Energy Conservation Program for Consumer Products: Publication of the Extension of Interim Waiver Granted to Samsung Electronics America, Inc. From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure, 59394-59395 [2011-24611]
Download as PDF
59394
Federal Register / Vol. 76, No. 186 / Monday, September 26, 2011 / Notices
www.oakridge.doe.gov/em/ssab/
minutes.htm.
Issued at Washington, DC on September
21, 2011.
LaTanya R. Butler,
Acting Deputy Committee Management
Officer.
[FR Doc. 2011–24614 Filed 9–23–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Bonneville Power Administration
Big Eddy-Knight Transmission Project
Bonneville Power
Administration (BPA), Department of
Energy (DOE).
ACTION: Notice of Availability of Record
of Decision (ROD).
AGENCY:
This notice announces the
availability of the ROD to implement the
Big Eddy-Knight Transmission Project
in Wasco County, Oregon and Klickitat
County, Washington. Construction of
the Big Eddy-Knight Transmission
Project will accommodate long-term
firm transmission requests that BPA has
received by increasing BPA’s 500-kV
transmission capability to move power
from the east side of the Cascade
Mountains (along the Oregon/
Washington border) to load centers
(such as Portland, Oregon) on the west
side of the Cascades and to major
transmission lines serving California.
As described in the Big Eddy-Knight
Transmission Project Final
Environmental Impact Statement (EIS)
(DOE/EIS–0421, July 2011), this project
consists primarily of constructing a
new, approximately 28-mile-long, 500kilovolt (kV) transmission line and
ancillary facilities between BPA’s
existing Big Eddy Substation in The
Dalles, Oregon, to a proposed new
Knight Substation that would be
connected to an existing BPA line about
4 miles northwest of Goldendale,
Washington. For the transmission line,
BPA has decided to build East
Alternative Option 3. For the first 14
miles, the line will use double-circuit
towers (combining the new line and an
existing line on one set of towers)
mostly on existing right-of-way. The
remaining 14 miles of the new line will
be built with single-circuit towers in a
newly-established 150-foot wide
transmission line right-of-way. BPA has
also decided to build the small (about 1
mile) realignment of the East Alternative
on the Oregon side of the Columbia
River, as described in the final EIS. For
the proposed new Knight Substation,
BPA has decided to build Knight
jlentini on DSK4TPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:37 Sep 23, 2011
Jkt 223001
Substation on Site 1, which is on private
property about 0.5 mile west of Knight
Road. For the fiber optic cable necessary
for system communications, BPA has
decided to build the Loop Back Option,
which will string fiber optic cable on
the new transmission towers from BPA’s
Big Eddy Substation to the new Knight
Substation and back again. The project
also includes new equipment at BPA’s
existing Big Eddy and Wautoma
substations. BPA will install about 134
new lattice-steel transmission towers
that will have an average span length
between towers of about 1,200 feet. The
double-circuit towers that will be used
for the first 14 miles will range in height
from about 170–250 feet tall; the singlecircuit towers that will be used for the
last 14 miles will be about 108–200 feet
tall. The towers on either side of the
Columbia River will be about 407 feet
tall on the Oregon side and 232 feet tall
on the Washington side.
The conductor, fiber optic cable, and
overhead ground wire for the new
transmission line will be placed on
these towers, and counterpoise (which
takes any lightning charge from the
overhead ground wire and dissipates it
into the earth) will be buried in the
ground at select towers. Marker balls
will be placed on the overhead ground
wire across the Columbia River and bird
diverters will be installed on overhead
ground wire at select locations. The
towers on either side of the Columbia
River will have lighting for aircraft
safety. Road construction will include
about 16 miles of new road, 9 miles of
temporary road, 13 miles of existing
road improvements, and 62 culverts in
intermittent streams (many stream
crossings will have more than 1 culvert).
In addition, portions of county roads
that will be used to access the line route
will be improved as necessary.
