Notice of Application Tendered for Filing With the Commission; Copper Valley Electric Association, Inc., 58256-58257 [2011-24020]
Download as PDF
Emcdonald on DSK5VPTVN1PROD with NOTICES
58256
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Notices
TransCanada Corporation, 717 Texas
Street, Houston, Texas 77002–2761,
filed with the Federal Energy Regulatory
Commission (Commission) an
application in Docket No. CP11–543–
000 under Section 7(b) of the Natural
Gas Act (NGA) for permission and
approval to abandon by sale to TC
Offshore LLC (TCO) certain onshore
facilities located in Louisiana and
Texas, and certain offshore supply
facilities located in State and Federal
waters offshore Louisiana and Texas in
the Gulf of Mexico. Also take notice that
on September 1, 2011, TCO, a whollyowned subsidiary of ANR, 717 Texas
Street, Suite 2400, Houston, Texas
77002–2761, filed with the Commission
an abbreviated application in Docket
No. CP11–544–000 under Section 7(c) of
the NGA requesting authorization for
TCO to acquire, own and operate those
natural gas pipeline facilities proposed
by ANR to be abandoned by sale, as well
as blanket certificates issued to TCO
under Subpart F of Part 157 and Subpart
G of Part 284 of the Commission’s
regulations, all as more fully set forth in
the applications which are on file with
the Commission and open to public
inspection.
Specifically, ANR proposes in Docket
No. CP11–543–000 to abandon by sale
to TCO various facilities consisting of
approximately 535 miles of pipeline,
seven offshore platforms, measurement,
compression, separation and
dehydration facilities, and
appurtenances, as well as its interests in
several partially owned offshore
facilities. TCO seeks in Docket No.
CP11–544–000 a certificate of public
convenience and necessity pursuant to
NGA Section 7 authorizing TCO to
acquire, own and operate those natural
gas pipeline facilities proposed for
abandonment by ANR in Docket No.
CP11–543–000; a blanket construction
certificate pursuant to Subpart F of Part
157 of the Commission’s regulations,
authorizing certain routine construction,
operation and abandonment activities;
and a blanket transportation certificate
under Subpart G of Part 284 of the
Commission’s regulations authorizing
TCO to provide open access
transportation service on behalf of
others pursuant to the services, tariff
provisions and initial recourse rates
proposed and detailed in the
application.
Any questions regarding the ANR
application in Docket No. CP11–543–
000 should be directed to Rene Staeb,
Manager, Project Determinations &
Regulatory Administration, ANR
Pipeline Company, 717 Texas Street,
Houston, Texas 77002–2761, phone
VerDate Mar<15>2010
17:45 Sep 19, 2011
Jkt 223001
(832) 320–5215 or FAX (832) 320–6215
or Rene_Staeb@transcanada.com.
Any questions regarding the TCO
application in Docket No. CP11–544–
000 may be directed to Richard Parke,
Manager, Certificates, TC Offshore LLC,
717 Texas Street, Suite 2400, Houston,
Texas, 77002–2761, phone (832) 320–
5516, e-mail:
Richard_parke@transcanada.com.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
an original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE,, Washington, DC 20426. This filing
is accessible on-line at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email notification when a document is
added to a subscribed docket(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: October 4, 2011.
Dated: September 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24022 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13124–003]
Notice of Application Tendered for
Filing With the Commission; Copper
Valley Electric Association, Inc.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: P–13124–003.
c. Date filed: August 30, 2011.
d. Applicant: Copper Valley Electric
Association, Inc..
e. Name of Project: Allison Creek
Hydroelectric Project.
f. Location: On Allison Creek, near the
Town of Valdez, Alaska.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)—825(r) .
h. Applicant Contact: Robert A.
