North American Electric Reliability Corporation; Notice of Filing, 62802 [2011-26116]

Download as PDF 62802 Federal Register / Vol. 76, No. 196 / Tuesday, October 11, 2011 / Notices Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 3, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–26123 Filed 10–7–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: October 3, 2011. Kimberly D. Bose, Secretary. [Project No. 12715–003] mstockstill on DSK4VPTVN1PROD with NOTICES Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for an original license for the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in Garrett County, Maryland and Mineral County, West Virginia, at the U.S. Army Corps of Engineers’ (Corps) Jennings Randolph Dam and has prepared an environmental assessment (EA). In the EA, Commission staff assess the potential environmental effects of licensing the project and conclude that issuing a license for the project, with appropriate environmental measures, would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The final EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. VerDate Mar<15>2010 20:47 Oct 07, 2011 You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the EA should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Jennings Randolph Hydroelectric Project No. 12715–003’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further information contact Allyson Conner at (202) 502–6082. Jkt 226001 [FR Doc. 2011–26117 Filed 10–7–11; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [ Docket No. RC11–6–000] North American Electric Reliability Corporation; Notice of Filing Take notice that on September 30, 2011, the North American Electric Reliability Corporation (NERC) filed a petition requesting Federal Energy Regulatory Commission (Commission) approval of new enforcement mechanisms and submitted initial informational filing regarding NERC’s efforts to refocus implementation of its compliance monitoring and enforcement program. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to Frm 00048 Fmt 4703 Sfmt 4703 Dated: October 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–26116 Filed 10–7–11; 8:45 am] DEPARTMENT OF ENERGY PO 00000 serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 21, 2011. Federal Energy Regulatory Commission [Docket No. ER11–4672–000] Griffiss Utility Services Corporation; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Griffiss Utility Services Corporation’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard E:\FR\FM\11OCN1.SGM 11OCN1

Agencies

[Federal Register Volume 76, Number 196 (Tuesday, October 11, 2011)]
[Notices]
[Page 62802]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-26116]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Docket No. RC11-6-000]


North American Electric Reliability Corporation; Notice of Filing

    Take notice that on September 30, 2011, the North American Electric 
Reliability Corporation (NERC) filed a petition requesting Federal 
Energy Regulatory Commission (Commission) approval of new enforcement 
mechanisms and submitted initial informational filing regarding NERC's 
efforts to refocus implementation of its compliance monitoring and 
enforcement program.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on October 21, 2011.

    Dated: October 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-26116 Filed 10-7-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.