Environmental Impacts Statements; Notice of Availability, 60822 [2011-25297]
Download as PDF
60822
Federal Register / Vol. 76, No. 190 / Friday, September 30, 2011 / Notices
that is placed in the public docket and
made available on the Internet. If you
submit an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD–ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses. For additional information
about EPA’s public docket visit the EPA
Docket Center homepage at https://
www.epa.gov/epahome/dockets.htm.
Docket: Documents in the docket are
listed in the https://www.regulations.gov
index. Although listed in the index,
some information is not publicly
available, e.g., CBI or other information
whose disclosure is restricted by statute.
Certain other materials, such as
copyrighted material, are publicly
available only in hard copy. Publicly
available docket materials are available
either electronically in https://
www.regulations.gov or in hard copy at
the OEI Docket in the EPA Headquarters
Docket Center.
Dated: September 20, 2011.
Darrell A. Winner,
Acting Director, National Center for
Environmental Assessment.
[FR Doc. 2011–25298 Filed 9–29–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8999–3]
Environmental Impacts Statements;
Notice of Availability
mstockstill on DSK4VPTVN1PROD with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/19/2011 Through 09/23/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110325, Final EIS, FHWA, 00,
I–69 Corridor—Section of
Independent Utility (SIU) No. 14,
Construction from Junction 1–20 near
VerDate Mar<15>2010
17:19 Sep 29, 2011
Jkt 223001
Haughton, LA to U.S. 82 near EL
Dorado, AR, Bossier, Claiborne and
Webster Parishes, LA and Columbia
and Union Counties, AR, Review
Period Ends: 11/10/2011, Contact:
Christi Wilson 504–837–6326.
EIS No. 20110326, Final EIS, USA, MT,
Limestone Hills Training Area
(LHTA) Withdrawal Project, To
Withdraw Federal Lands from within
the LHTA from DOI, Bureau of Land
Management for Transfer to Montana
Army National Guard for Military
Training Use, Broadwater County,
MT, Review Period Ends: 10/31/2011,
Contact: Sundi West 406–324–3088.
EIS No. 20110327, Draft EIS, BR, 00,
Klamath Facilities Removal Project,
Advance Restoration of the Salmonid
Fisheries Klamath Basin, Siskiyou
County, CA and Klamath County, OR,
Comment Period Ends: 11/21/2011,
Contact: Elizabeth Vasqueuz 916–
978–5055.
EIS No. 20110328, Draft EIS, NPS, CA,
Drakes Bay Oyster Company (DBOC)
Special Use Permit (SUP) for the
Period of 10 Years for its Shellfish
Operation, which Consists of
Commercial Production, Harvesting,
Processing, and Sale of Shellfish at
Point Reyes National Seashore, CA,
Comment Period Ends: 11/21/2011,
Contact: Cicely Muldoon 415–464–
5101.
EIS No. 20110329, Draft EIS, FHWA,
NC, U.S.–70 Havelock Bypass Project,
Construction of a New Location, 10mile, Four Land Divided, ControlledAccess Freeway for U.S.–70 around
the Southwest Side of the City of
Havelock and the Cherry Point U.S.
Marine Corps Air Station (MCAS),
Craven County, NC, Comment Period
Ends: 11/14/2011, Contact: Mark
Pierce 919–707–6035.
EIS No. 20110330, Draft EIS, USFS, 00,
Kiowa, Rita Blanca, Black Kettle, and
McClellan Creek National Grasslands
Land and Resource Management Plan,
Implementation, Mora, Harding,
Union, and Colfax Counties, NM;
Dallam, Hemphill, and Gray Counties,
TX; and Cimarron and Rogers Mills
Counties, OK, Comment Period Ends:
12/28/2011, Contact: Champe Green
505–346–3900.
EIS No. 20110331, Final EIS, NPS, MI,
Isle Royale National Park Wilderness
and Backcountry Management Plan,
Implementation, MI, Review Period
Ends: 10/31/2011, Contact: Phyllis
Green 906–482–0986.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
Dated: September 27, 2011.