All mitigation measures identified in
the EIS that are applicable to the
selected alternative are adopted.
Copies of the ROD and EIS
may be obtained by calling BPA’s tollfree document request line, 1–800–622–
4520. The ROD and EIS are also
available on our Web site, https://
www.bpa.gov/go/BEK.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Stacy Mason, Bonneville Power
Administration—KEC–4, P.O. Box 3621,
Portland, Oregon 97208–3621; toll-free
telephone number 1–800–622–4519; fax
number 503–230–5455; or e-mail
slmason@bpa.gov.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Issued in Portland, Oregon, on
September 16, 2011.
Stephen J. Wright,
Administrator and Chief Executive Officer.
[FR Doc. 2011–24610 Filed 9–23–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Office of Energy Efficiency and
Renewable Energy
[Case No. RF–018]
Energy Conservation Program for
Consumer Products: Publication of the
Extension of Interim Waiver Granted to
Samsung Electronics America, Inc.
From the Department of Energy
Residential Refrigerator and
Refrigerator-Freezer Test Procedure
Office of Energy Efficiency and
Renewable Energy, Department of
Energy.
ACTION: Notice of extension of interim
waiver.
AGENCY:
On March 25, 2011, the
Department of Energy (DOE) published
in the Federal Register a petition for
waiver and notice granting an
application for interim waiver to
Samsung Electronics America, Inc.
(Samsung) from energy efficiency test
procedure requirements that are
applicable to residential refrigerators
and refrigerator-freezers. In today’s
action, DOE is extending the interim
waiver for 180 days.
FOR FURTHER INFORMATION CONTACT:
Dr. Michael G. Raymond, U.S.
Department of Energy, Building
Technologies Program, Mailstop EE–
2J, 1000 Independence Avenue, SW.,
Washington, DC 20585–0121.
Telephone: (202) 586–9611. E-mail:
Michael.Raymond@ee.doe.gov.
Ms. Elizabeth Kohl, U.S. Department of
Energy, Office of the General Counsel,
Mail Stop GC–71, 1000 Independence
Avenue, SW., Washington, DC 20585–
0103, (202) 586–7796; E-mail:
Elizabeth.Kohl@hq.doe.gov.
SUMMARY:
On March
18, 2011, DOE granted to Samsung an
interim waiver from the energy
efficiency test procedure requirements
in 10 CFR part 430 that are applicable
to Samsung’s electric refrigerators and
refrigerator-freezers that incorporate
multiple defrost cycles, and requested
comments on Samsung’s petition. 76 FR
16760 (March 25, 2011). Pursuant to 10
CFR 430.27(h), an interim waiver will
terminate 180 days after issuance or
upon the determination on the petition
for waiver, whichever occurs first. An
SUPPLEMENTARY INFORMATION:
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 76, No. 186 / Monday, September 26, 2011 / Notices
interim waiver may be extended by DOE
for 180 days. Notice of such extension
and/or any modification of the terms or
duration of the interim waiver shall be
published in the Federal Register and
shall be based on relevant information
contained in the record and any
comments received subsequent to
issuance of the interim waiver.
On August 17, 2011, Samsung
requested an extension of its interim
waiver. DOE recently published a notice
reopening the comment period on its
interim final rule for the refrigerator test
procedure. 76 FR 57612 (Sept. 15, 2011).
DOE intends to consider the comments
received in response to this notice
before publishing a decision and order
concerning Samsung’s petition for
waiver from the energy efficiency test
procedure requirements for residential
refrigerators and refrigerator-freezers in
10 CFR part 430, which are applicable
to Samsung’s electric refrigerators and
refrigerator-freezers that incorporate
multiple defrost cycles. Therefore, DOE
has determined that it is appropriate to
grant an extension of the interim waiver
to Samsung for an additional 180 days,
or until March 12, 2012, or until the
determination on the petition for
waiver, whichever occurs first.
Issued in Washington, DC, on September
20, 2011.
