Defense Federal Acquisition Regulation Supplement; Material Inspection and Receiving Report (DFARS Case 2009-D023), 58122-58136 [2011-23958]
Download as PDF
58122
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
Dated: August 31, 2011.
W.C. Early,
Acting Regional Administrator, Region III.
Authority: 42 U.S.C. 7401 et seq.
§ 52.420
*
Subpart I—Delaware
40 CFR part 52 is amended as follows:
PART 52—[AMENDED]
1. The authority citation for part 52
continues to read as follows:
■
Identification of plan.
*
*
(c) * * *
*
*
2. In § 52.420, the table in paragraph
(c) is amended by revising the entry for
Regulation 1125, Section 3.0 to read as
follows:
■
EPA-APPROVED REGULATIONS IN THE DELAWARE SIP
State regulation
(7 DNREC 1100)
State effective
date
Title/subject
*
*
*
1125
*
Section 3.0 ..............
*
Prevention of Significant Deterioration of Air
Quality.
*
*
*
*
*
DEPARTMENT OF DEFENSE
Defense Acquisition Regulations
System
48 CFR Chapter 2
Defense Federal Acquisition
Regulation Supplement; Material
Inspection and Receiving Report
(DFARS Case 2009–D023)
Defense Acquisition
Regulations System, Department of
Defense (DoD).
ACTION: Final rule.
AGENCY:
DoD is issuing a final rule
amending the Defense Federal
Acquisition Regulation Supplement
(DFARS), Appendix F, Material
Inspection and Receiving Report, to
incorporate new procedures for using
the electronic Wide Area WorkFlow
(WAWF) Receiving Report.
DATES: Effective date: September 20,
2011.
SUMMARY:
sroberts on DSK5SPTVN1PROD with RULES
*
Mr.
Julian Thrash, telephone 703–602–0310.
SUPPLEMENTARY INFORMATION:
FOR FURTHER INFORMATION CONTACT:
Jkt 223001
*
*
*
9/20/11 [Insert page number where the
document begins].
*
*
DoD published a proposed rule in the
Federal Register (75 FR 56961) on
September 17, 2010, to amend DFARS
Appendix F, Material Inspection and
Receiving Report, to provide new
coverage on the use, preparation, and
distribution of the electronic WAWF
receiving report, which is the primary
method for documenting acceptance of
supplies and services and for electronic
invoicing. The rule also addressed
WAWF capability to provide the
following:
• Item Unique Identification (IUID).
When the clause at DFARS 252.211–
7003, Item Identification and Valuation,
is used in the contract and requires
reporting of IUID data, WAWF captures
the IUID data and forwards the data to
the IUID registry after acceptance.
WAWF may be used to report Unique
Item Identifiers (UIIs) at the line item
level and also UIIs embedded at the line
item level.
• Radio Frequency Identification
(RFID). When the clause at DFARS
252.211–7006, Radio Frequency
Identification, is used in the contract,
WAWF will capture the RFID
information and forward the data to the
receiving location.
Using WAWF is the only way a
contractor can comply with the clause
to furnish RFID data via an Advance
Shipping Notice. Insertion of the new
PO 00000
Frm 00034
Fmt 4700
*
*
Modified to include NOX as precursor
to ozone. Previous SIP-approved revisions to Section 3.1 for nitrogen dioxide increments and Section 3.9A
(now designated as Section 3.10.1)
for air quality models remain part of
the SIP.
*
I. Background
BILLING CODE 6560–50–P
18:12 Sep 19, 2011
Additional explanation
REQUIREMENTS FOR PRECONSTRUCTION REVIEW
*
[FR Doc. 2011–23984 Filed 9–19–11; 8:45 am]
VerDate Mar<15>2010
*
*
4/11/10
*
*
EPA approval date
Sfmt 4700
*
*
WAWF coverage into Appendix F
necessitates relocating and renumbering
existing coverage for use, preparation,
and distribution of the DD Form 250
Material Inspection and Receiving
Report, and the DD Form 250–1 Tanker/
Barge Material Inspection and Receiving
Report.
II. Discussion and Analysis
In response to the proposed rule, DoD
received comments from five
respondents. A discussion of the
comments follows.
A. Revise F–103, WAWF RR and DD
Form 250
Comment: Two respondents suggested
changing the text at F–103(b)(2) for the
transfer of Government property using
the property transfer function. Another
respondent recommended adding where
training for the preparation of document
types is available.
Response: These recommendations
are incorporated into the final rule.
B. Limitation on the Quantity of
Embedded Items in WAWF
Comment: A respondent asked if there
was a limit on the quantity of embedded
items at the line item level that may be
reported in WAWF.