James D. Gavin,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. 2011–25297 Filed 9–29–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2011–0282; FRL–8887–9]
Registration Review; Pesticide
Dockets Opened for Review and
Comment and Other Docket Actions
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has established
registration review dockets for the
pesticides listed in the table in Unit
III.A. With this document, EPA is
opening the public comment period for
these registration reviews. Registration
review is EPA’s periodic review of
pesticide registrations to ensure that
each pesticide continues to satisfy the
statutory standard for registration, that
is, the pesticide can perform its
intended function without unreasonable
adverse effects on human health or the
environment. Registration review
dockets contain information that will
assist the public in understanding the
types of information and issues that the
Agency may consider during the course
of registration reviews. Through this
program, EPA is ensuring that each
pesticide’s registration is based on
current scientific and other knowledge,
including its effects on human health
and the environment. EPA is also
announcing that the docket for methyl
nonyl ketone (MNK), which was
planned for September 2011, has been
delayed to FY 2012 (Q3). This document
also announces the Agency’s intent not
to open a registration review docket for
puccinia thlaspeos (case number 6013).
This pesticide does not currently have
any actively registered pesticide
products and is not, therefore,
scheduled for review under the
registration review program.
DATES: Comments must be received on
or before November 29, 2011.
ADDRESSES: Submit your comments
identified by the docket identification
(ID) number for the specific pesticide of
interest provided in the table in Unit
III.A., by one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
SUMMARY:
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 76, Number 190 (Friday, September 30, 2011)]
[Notices]
[Page 60822]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-25297]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8999-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/19/2011 Through 09/23/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110325, Final EIS, FHWA, 00, I-69 Corridor--Section of
Independent Utility (SIU) No. 14, Construction from Junction 1-20 near
Haughton, LA to U.S. 82 near EL Dorado, AR, Bossier, Claiborne and
Webster Parishes, LA and Columbia and Union Counties, AR, Review Period
Ends: 11/10/2011, Contact: Christi Wilson 504-837-6326.
EIS No. 20110326, Final EIS, USA, MT, Limestone Hills Training Area
(LHTA) Withdrawal Project, To Withdraw Federal Lands from within the
LHTA from DOI, Bureau of Land Management for Transfer to Montana Army
National Guard for Military Training Use, Broadwater County, MT, Review
Period Ends: 10/31/2011, Contact: Sundi West 406-324-3088.
EIS No. 20110327, Draft EIS, BR, 00, Klamath Facilities Removal
Project, Advance Restoration of the Salmonid Fisheries Klamath Basin,
Siskiyou County, CA and Klamath County, OR, Comment Period Ends: 11/21/
2011, Contact: Elizabeth Vasqueuz 916-978-5055.
EIS No. 20110328, Draft EIS, NPS, CA, Drakes Bay Oyster Company (DBOC)
Special Use Permit (SUP) for the Period of 10 Years for its Shellfish
Operation, which Consists of Commercial Production, Harvesting,
Processing, and Sale of Shellfish at Point Reyes National Seashore, CA,
Comment Period Ends: 11/21/2011, Contact: Cicely Muldoon 415-464-5101.
EIS No. 20110329, Draft EIS, FHWA, NC, U.S.-70 Havelock Bypass Project,
Construction of a New Location, 10-mile, Four Land Divided, Controlled-
Access Freeway for U.S.-70 around the Southwest Side of the City of
Havelock and the Cherry Point U.S. Marine Corps Air Station (MCAS),
Craven County, NC, Comment Period Ends: 11/14/2011, Contact: Mark
Pierce 919-707-6035.
EIS No. 20110330, Draft EIS, USFS, 00, Kiowa, Rita Blanca, Black
Kettle, and McClellan Creek National Grasslands Land and Resource
Management Plan, Implementation, Mora, Harding, Union, and Colfax
Counties, NM; Dallam, Hemphill, and Gray Counties, TX; and Cimarron and
Rogers Mills Counties, OK, Comment Period Ends: 12/28/2011, Contact:
Champe Green 505-346-3900.
EIS No. 20110331, Final EIS, NPS, MI, Isle Royale National Park
Wilderness and Backcountry Management Plan, Implementation, MI, Review
Period Ends: 10/31/2011, Contact: Phyllis Green 906-482-0986.
Dated: September 27, 2011.
James D. Gavin,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2011-25297 Filed 9-29-11; 8:45 am]
BILLING CODE 6560-50-P