Wilkinson, CEO, Copper Valley Electric
Association, Inc., P.O. Box 45, Mile 187
Glenn Highway Glennallen, AK 99588,
(907) 822–3211.
i. FERC Contact: Kim A. Nguyen,
kim.nguyen@ferc.gov, (202) 502–6105.
j. Cooperating agencies: Federal,
State, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item k below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Deadline for cooperating agency
status: October 31, 2011.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
E:\FR\FM\20SEN1.SGM
20SEN1
Emcdonald on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Notices
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
l. The application is not ready for
environmental analysis (EA) at this
time.
m. The Allison Creek Project consists
of: (1) A 16-foot-high, 95-foot-wide
concrete gravity diversion structure
spanning Allison Creek with a 50-footwide spillway section; (2) a screen
intake; (3) a 42-inch-diameter, 500-footlong buried and 7,200-foot-long surface
steel penstock; (4) a 65 foot x 65 foot
powerhouse with one 6.5-megawatt
turbine/generating unit; (5) a permanent
550-foot-long access road to the
powerhouse; (6) a 3.8-mile-long, 34.5kilovolt transmission line connecting to
the Copper Valley switching station
near the Petro Star facility along
Dayville Road; and (7) appurtenant
facilities. The average annual generation
is estimated to be 23.3 gigawatt-hours.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are initiating
consultation with the Alaska State
Historic Preservation Officer (SHPO), as
required by 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR, at 800.4.
VerDate Mar<15>2010
17:45 Sep 19, 2011
Jkt 223001
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Tendering Notice: September
2011.
Issue Notice of Acceptance and
Soliciting Comments, Terms and
Conditions, Recommendations, and
Prescriptions: October 2011.
Issue Draft EA: August 2012.
Comments on Draft EA: September
2012.
Issue Final EA: December 2012.
Dated: September 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–24020 Filed 9–19–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–117–000.
Applicants: Central Vermont Public
Service Corporation, Gaz Metro Limited
Partnership, Northern New England
Energy Corporation, Green Mountain
Power Corporation.
Description: Section 203 Application
of Central Vermont Public Service
Corporation and Gaz Metro, et al. for
Authorization for Purchase, Disposition
and Merger of Jurisdictional Facilities.
Filed Date: 09/09/2011.
Accession Number: 20110909–5279.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 8, 2011.
Docket Numbers: EC11–118–000.
Applicants: Amsterdam Generating
Company, LLC, ESI Energy, LLC, Blythe
Energy, LLC, Calhoun Power Company
I, LLC, Doswell Limited Partnership.
Description: Amsterdam Generating
Company, LLC, et al. joint application
for approval under section 203 of the
Federal Power Act, request for
shortened comment period, and request
for expedited treatment.
Filed Date: 09/09/2011.
Accession Number: 20110909–5285.
Comment Date: 5 p.m. Eastern Time
on Friday, September 30, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3576–003;
ER97–3583–007; ER11–3401–004;
ER10–3138–003.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
58257
Applicants: Golden Spread Electric
Cooperative, Inc., GS ELECTRIC
GENERATING COOPERATIVE INC,
Denver City Energy Associates, L.P.,
Golden Spread Panhandle Wind Ranch,
LLC.
Description: Notice of Change in
Status of Golden Spread Electric
Cooperative, Inc. et al.
Filed Date: 09/12/2011.
Accession Number: 20110912–5118.
Comment Date: 5 p.m. Eastern Time
on Monday, October 3, 2011.
Docket Numbers: ER11–4498–000.
Applicants: Smoky Hills Wind Farm,
LLC.
Description: Smoky Hills Wind Farm,
LLC submits tariff filing per 35.1:
Smoky Hills Wind Farm, LLC MBR
Tariff to be effective 10/31/2007.
Filed Date: 09/12/2011.
Accession Number: 20110912–5000.
Comment Date: 5 p.m. Eastern Time
on Monday, October 3, 2011.
Docket Numbers: ER11–4499–000.
Applicants: Smoky Hills Wind Project
II, LLC.
Description: Smoky Hills Wind
Project II, LLC submits tariff filing per
35.1: Smoky Hills Wind Project II, LLC
MBR Tariff to be effective 10/20/2008.