Kathleen Hogan,
Deputy Assistant Secretary for Energy
Efficiency, Office of Technology
Development, Energy Efficiency and
Renewable Energy.
[FR Doc. 2011–24611 Filed 9–23–11; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2011–0038; FRL–8889–5]
Primus Solutions, Inc.; Transfer of
Data
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces that
pesticide related information submitted
to EPA’s Office of Pesticide Programs
(OPP) pursuant to the Federal
Insecticide, Fungicide, and Rodenticide
Act (FIFRA) and the Federal Food, Drug,
and Cosmetic Act (FFDCA), including
information that may have been claimed
as Confidential Business Information
(CBI) by the submitter, will be
transferred to Primus Solutions, Inc., in
accordance with 40 CFR 2.307(h)(3) and
2.308(i)(2). Primus Solutions, Inc., has
been awarded multiple contracts to
jlentini on DSK4TPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:37 Sep 23, 2011
Jkt 223001
59395
of certain evaluations to be made under
this contract. These evaluations may be
used in subsequent regulatory decisions
under FIFRA.
Some of this information may be
entitled to confidential treatment. The
information has been submitted to EPA
under sections 3, 4, 6, and 7 of FIFRA
and under sections 408 and 409 of
FFDCA.
In accordance with the requirements
of 40 CFR 2.307(h)(3), the contracts with
Primus Solutions, Inc., prohibits use of
the information for any purpose not
specified in these contracts; prohibits
disclosure of the information to a third
party without prior written approval
from the Agency; and requires that each
official and employee of the contractor
I. General Information
sign an agreement to protect the
A. Does this action apply to me?
information from unauthorized release
and to handle it in accordance with the
This action applies to the public in
FIFRA Information Security Manual. In
general. As such, the Agency has not
addition, Primus Solutions, Inc., is
attempted to describe all the specific
required to submit for EPA approval a
entities that may be affected by this
security plan under which any CBI will
action. If you have any questions
regarding the applicability of this action be secured and protected against
to a particular entity, consult the person unauthorized release or compromise. No
information will be provided to Primus
listed under FOR FURTHER INFORMATION
Solutions, Inc., until the requirements
CONTACT.
in this document have been fully
B. How can I get copies of this document
satisfied. Records of information
and other related information?
provided to Primus Solutions, Inc., will
EPA has established a docket for this
be maintained by EPA Project Officers
action under docket identification (ID)
for these contracts. All information
number EPA–HQ–OPP–2011–0038.
supplied to Primus Solutions, Inc., by
Publicly available docket materials are
EPA for use in connection with these
available either in the electronic docket
contracts will be returned to EPA when
at https://www.regulations.gov, or, if only Primus Solutions, Inc., has completed
available in hard copy, at the Office of
its work.
Pesticide Programs (OPP) Regulatory
List of Subjects
Public Docket in Rm. S–4400, One
Environmental protection, Business
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA. The hours of and industry, Government contracts,
Government property, Security
operation of this Docket Facility are
measures.
from 8:30 a.m. to 4 p.m., Monday
through Friday, excluding legal
Dated: September 14, 2011.
holidays. The Docket Facility telephone Oscar Morales,
number is (703) 305–5805.
Director, Information Technology and
perform work for OPP, and access to
this information will enable Primus
Solutions, Inc., to fulfill the obligations
of the contract.
DATES: Primus Solutions, Inc., will be
given access to this information on or
before September 26, 2011.
FOR FURTHER INFORMATION CONTACT:
Mario Steadman, Information
Technology and Resources Management
Division (7502P), Office of Pesticide
Programs, Environmental Protection
Agency, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460–0001; telephone
number: (703) 305–8338,
steadman.mario@epa.gov.
SUPPLEMENTARY INFORMATION:
II. Contractor Requirements
Under the contract number EP–W–
11–024, the contractor will provide
assistance to Antimicrobials Division
reviewers to process applications for
new registrations, new uses,
amendments, and notifications within
the time frame set forth by the Agency
in order to meet the mandated timelines
required under the Food Quality
Protection Act and the Pesticide
Registration Improvement Renewal Act
of 2007. This contract involves no
subcontractors.
