplement, USFS, NV, Martin Basin Rangeland 
Project, Updated Information on the Analysis on the Effects of 
Livestock Grazing on the Wilderness, Reauthorizing Grazing on Eight 
Existing Cattle and Horse Allotments: Bradshaw, Buffalo, Buttermilk, 
Granite Peak, Indian, Martin Basin, Rebel Creek, and West Side Flat 
Creek, Santa Rosa Ranger District, Humboldt-Toiyabe National Forest, 
NV, Review Period Ends: 11/14/2011, Contact: Vern Keller 775-355-5356.
EIS No. 20110347, Final EIS, BLM, CA, East County Substation/Tule Wind/
Energia Sierra Juarez Gen-Tie Projects, Construction and Operation, 
Right-of-Way Grants, San Diego County, CA, Review Period Ends: 11/14/
2011, Contact: Greg Thomsen 951-697-5237.
EIS No. 20110348, Final EIS, BR, CA, Upper Truckee River Restoration 
and Golf Course Reconfiguration Project, To Restore Natural Geomorphic 
Ecological Process, Lake Tahoe, EL Dorado County, CA, Review Period 
Ends: 11/14/2011, Contact: Doug Kleinsmith 916-978-5034.

Amended Notices

EIS No. 20110340, Draft EIS, BLM, CA, Withdrawn--Walker Ridge Wind 
Energy Generation Facility, Construction, Operation and Decommissioning 
of a Wind Energy Generation Facility of up to 70 megawatts, Lake and 
Colusa Counties, CA, Comment Period Ends: 11/21/2011, Contact: Joseph 
Vieira 719-852-6213.
    Revision to FR Notice Published 10/07/2011: Officially.
    Withdrawn by the preparing agency by letter dated 10/05/2011.

    Dated: October 10, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2011-26610 Filed 10-13-11; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.