Notice of Proposed Restricted Service List or Section 106 Consultation; Boott Hydropower Inc.; Eldred L. Field Hydroelectric Facility Trust; Lowell Hydroelectric Project; Massachusetts, 58262-58263 [2011-24087]
Download as PDF
58262
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Notices
elibrary.asp. Enter the docket number
(P–1258–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24018 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14257–000]
Emcdonald on DSK5VPTVN1PROD with NOTICES
American River Power I, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 22, 2011, American River
Power I, LLC (American River) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), to study the feasibility
of the proposed Ellis, Ohio—Water
Power Project No. 14257 to be located
at the existing Ellis Ohio Lock Dam No.
11 on the Muskingum River, near the
township of Ellis, in Muskingum
County, Ohio. The Ellis Ohio Lock Dam
No. 11 is owned by the State of Ohio.
There are no federal lands associated
with the project.
The proposed project would consist
of: (1) The existing Ellis Dam and
reservoir; (2) a new 30-foot by 40-foot
powerhouse housing controls,
switchgear, and related equipment; (3)
new intake structure and trash rack
containing four 140-foot-long bays and
eight vertical slide gates; (4) a new 40foot-long by 100-foot-wide power canal
with two 50-foot-wide by 40-foot-long
bays; (5) four new 625-kilowatt turbinegenerator units with a combined
capacity of 2.5 megawatts; (6) a new
200-foot-long by 100 to 150-foot wide
tailrace; (7) a new 150-foot-long, 12.5 to
34.5-kilovolt transmission line; and (8)
appurtenant facilities. The project
would have an estimated annual
generation of 9,700 megawatt-hours.
Applicant Contact: Mr. John P. Henry,
726 Eldridge Avenue, Collingswood, NJ
08107–1708, (856) 240–0707.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
VerDate Mar<15>2010
17:45 Sep 19, 2011
Jkt 223001
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14257–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24021 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 2790–055]
Notice of Proposed Restricted Service
List or Section 106 Consultation; Boott
Hydropower Inc.; Eldred L. Field
Hydroelectric Facility Trust; Lowell
Hydroelectric Project; Massachusetts
Rule 2010(d) of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
section 385.2010(d), provides that, to
eliminate unnecessary expense or
improve administrative efficiency, the
Secretary may establish a restricted
service list for a particular phase or
issue in a proceeding. The restricted
service list should contain the names of
persons on the service list who, in the
judgment of the decisional authority
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
establishing the list, are active
participants with respect to the phase or
issue in the proceeding for which the
list is established.
The Commission staff is consulting
with the Massachusetts State Historic
Preservation Officer (SHPO), the
National Park Service (NPS), and the
Advisory Council on Historic
Preservation (Advisory Council)
pursuant to the Advisory Council’s
regulations, 36 CFR part 800,
implementing section 106 of the
National Historic Preservation Act, as
amended, (16 U.S.C. section 470f), to
complete the section 106 process for the
proposed installation of pneumatic crest
gates at the Lowell Hydroelectric
Project.
Boott Hydropower, Inc. and Eldred L.
Field Hydroelectric Facility Trust, as colicensees for Project No. 2790, are
invited to participate in consultation to
complete the section 106 process for the
proposed license amendment. For
purposes of completing the section 106
process, we propose to restrict the
service list for Project No. 2790–055 as
follows:
John Fowler, Executive Director,
Advisory Council on Historic
Preservation, The Old Post Office
Building, 1100 Pennsylvania Ave.,
NW., Suite 803, Washington, DC
20004.
John Eddins, Advisory Council on
Historic, Preservation, The Old Post
Office Building, 1100 Pennsylvania
Ave., NW., Suite 803, Washington, DC
20004.
Brona Simon, SHPO, Executive Director,
Massachusetts Historical Commission,
Commonwealth of Massachusetts, 220
Morrissey Boulevard, Boston, MA
02125.
Kevin M. Webb, Environmental Affairs
Coordinator, Boott Hydropower, Inc.,
Eldred L. Field Hydroelectric Facility
Trust, One Tech Drive, Suite 220,
Andover, MA 01810.
Michael Creasey, Superintendent.
National Park Service, Lowell
National Historic Park, 67 Kirk Street,
Lowell, MA 01852–1029.
Any person on the official service list
for the above-captioned proceeding may
request inclusion on the restricted
service list, or may request that a
restricted service list not be established,
by filing a motion to that effect within
15 days of this notice date. An original
plus seven copies of any such motion
must be filed with the Secretary of the
Commission (888 First Street, NE.,
Washington, DC 20426) and must be
served on each person whose name
appears on the official service list. A
motion may also be filed electronically
E:\FR\FM\20SEN1.SGM
20SEN1
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Notices
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘efiling’’ link. The Commission strongly
encourages electronic filings. If no such
motions are filed, the restricted service
list will be effective at the end of the 15
day period. Otherwise, a further notice
will be issued ruling on the motion.
Dated: September 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24087 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR11–21–000]
Emcdonald on DSK5VPTVN1PROD with NOTICES
Kenai Pipe Line Company; Tesoro
Alaska Company; Tesoro Logistics
Operations, LLC; Notice of Request for
Jurisdictional Determination or
Temporary Waiver of Tariff Filing and
Reporting Requirements
Take notice that on September 1,
2011, Kenai Pipe Line Company (KPL),
Tesoro Alaska Company (Tesoro
Alaska), and Tesoro Logistics, LLC
(TLO) (collectively, Tesoro) filed a
Request for Jurisdictional
Determination, or, in the Alternative,
Temporary Waiver of Tariff Filing and
Reporting Requirements.