Filed Date: 09/12/2011.
Accession Number: 20110912–5001.
Comment Date: 5 p.m. Eastern Time
on Monday, October 3, 2011.
Docket Numbers: ER11–4500–000.
Applicants: Enel Stillwater, LLC.
Description: Enel Stillwater, LLC
submits tariff filing per 35.1: Enel
Stillwater, LLC MBR Tariff to be
effective 12/5/2008.
Filed Date: 09/12/2011.
Accession Number: 20110912–5002.
Comment Date: 5 p.m. Eastern Time
on Monday, October 3, 2011.
Docket Numbers: ER11–4501–000.
Applicants: Caney River Wind
Project, LLC.
Description: Caney River Wind
Project, LLC submits tariff filing per
35.12: Caney River Wind Project, LLC
MBR Tariff to be effective 10/1/2011.
Filed Date: 09/12/2011.
Accession Number: 20110912–5003.
Comment Date: 5 p.m. Eastern Time
on Monday, October 3, 2011.
Docket Numbers: ER11–4502–000.
Applicants: HEEP Fund Inc.
Description: HEEP Fund Inc submits
notice of cancellation to its FERC
Electric Tariff, Original Volume No 1,
effective 10/30/11.
Filed Date: 09/09/2011.
Accession Number: 20110912–0201.
Comment Date: 5 p.m. Eastern Time
on Friday, September 30, 2011.
Docket Numbers: ER11–4503–000.
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 76, Number 182 (Tuesday, September 20, 2011)]
[Notices]
[Pages 58256-58257]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-24020]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13124-003]
Notice of Application Tendered for Filing With the Commission;
Copper Valley Electric Association, Inc.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major License.
b. Project No.: P-13124-003.
c. Date filed: August 30, 2011.
d. Applicant: Copper Valley Electric Association, Inc..
e. Name of Project: Allison Creek Hydroelectric Project.
f. Location: On Allison Creek, near the Town of Valdez, Alaska.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)--825(r) .
h. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley
Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway
Glennallen, AK 99588, (907) 822-3211.
i. FERC Contact: Kim A. Nguyen, kim.nguyen@ferc.gov, (202) 502-
6105.
j. Cooperating agencies: Federal, State, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item k below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Deadline for cooperating agency status: October 31, 2011.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
[[Page 58257]]
instructions on the Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
(202) 502-8659. Although the Commission strongly encourages electronic
filing, documents may also be paper-filed. To paper-file, mail an
original and seven copies to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
l. The application is not ready for environmental analysis (EA) at
this time.
m. The Allison Creek Project consists of: (1) A 16-foot-high, 95-
foot-wide concrete gravity diversion structure spanning Allison Creek
with a 50-foot-wide spillway section; (2) a screen intake; (3) a 42-
inch-diameter, 500-foot-long buried and 7,200-foot-long surface steel
penstock; (4) a 65 foot x 65 foot powerhouse with one 6.5-megawatt
turbine/generating unit; (5) a permanent 550-foot-long access road to
the powerhouse; (6) a 3.8-mile-long, 34.5-kilovolt transmission line
connecting to the Copper Valley switching station near the Petro Star
facility along Dayville Road; and (7) appurtenant facilities. The
average annual generation is estimated to be 23.3 gigawatt-hours.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
o. With this notice, we are initiating consultation with the Alaska
State Historic Preservation Officer (SHPO), as required by 106,
National Historic Preservation Act, and the regulations of the Advisory
Council on Historic Preservation, 36, CFR, at 800.4.
p. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Tendering Notice: September 2011.
Issue Notice of Acceptance and Soliciting Comments, Terms and
Conditions, Recommendations, and Prescriptions: October 2011.
Issue Draft EA: August 2012.
Comments on Draft EA: September 2012.
Issue Final EA: December 2012.
Dated: September 13, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-24020 Filed 9-19-11; 8:45 am]
BILLING CODE 6717-01-P