Bellwood Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 60016 [2011-24959]
Download as PDF
60016
Federal Register / Vol. 76, No. 188 / Wednesday, September 28, 2011 / Notices
gaylord.hoisington@ferc.gov for more
information.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24958 Filed 9–27–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14252–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Bellwood Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 9, 2011, Bellwood Hydro,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Bellwood Pumped Storage Project to be
located on Tipton Run in Blair County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) A new 3,700-foot-long, 275-foothigh rock or earth fill main dam and a
new 2,500-foot-long, 60-foot-high rock
or earth fill saddle dam forming an
upper reservoir having a surface area of
101 acres and a total storage capacity of
10,600 acre-feet at a normal maximum
operating elevation of 2,440 feet mean
sea level (msl); (2) a new 1,530-footlong, 185-foot-high rock or earth fill
dam forming a lower reservoir having a
surface area of 120 acres and a total
storage capacity of 9,400 acre-feet at a
normal maximum operating level of
1,460 feet msl; (3) a 30-foot-diameter,
2,570-foot-long steel or concrete power
tunnel that extends from the upper
reservoir to a 1,200-foot-long vertical
shaft connecting the power tunnel to the
penstock; (4) a 1,000-foot-long steellined penstock; (5) a 290-foot-long by
140-foot-wide by 120-foot-high
underground powerhouse containing
three turbine units with a rated capacity
of 250 megawatts each; (6) a 40-footdiameter, 4,000-foot-long tailrace tunnel
connecting the turbine draft tubes with
the lower reservoir; (7) a 500-kilovolt,
7.3-mile-long transmission line; and (8)
VerDate Mar<15>2010
18:20 Sep 27, 2011
Jkt 223001
appurtenant facilities. The project
would have an annual generation of
1,973 gigawatt-hours.
Applicant Contact: Vincent Lamarra,
Bellwood Hydro, LLC, 975 South State
Highway 89/91, Logan, UT 84321;
phone: (435) 752–2580.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14252–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24959 Filed 9–27–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–545–000]
Tennessee Gas Pipeline Company;
Notice of Request Under Blanket
Authorization
Take notice that on September 9,
2011, Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002 filed a prior
notice request in accordance with
sections 157.205, 157.216(b) of the
Federal Energy Regulatory
Commission’s (Commission)
Regulations under the Natural Gas Act
and Tennessee’s authorization in Docket
No. CP82–413–000, to abandon in place
and by removal an inactive supply
lateral designated as Line No. 524C–900
(Supply Lateral) and associated meters
and appurtenances located in Lafourche
Parish, Louisiana and extending into the
state waters of offshore Louisiana in the
Bay Marchand Area, all as more fully set
forth in the application, which is open
to the public for inspection. The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to
Thomas G. Joyce, Manager, Certificates
& Compliance, Tennessee Gas Pipeline
Company, 1001 Louisiana Street, or
telephone (713) 420–3299, or fax (713)
420–160 or by e-mail
tom.joyce@elpaso.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 76, Number 188 (Wednesday, September 28, 2011)]
[Notices]
[Page 60016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24959]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14252-000]
Bellwood Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On August 9, 2011, Bellwood Hydro, LLC, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Bellwood Pumped
Storage Project to be located on Tipton Run in Blair County,
Pennsylvania. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of: (1) A new 3,700-foot-long,
275-foot-high rock or earth fill main dam and a new 2,500-foot-long,
60-foot-high rock or earth fill saddle dam forming an upper reservoir
having a surface area of 101 acres and a total storage capacity of
10,600 acre-feet at a normal maximum operating elevation of 2,440 feet
mean sea level (msl); (2) a new 1,530-foot-long, 185-foot-high rock or
earth fill dam forming a lower reservoir having a surface area of 120
acres and a total storage capacity of 9,400 acre-feet at a normal
maximum operating level of 1,460 feet msl; (3) a 30-foot-diameter,
2,570-foot-long steel or concrete power tunnel that extends from the
upper reservoir to a 1,200-foot-long vertical shaft connecting the
power tunnel to the penstock; (4) a 1,000-foot-long steel-lined
penstock; (5) a 290-foot-long by 140-foot-wide by 120-foot-high
underground powerhouse containing three turbine units with a rated
capacity of 250 megawatts each; (6) a 40-foot-diameter, 4,000-foot-long
tailrace tunnel connecting the turbine draft tubes with the lower
reservoir; (7) a 500-kilovolt, 7.3-mile-long transmission line; and (8)
appurtenant facilities. The project would have an annual generation of
1,973 gigawatt-hours.
Applicant Contact: Vincent Lamarra, Bellwood Hydro, LLC, 975 South
State Highway 89/91, Logan, UT 84321; phone: (435) 752-2580.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14252-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-24959 Filed 9-27-11; 8:45 am]
BILLING CODE 6717-01-P