Tesoro requests that the Commission
determine that two crude oil pipelines,
as well as several crude oil and refined
petroleum products pipeline spurs that
are part of Tesoro Alaska’s internal
refinery operations, are not subject to
the Commission’s jurisdiction under the
Interstate Commerce Act (ICA).
Tesoro also requests that the
Commission determine that a dock and
tank storage that Tesoro also uses as part
of its internal refinery operation are not
subject to the Commission’s
jurisdiction.
Any person desiring to intervene or to
protest in the above proceeding must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
VerDate Mar<15>2010
17:45 Sep 19, 2011
Jkt 223001
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
e-mail FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. Eastern time on
Friday, September 30, 2011.
Dated: September 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24091 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–541–000]
Notice of Request Under Blanket
Authorization; Columbia Gas
Transmission, LLC
Take notice that on July 26, 2011,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, TX 77056 filed a prior
notice request in accordance with
sections 157.205, 157.213(b), and
157.216(b) of the Federal Energy
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
58263
Regulatory Commission’s (Commission)
Regulations under the Natural Gas Act
and Columbia’s authorization in Docket
CP83–76–000, to abandon two
underperforming natural gas storage
wells and their associated well lines and
appurtenances situated in Hocking
County, Ohio, and Kanawha County,
West Virginia, convert one well located
in Vinton County, Ohio, from active
injection/withdrawal status to
observation status, and abandon in
place the well line previously connected
to the Vinton County, Ohio well being
converted to observation status, all as
more fully set forth in the application,
which is open to the public for
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to
Fredric J. George, Senior Counsel,
Columbia Gas Transmission
Corporation, P.O. Box 1273, Charleston,
West Virginia 25325–1273, or telephone
(304) 357–2359, or by fax (304) 357–
3206.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 76, Number 182 (Tuesday, September 20, 2011)]
[Notices]
[Pages 58262-58263]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24087]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 2790-055]
Notice of Proposed Restricted Service List or Section 106
Consultation; Boott Hydropower Inc.; Eldred L. Field Hydroelectric
Facility Trust; Lowell Hydroelectric Project; Massachusetts
Rule 2010(d) of the Federal Energy Regulatory Commission's
(Commission) Rules of Practice and Procedure, 18 CFR section
385.2010(d), provides that, to eliminate unnecessary expense or improve
administrative efficiency, the Secretary may establish a restricted
service list for a particular phase or issue in a proceeding. The
restricted service list should contain the names of persons on the
service list who, in the judgment of the decisional authority
establishing the list, are active participants with respect to the
phase or issue in the proceeding for which the list is established.
The Commission staff is consulting with the Massachusetts State
Historic Preservation Officer (SHPO), the National Park Service (NPS),
and the Advisory Council on Historic Preservation (Advisory Council)
pursuant to the Advisory Council's regulations, 36 CFR part 800,
implementing section 106 of the National Historic Preservation Act, as
amended, (16 U.S.C. section 470f), to complete the section 106 process
for the proposed installation of pneumatic crest gates at the Lowell
Hydroelectric Project.
Boott Hydropower, Inc. and Eldred L. Field Hydroelectric Facility
Trust, as co-licensees for Project No. 2790, are invited to participate
in consultation to complete the section 106 process for the proposed
license amendment. For purposes of completing the section 106 process,
we propose to restrict the service list for Project No. 2790-055 as
follows:
John Fowler, Executive Director, Advisory Council on Historic
Preservation, The Old Post Office Building, 1100 Pennsylvania Ave.,
NW., Suite 803, Washington, DC 20004.
John Eddins, Advisory Council on Historic, Preservation, The Old Post
Office Building, 1100 Pennsylvania Ave., NW., Suite 803, Washington, DC
20004.
Brona Simon, SHPO, Executive Director, Massachusetts Historical
Commission, Commonwealth of Massachusetts, 220 Morrissey Boulevard,
Boston, MA 02125.
Kevin M. Webb, Environmental Affairs Coordinator, Boott Hydropower,
Inc., Eldred L. Field Hydroelectric Facility Trust, One Tech Drive,
Suite 220, Andover, MA 01810.
Michael Creasey, Superintendent. National Park Service, Lowell National
Historic Park, 67 Kirk Street, Lowell, MA 01852-1029.
Any person on the official service list for the above-captioned
proceeding may request inclusion on the restricted service list, or may
request that a restricted service list not be established, by filing a
motion to that effect within 15 days of this notice date. An original
plus seven copies of any such motion must be filed with the Secretary
of the Commission (888 First Street, NE., Washington, DC 20426) and
must be served on each person whose name appears on the official
service list. A motion may also be filed electronically
[[Page 58263]]
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site (https://www.ferc.gov)
under the ``e-filing'' link. The Commission strongly encourages
electronic filings. If no such motions are filed, the restricted
service list will be effective at the end of the 15 day period.
Otherwise, a further notice will be issued ruling on the motion.
Dated: September 14, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-24087 Filed 9-19-11; 8:45 am]
BILLING CODE 6717-01-P