Response: A quantity limit of 100
embedded items currently exists in the
software capability, however, this limit
E:\FR\FM\20SER1.SGM
20SER1
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
is subject to change in future versions of
WAWF.
C. F–103(e)(2), Radio Frequency
Identification (RFID)
Comment: A respondent suggested
adding clarification on the use of RFID
information.
Response: As suggested, paragraph
F–103(e)(2) is revised to clarify that the
RFID information can be added either at
submission or via the ‘‘WAWF Pack
Later’’ functionality.
D. F–104, Application
Comment: A respondent asked about
the meaning of ‘‘consigned to’’ at F–
104(a)(4) and for clarification regarding
use of a continuation sheet. The
respondent stated that they have no
control over how the continuation sheet
appears or prints from WAWF.
Response: The phrase ‘‘consigned to’’
is the one to whom a line item is given,
transferred, or delivered for control. In
regard to use of a continuation sheet, the
format printed out from WAWF will
suffice as long as the required contractor
information is entered.
sroberts on DSK5SPTVN1PROD with RULES
E. F–301, Preparation Instructions—
General Comments
Comment: Two respondents
suggested, at paragraph F–301(a)(1),
replacing ‘‘contractor’’ with ‘‘vendor’’ to
be consistent with the label used on the
training Web site provided in the
proposed rule. A respondent suggested:
(1) Revising F–301(a)(2) to reflect the
creation of an extension to the prime
Commercial and Government Entity
(CAGE); (2) replacing, at paragraph F–
301(a)(4), ‘‘official DoD sites’’ with
‘‘DoD definitive sources’’; (3). adding
text at paragraph F–301(b)(1)(iii) to
clarify that comments in the
miscellaneous information tab will
appear in the comments section of the
printed WAWF receiving report; (4).
changing, at paragraph F–301(b)(1)(iv),
‘‘DoD contract number’’ to ‘‘DoD
contract number and delivery order
number’’; and, (5) updating paragraph
F–301(b)(3) to correctly refer to the data
field as ‘‘Estimated’’ and reflect that
data entry is a drop-down box.
Response: The final rule is revised to
incorporate these recommendations.
F. Inclusion of Shipping Documents
Comment: A respondent requested at
paragraph F–301(b)(2)(i), SHIPMENT
NO., that contractors must always
provide packaging documentation in
their shipment containers. If contractors
choose to provide their own packaging
documentation they must ensure their
documentation includes their shipment
number data. The respondent
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
recommended the addition of a
statement that any document utilized as
a packing list must include the
shipment number information.
Additionally, the respondent suggested
revising the text with an example to
clarify that the shipment number format
requires first three data positions to be
alpha, fourth position alpha-numeric
and last three positions are numeric e.g.,
DFAR001 or DAR0001.
Response: The recommendations are
incorporated into the final rule.
Comment: A respondent requested at
paragraph F–301(b)(3), Date Shipped,
that a ‘‘MIRR clause does not identify
electronic data submission timeline.’’
The respondent recommended the
DFARS MIRR language include the
statement that the contractor will
submit the completed MIRR via WAWF
within one business day of material
shipment. The respondent stated that
material shipments missing shipment
numbered data causes manual research
in order to process the receipt
acceptance.
Response: The MIRR is completed at
the time of delivery of goods or services
and, for both WAWF and paper DD form
250s, copies of the MIRR accompany the
shipment. Paragraph F–301(b)(3) is
revised to add a reference to ‘‘see F–
303).’’
Comment: A respondent requested at
paragraph F–305, Invoice instructions,
adding a statement that contractors
should ensure the packaging
documentation includes a Government
signed receiving report when the
contract requires origin inspection and
acceptance. The respondent further
stated that contractors must include the
signed document indicating material
receipt acceptance has occurred in the
container with the exception of material
shipments that are approved for
Alternate Release Procedures.
Response: The final rule is revised to
incorporate the recommendations.
G. F–301(b)(4)—Bill of Lading
Information
Comment: A respondent stated, at
paragraph F–301(b)(4)(i), that bills of
lading are obtained when an item is
being scheduled to ship, and thus may
not be available until after the item has
been source inspected/accepted. The
respondent recommended clearly
stating that the field is not required
prior to source inspection and
acceptance, nor, in their opinion,
should a receiving report correction be
issued only for adding a bill of lading
after it has been obtained. Further, the
respondent suggested revising F–
301(b)(4), to enter the commercial or
PO 00000
Frm 00035
Fmt 4700
Sfmt 4700
58123
Government bill of lading number after
‘‘BL.’’
Response: Currently, the ‘‘Bill of
Lading Number’’ field is not a
mandatory field in WAWF. Additional
changes to the Bill of Lading
functionality may be made later on.
