Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment, 62802 [2011-26117]
Download as PDF
62802
Federal Register / Vol. 76, No. 196 / Tuesday, October 11, 2011 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 3, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–26123 Filed 10–7–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: October 3, 2011.
Kimberly D. Bose,
Secretary.
[Project No. 12715–003]
mstockstill on DSK4VPTVN1PROD with NOTICES
Fairlawn Hydroelectric Company, LLC;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380, the Office of Energy Projects has
reviewed the application for an original
license for the proposed 14,000-kilowatt
(kW) Jennings Randolph Hydroelectric
Project located on the North Branch
Potomac River in Garrett County,
Maryland and Mineral County, West
Virginia, at the U.S. Army Corps of
Engineers’ (Corps) Jennings Randolph
Dam and has prepared an
environmental assessment (EA). In the
EA, Commission staff assess the
potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major Federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The final EA may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
VerDate Mar<15>2010
20:47 Oct 07, 2011
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the EA should be filed
within 30 days from the issuance date
of this notice, and should be addressed
to the Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Room 1–A, Washington, DC
20426. Please affix ‘‘Jennings Randolph
Hydroelectric Project No. 12715–003’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
information contact Allyson Conner at
(202) 502–6082.
Jkt 226001
[FR Doc. 2011–26117 Filed 10–7–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[ Docket No. RC11–6–000]
North American Electric Reliability
Corporation; Notice of Filing
Take notice that on September 30,
2011, the North American Electric
Reliability Corporation (NERC) filed a
petition requesting Federal Energy
Regulatory Commission (Commission)
approval of new enforcement
mechanisms and submitted initial
informational filing regarding NERC’s
efforts to refocus implementation of its
compliance monitoring and
enforcement program.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
Frm 00048
Fmt 4703
Sfmt 4703
Dated: October 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–26116 Filed 10–7–11; 8:45 am]
DEPARTMENT OF ENERGY
PO 00000
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 21, 2011.
Federal Energy Regulatory
Commission
[Docket No. ER11–4672–000]
Griffiss Utility Services Corporation;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Griffiss
Utility Services Corporation’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\11OCN1.SGM
11OCN1
Agencies
[Federal Register Volume 76, Number 196 (Tuesday, October 11, 2011)]
[Notices]
[Page 62802]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26117]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12715-003]
Fairlawn Hydroelectric Company, LLC; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380, the Office of Energy Projects has reviewed the application for an
original license for the proposed 14,000-kilowatt (kW) Jennings
Randolph Hydroelectric Project located on the North Branch Potomac
River in Garrett County, Maryland and Mineral County, West Virginia, at
the U.S. Army Corps of Engineers' (Corps) Jennings Randolph Dam and has
prepared an environmental assessment (EA). In the EA, Commission staff
assess the potential environmental effects of licensing the project and
conclude that issuing a license for the project, with appropriate
environmental measures, would not constitute a major Federal action
significantly affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The final EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866)
208-3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Comments on the EA should be filed within 30 days from the issuance
date of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric
Project No. 12715-003'' to all comments. Comments may be filed
electronically via Internet in lieu of paper. The Commission strongly
encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``eFiling'' link. For further
information contact Allyson Conner at (202) 502-6082.
Dated: October 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-26117 Filed 10-7-11; 8:45 am]
BILLING CODE 6717-01-P