[Project No. 12693–001]
Sutton Hydroelectric Company, LLC
Notice of Site Visit
On February 6, 2008, Sutton
Hydroelectric Company, LLC (Sutton
Hydroelectric) filed a notice of intent
and a preliminary application document
to license its proposed Sutton
Hydroelectric Project No. 12693. The
project would be located at the U.S.
Army Corps of Engineers’ (Corps)
Sutton Dam on the Elk River, in Braxton
County, West Virginia. The project
would occupy federal lands
administered by the Corps.
On April 7, 2008, the Commission
issued a Scoping Document containing
a description of the proposed project
and mode of operation, a preliminary
list of issues to be addressed in the
Commission’s National Environmental
Policy Act (NEPA) environmental
document, and a request for information
and written comments.
On October 12, 2011, at 9 a.m.
(E.D.T.), as part of the NEPA scoping
process, Commission staff will hold a
site visit at the Sutton Dam. All
participants interested in attending the
site visit should meet at the upstream
recreation parking lot next to the dam.
All participants attending the site visit
should be prepared to provide their own
transportation. If you have any
questions please contact Tim Konnert at
(202) 502–6359 or
timothy.konnert@ferc.gov.
Dated: September 28, 2011.
Kimberly D. Bose,
Secretary.
of Indians filed a competing NOI and
PAD for a license for the Seneca
Pumped Storage Project No. 13889–000.
Both FirstEnergy and the Seneca Nation
plan to use the Integrated Licensing
Process (ILP). The project is located at
the United States Army Corps of
Engineers’ Kinzua Dam, and to the
United States Forest Service Allegheny
National Forest, adjacent to the
Allegheny River and the Allegheny
Reservoir near the City of Warren, in
Warren County, Pennsylvania. The
project occupies 221.59 acres of federal
lands.
On January 28, 2011, the Commission
issued a Scoping Document containing
a description of the existing project and
proposed project facilities and mode of
operation, a preliminary list of issues to
be addressed in the Commission’s
National Environmental Policy Act
(NEPA) environmental document, and a
request for information and written
comments.
On October 25, 2011, at 9 a.m.
(E.D.T.), as part of the NEPA scoping
process, Commission staff will hold a
site visit at the Kinzua Pumped Storage
Project—Seneca Pumped Storage
Project. All participants interested in
attending the site visit should meet at
the Kinzua Dam Information Center
parking lot in Warren, Pennsylvania.
The information center is located below
Kinzua Dam adjacent to the Allegheny
River. All participants attending the site
visit should be prepared to provide their
own transportation. If you have any
question please contact Gaylord
Hoisington at (202) 502–6032 or
gaylord.hoisington@ferc.gov.
Dated: September 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–25630 Filed 10–4–11; 8:45 am]
[FR Doc. 2011–25632 Filed 10–4–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[EPA–HQ–OPP–2010–0896; FRL–9475–5]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; Worker Protection Standard
Training and Notification
[Project No. 2280–013; Seneca Nation of
Indians]
mstockstill on DSK4VPTVN1PROD with NOTICES
FirstEnergy Generation Corporation
Project No. 13889–000
Notice of Site Visit
On November 24, 2010, FirstEnergy,
the current licensee, filed a notice of
intent (NOI) and a pre-application
document (PAD) for a license to
continue to operate the Kinzua Pumped
Storage Project No. 2280–013. On
November 30, 2010, the Seneca Nation
VerDate Mar<15>2010
19:11 Oct 04, 2011
Jkt 226001
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that an Information
Collection Request (ICR) has been
SUMMARY:
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
61689
forwarded to the Office of Management
and Budget (OMB) for review and
approval: Worker Protection Standard
Training and Notification; EPA ICR No.
1759.06, OMB Control No. 2070–0148.
The ICR, which is abstracted below,
describes the nature of the information
collection and its estimated burden and
cost.
DATES: Additional comments may be
submitted on or before November 4,
2011.
Submit your comments,
referencing Docket ID No. EPA–HQ–
OPP–2010–0896, to (1) EPA online
using https://www.regulations.gov (our
preferred method), by e-mail to
opp.ncic@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Office of Pesticide
Programs (OPP) Regulatory Public
Docket (7502P), 1200 Pennsylvania
Ave., NW., Washington, DC 20460, and
(2) OMB by mail to: Office of
Information and Regulatory Affairs,
Office of Management and Budget
(OMB), Attention: Desk Officer for EPA,
725 17th Street, NW., Washington, DC
20503.
ADDRESSES:
Lily
Negash, (7506P), Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460;
telephone number: 703–347–8515; fax
number: 703–305–5884; e-mail address:
negash.lily@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On March 16, 2011 (76 FR 14390), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments. Any additional comments on
this ICR should be submitted to EPA
and OMB within 30 days of this notice.
EPA has established a public docket
for this ICR under Docket ID No. EPA–
HQ–OPP–2010–0896, which is available
for online viewing at http//
:www.regulations.gov, or in person
viewing at the OPP Regulatory Public
Docket in the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301
Constitution Ave., NW., Washington,
DC. The EPA/DC Public Reading Room
is open from 8 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Reading Room is 202–566–1744, and the
telephone number for the OPP
Regulatory Public Docket is (703) 305–
5805. Use https://www.regulations.gov to
submit or view public comments, access
the index listing of the contents of the
public docket, and to access those
documents in the public docket that are
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\05OCN1.SGM
05OCN1
Agencies
[Federal Register Volume 76, Number 193 (Wednesday, October 5, 2011)]
[Notices]
[Page 61689]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-25630]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2280-013; Seneca Nation of Indians]
FirstEnergy Generation Corporation Project No. 13889-000
Notice of Site Visit
On November 24, 2010, FirstEnergy, the current licensee, filed a
notice of intent (NOI) and a pre-application document (PAD) for a
license to continue to operate the Kinzua Pumped Storage Project No.
2280-013. On November 30, 2010, the Seneca Nation of Indians filed a
competing NOI and PAD for a license for the Seneca Pumped Storage
Project No. 13889-000. Both FirstEnergy and the Seneca Nation plan to
use the Integrated Licensing Process (ILP). The project is located at
the United States Army Corps of Engineers' Kinzua Dam, and to the
United States Forest Service Allegheny National Forest, adjacent to the
Allegheny River and the Allegheny Reservoir near the City of Warren, in
Warren County, Pennsylvania. The project occupies 221.59 acres of
federal lands.
On January 28, 2011, the Commission issued a Scoping Document
containing a description of the existing project and proposed project
facilities and mode of operation, a preliminary list of issues to be
addressed in the Commission's National Environmental Policy Act (NEPA)
environmental document, and a request for information and written
comments.
On October 25, 2011, at 9 a.m. (E.D.T.), as part of the NEPA
scoping process, Commission staff will hold a site visit at the Kinzua
Pumped Storage Project--Seneca Pumped Storage Project. All participants
interested in attending the site visit should meet at the Kinzua Dam
Information Center parking lot in Warren, Pennsylvania. The information
center is located below Kinzua Dam adjacent to the Allegheny River. All
participants attending the site visit should be prepared to provide
their own transportation. If you have any question please contact
Gaylord Hoisington at (202) 502-6032 or gaylord.hoisington@ferc.gov.
Dated: September 28, 2011.
Kimberly D. Bose,
Secretary.