H. Line Haul Information Changes
Comment: One respondent suggested
at paragraph F–301(b)(5), Line Haul
Mode, that this is an item that may not
be stated accurately until after signature,
when the item is scheduled for
shipment, and recommended that this
field not be required prior to source
inspection/acceptance.
Response: There is flexibility in
WAWF regarding this entry as ‘‘Line
Haul Mode’’ field is not a mandatory
field.
I. Allow for WAWF Acceptance at
‘‘Other’’ Using Code ‘‘D’’
Comment: Two respondents suggested
that paragraph F–301(b)(6), Inspection
and Acceptance Point, be changed from
‘‘WAWF allows acceptance at Other’’ to
‘‘WAWF allows acceptance at Other
(O).’’ Two respondents suggested
adding, that for purposes of conforming
to contract, ‘‘0’’ is equivalent to ‘‘D’’.
Response: The final rule is revised to
incorporate the recommendations.
J. Marked for Codes
Comment: A respondent suggested at
paragraphs F–301(b)(7), Prime
Contractor/Code, F–301(b)(9), Shipped
From/Code, and F–301(b)(11), Payment
Will Be Made By/Code, that these codes
must match the contract, however, the
street address is not required to match
the contract. The respondents further
opined that WAWF does not require the
entry of an address code in either
WAWF 4.2 or 5.0, and concluded that
the requirement of an address should be
clarified.
Response: No clarification is needed
in the rule. Contractors can fulfill
contracts with shipments from their
location or from subsidiaries or
subcontractors. Therefore, the shipped
from code doesn’t necessarily need to
match the contract. Further, the
receiving report is used for services as
well as supplies where there will be no
ship-from code.
Comment: One respondent requested
clarification at paragraph F–301(b)(13),
Marked For/Code, concerning the
‘‘Marked For Address.’’ Previously,
textual marking information associated
with the ‘‘Marked For DoDAAC’’ was
placed in the address lines of the
‘‘Marked For DoDAAC.’’ Now that DoD
is moving away from paper documents,
the respondent wanted confirmation to
E:\FR\FM\20SER1.SGM
20SER1
58124
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
use the data fields as labeled using the
code area for the ‘‘Marked For
DoDAAC’’ and address only, and the
‘‘Mark For Rep’’ and ‘‘Mark For
Secondary’’ fields used for the text
information.
Response: The respondent is correct
concerning use of these fields. No
change to the rule is required.
K. Marked for Codes
Comment: A respondent requested
revisions at paragraph F–301(b)(13) to
reflect that a ‘‘Marked For Code’’ cannot
be a CAGE code, only a DoDAAC or
Military Assistance Program Address
Codes.
Response: No revision is required in
response to this comment since a CAGE
code can be entered in the ‘‘Mark For
Code’’ field.
L. National Stock Number Entry
Requirements
Comment: A respondent
recommended at paragraph F–
301(b)(15)(1)(A) clarifying that in the
‘‘Type’’ drop-down field, that the user is
to select the corresponding type for the
data entered, and that if no National
Stock Number or other valid ‘‘Type’’ is
available, the word ‘‘None’’ may be
entered for the Stock/Part Number, with
a corresponding ‘‘Type’’ of any value
other than the National Stock Number
selected from the drop-down box.
Another respondent stated that if the
contract contains NSNs as well as other
identification (e.g., part numbers), a
contractor should place the NSN
information in the Stock Part Number
field and the remaining numbers in the
line item description field.
Response: The paragraph is revised
accordingly to incorporate the first
recommendation. In regards to the
second comment concerning NSNs as
well as other identifying information,
the respondent is correct in how this
process works. The text is revised to
ensure this meaning is understood.
sroberts on DSK5SPTVN1PROD with RULES
M. The ‘‘Description’’ Field Length and
Use
Comment: A respondent asked
whether or not at paragraph F–
301(b)(15)(ii), if exceeding 20 characters
in the description field is a cause for the
rejection of a receiving report. Further,
the respondent requested clarification
on whether or not the description refers
to what is defined in the payment
system as a ‘‘service’’ line item as
opposed to a ‘‘supply’’ line item. A
WAWF RR for a repair is for acceptance
of the repair and not of the item
repaired. However, repair line items are
frequently defined as ‘‘supply’’ line
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
items and therefore the ship-to location
is the actual ship-to of the repaired item.
Response: Exceeding 20 characters in
the description is not a cause for
rejection of a receiving report. In
response to the second comment, the
respondent is correct that the
description refers to the designation in
the payment system as a ‘‘service’’ line
item as opposed to a ‘‘supply’’ line item.