OPP has determined that the contracts
described in this document involve
work that is being conducted in
connection with FIFRA, in that
pesticide chemicals will be the subject
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Resources Management Division, Office of
Pesticide Programs.
[FR Doc. 2011–24285 Filed 9–23–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9471–3]
Notice of Webcast Meeting of the
Environmental Financial Advisory
Board (EFAB)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The United States
Environmental Protection Agency’s
SUMMARY:
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 76, Number 186 (Monday, September 26, 2011)]
[Notices]
[Pages 59394-59395]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24611]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
[Case No. RF-018]
Energy Conservation Program for Consumer Products: Publication of
the Extension of Interim Waiver Granted to Samsung Electronics America,
Inc. From the Department of Energy Residential Refrigerator and
Refrigerator-Freezer Test Procedure
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Notice of extension of interim waiver.
-----------------------------------------------------------------------
SUMMARY: On March 25, 2011, the Department of Energy (DOE) published in
the Federal Register a petition for waiver and notice granting an
application for interim waiver to Samsung Electronics America, Inc.
(Samsung) from energy efficiency test procedure requirements that are
applicable to residential refrigerators and refrigerator-freezers. In
today's action, DOE is extending the interim waiver for 180 days.
FOR FURTHER INFORMATION CONTACT:
Dr. Michael G. Raymond, U.S. Department of Energy, Building
Technologies Program, Mailstop EE-2J, 1000 Independence Avenue, SW.,
Washington, DC 20585-0121. Telephone: (202) 586-9611. E-mail:
Michael.Raymond@ee.doe.gov.
Ms. Elizabeth Kohl, U.S. Department of Energy, Office of the General
Counsel, Mail Stop GC-71, 1000 Independence Avenue, SW., Washington, DC
20585-0103, (202) 586-7796; E-mail: Elizabeth.Kohl@hq.doe.gov.
SUPPLEMENTARY INFORMATION: On March 18, 2011, DOE granted to Samsung an
interim waiver from the energy efficiency test procedure requirements
in 10 CFR part 430 that are applicable to Samsung's electric
refrigerators and refrigerator-freezers that incorporate multiple
defrost cycles, and requested comments on Samsung's petition. 76 FR
16760 (March 25, 2011). Pursuant to 10 CFR 430.27(h), an interim waiver
will terminate 180 days after issuance or upon the determination on the
petition for waiver, whichever occurs first. An
[[Page 59395]]
interim waiver may be extended by DOE for 180 days. Notice of such
extension and/or any modification of the terms or duration of the
interim waiver shall be published in the Federal Register and shall be
based on relevant information contained in the record and any comments
received subsequent to issuance of the interim waiver.
On August 17, 2011, Samsung requested an extension of its interim
waiver. DOE recently published a notice reopening the comment period on
its interim final rule for the refrigerator test procedure. 76 FR 57612
(Sept. 15, 2011). DOE intends to consider the comments received in
response to this notice before publishing a decision and order
concerning Samsung's petition for waiver from the energy efficiency
test procedure requirements for residential refrigerators and
refrigerator-freezers in 10 CFR part 430, which are applicable to
Samsung's electric refrigerators and refrigerator-freezers that
incorporate multiple defrost cycles. Therefore, DOE has determined that
it is appropriate to grant an extension of the interim waiver to
Samsung for an additional 180 days, or until March 12, 2012, or until
the determination on the petition for waiver, whichever occurs first.
Issued in Washington, DC, on September 20, 2011.
Kathleen Hogan,
Deputy Assistant Secretary for Energy Efficiency, Office of Technology
Development, Energy Efficiency and Renewable Energy.
[FR Doc. 2011-24611 Filed 9-23-11; 8:45 am]
BILLING CODE 6450-01-P