Federal Register / Vol. 76, No. 188 / Wednesday, September 28, 2011 / Notices
60015
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 11, 2011.
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 14, 2011.
Dated: September 20, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24884 Filed 9–27–11; 8:45 am]
[FR Doc. 2011–24957 Filed 9–27–11; 8:45 am]
[FR Doc. 2011–24956 Filed 9–27–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EF11–12–000]
[Docket No. EF11–13–000]
Southeastern Power Administration;
Notice of Filing
[Project No. 2280–013; Project No. 13889–
000]
Southeastern Power Administration;
Notice of Filing
sroberts on DSK5SPTVN1PROD with NOTICES
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 11, 2011.
Docket Numbers: ER11–4574–000.
Applicants: PJM Interconnection,
LLC, Trans-Allegheny Interstate Line
Company.
Description: PJM Interconnection,
LLC submits tariff filing per
35.13(a)(2)(iii: TrAILCo submits
revisions to PJM Tariff Attachment H–
18 to be effective 11/19/2011.
Filed Date: 09/20/2011.
Accession Number: 20110920–5067.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 11, 2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Take notice that on September 8,
2011, the Southeastern Power
Administration submitted its Rate Order
No. SEPA–54 concerning rate and
repayment data for the Jim Woodruff
System, for confirmation and approval
on a final basis, effective September 20,
2011, and ending September 19, 2016.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
Take notice that on September 14,
2011, the Southeastern Power
Administration submitted its Rate Order
No. SEPA–55 concerning rate and
repayment data for the Cumberland
System, for confirmation and approval
on a final basis, effective October 1,
2011, and ending September 30, 2013.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
VerDate Mar<15>2010
18:20 Sep 27, 2011
Jkt 223001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
FirstEnergy Generation Corporation;
Seneca Nation of Indians; Notice of
Tribal Consultation Meeting
The Commission will hold a
Government to Government/Tribal
Consultation meeting on September 28,
2011, at 9:30 a.m. The meeting will be
held at the following location: Seneca
Allegheny Administration Building, 90
Ohio:yo’ Way, Salamanca, NY 14779.
The meeting will be transcribed by a
court reporter, so that the transcript can
be placed in the record of this
proceeding.
If you have any questions, contact
Gaylord Hoisington at (202) 502–6032 or
E:\FR\FM\28SEN1.SGM
28SEN1
60016
Federal Register / Vol. 76, No. 188 / Wednesday, September 28, 2011 / Notices
gaylord.hoisington@ferc.gov for more
information.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24958 Filed 9–27–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14252–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Bellwood Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 9, 2011, Bellwood Hydro,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Bellwood Pumped Storage Project to be
located on Tipton Run in Blair County,
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) A new 3,700-foot-long, 275-foothigh rock or earth fill main dam and a
new 2,500-foot-long, 60-foot-high rock
or earth fill saddle dam forming an
upper reservoir having a surface area of
101 acres and a total storage capacity of
10,600 acre-feet at a normal maximum
operating elevation of 2,440 feet mean
sea level (msl); (2) a new 1,530-footlong, 185-foot-high rock or earth fill
dam forming a lower reservoir having a
surface area of 120 acres and a total
storage capacity of 9,400 acre-feet at a
normal maximum operating level of
1,460 feet msl; (3) a 30-foot-diameter,
2,570-foot-long steel or concrete power
tunnel that extends from the upper
reservoir to a 1,200-foot-long vertical
shaft connecting the power tunnel to the
penstock; (4) a 1,000-foot-long steellined penstock; (5) a 290-foot-long by
140-foot-wide by 120-foot-high
underground powerhouse containing
three turbine units with a rated capacity
of 250 megawatts each; (6) a 40-footdiameter, 4,000-foot-long tailrace tunnel
connecting the turbine draft tubes with
the lower reservoir; (7) a 500-kilovolt,
7.3-mile-long transmission line; and (8)
VerDate Mar<15>2010
18:20 Sep 27, 2011
Jkt 223001
appurtenant facilities. The project
would have an annual generation of
1,973 gigawatt-hours.
Applicant Contact: Vincent Lamarra,
Bellwood Hydro, LLC, 975 South State
Highway 89/91, Logan, UT 84321;
phone: (435) 752–2580.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14252–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24959 Filed 9–27–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–545–000]
Tennessee Gas Pipeline Company;
Notice of Request Under Blanket
Authorization
Take notice that on September 9,
2011, Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002 filed a prior
notice request in accordance with
sections 157.205, 157.216(b) of the
Federal Energy Regulatory
Commission’s (Commission)
Regulations under the Natural Gas Act
and Tennessee’s authorization in Docket
No. CP82–413–000, to abandon in place
and by removal an inactive supply
lateral designated as Line No. 524C–900
(Supply Lateral) and associated meters
and appurtenances located in Lafourche
Parish, Louisiana and extending into the
state waters of offshore Louisiana in the
Bay Marchand Area, all as more fully set
forth in the application, which is open
to the public for inspection. The filing
may also be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to
Thomas G. Joyce, Manager, Certificates
& Compliance, Tennessee Gas Pipeline
Company, 1001 Louisiana Street, or
telephone (713) 420–3299, or fax (713)
420–160 or by e-mail
tom.joyce@elpaso.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 76, Number 188 (Wednesday, September 28, 2011)]
[Notices]
[Pages 60015-60016]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24958]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2280-013; Project No. 13889-000]
FirstEnergy Generation Corporation; Seneca Nation of Indians;
Notice of Tribal Consultation Meeting
The Commission will hold a Government to Government/Tribal
Consultation meeting on September 28, 2011, at 9:30 a.m. The meeting
will be held at the following location: Seneca Allegheny Administration
Building, 90 Ohio:yo' Way, Salamanca, NY 14779.
The meeting will be transcribed by a court reporter, so that the
transcript can be placed in the record of this proceeding.
If you have any questions, contact Gaylord Hoisington at (202) 502-
6032 or
[[Page 60016]]
gaylord.hoisington@ferc.gov for more information.
Dated: September 21, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-24958 Filed 9-27-11; 8:45 am]