N. GFP Drop-Down Box
Comment: A respondent suggested
that clarification at paragraph F–
301(b)(15)(iv)(E) is required for how the
text relates to the GFE drop-down box,
and whether or not the drop-down box
is insufficient for this situation. The
correct use of GFE drop-down box needs
to be fully explained. If it is not the
same as the entry of ‘‘GFP’’ in the
description text, the differences must be
clarified.
Response: The drop-down GFE box is
not related to this section. It is obsolete
and no longer used and will be deleted
in a future version of WAWF. The GFP
drop-down box is sufficient for use of
GFP.
O. F–301—General Comments
Regarding Unit Price
Comment: Two respondents stated
that at paragraph F–301(b)(18), the
proposed text is identical to that used in
the current Appendix F for unit price
(see F–301, block 19, on current
Appendix F). They further stated that
this document will never be used as an
invoice; thus, in their opinion, there
should not be a requirement to fill in a
unit price, except in the cases listed.
Further, one respondent recommended
at paragraph F–301(b)(18)(i) the
addition of the text to clarify the
handling of unit prices and property
transfer. Another respondent had a
concern with unit prices that were as
little as twenty cents and not being
accepted by the Government agency.
This respondent also noted that an
estimated price can be entered in the
description field, but the Government
contracting office expects the price
entered in the price field, even though
WAWF does not accept the entry the
way the agency had requested. The
respondent went on to state that the
DFARS does not address the electronic
aspect of WAWF and billing.
Response: The unit price is required.
In regard to the intent of the paragraph
on the WAWF initiated property
transfer, the purpose is to alert the
contractor that a property transfer will
be generated as a result of the
completion of the WAWF RR. In regard
to the unit price, it is required when the
clause at DFARS 252.211–7003, Item
PO 00000
Frm 00036
Fmt 4700
Sfmt 4700
Identification and Valuation, is used;
otherwise the use of the field is optional
and at the discretion of the vendor.
When used for item unique
identification, the unit price does not
necessarily reflect the billing price on
the contract. The DFARS addresses
electronic billing at 252.232.7003,
Electronic Submission of Payment
Requests and Receiving Reports. No
change in the rule is required in
response to these comments.
P. F–301—General Comments Regarding
Contract Quality Assurance
Comment: One respondent suggested
at paragraph F–301(b)(20)(ii), that the
term ‘‘execute’’ is misleading and will
cause confusion. The respondent also
stated that removing the quotation
marks will ensure a clear direction. The
respondent further suggested at
paragraphs F–301(b)(20)(iv)(A)(3) and
(v) the steps described should match the
actual step taken in WAWF to
electronically sign the document and
recommended the text be revised.
Response: The quotation marks used
for the term ‘‘execute’’ are removed. In
regard to the electronic signatures, the
text has been revised accordingly to
match the actual steps taken in WAWF.
Q. Comment Regarding F–301(b)(21)
Comment: One respondent suggested
paragraph F–301(b)(21) should be
referenced as the COMMENTS block
and/or MISC INFO tab.
Response: The title is revised to
incorporate ‘‘MISC. INFO’’ as suggested.
R. Printed Documents
Comment: One respondent
recommended at paragraph F–306(b),
that the text be revised to clarify that if
a signed copy is required by the
contractor, the contractor will print the
WAWF RR only after a signature is
applied by the Government Inspector or
Acceptor in WAWF.
Response: This text is revised
accordingly to incorporate the
suggestion.
S. Part 4—General Comments
Comment: One respondent stated that
in Part 4 there are multiple references to
section F–301 and recommended, where
appropriate, the references be updated
to the corresponding F–401 reference.
The respondent also suggested that at
paragraph F–401(b)(2), ‘‘Starting over
with 0001’’ cannot be used in an
electronic world, and that the DD Form
250 needs to conform to the same
requirement (F–301(b)(2)) as the WAWF
RR.
Response: Part 4 references in the
final rule are updated as required. In
E:\FR\FM\20SER1.SGM
20SER1
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
regard to shipment numbering, the
system will not allow the shipment
number to start over with 0001 as any
duplication of the combined contract
number, delivery order number, and
shipment number results a duplication
error. In these cases, WAWF requires a
change in the shipment number prefix.
While on a paper DD Form 250, it is
possible to start over with 0001 when
the series is completely used, a change
in the shipment number prefix should
be required for consistency. The text at
F–401(b)(2) is revised to clarify this
process.
T. Part 5 Comments
Comment: A respondent commented
on Part 5 concerning the ‘‘alternate’’
release procedure. The respondent
noted that all other references in the
document are to ‘‘alternative’’ release
procedure, and would like to know
which is correct.
Response: The final rule is revised in
Part 5 to refer to ‘‘alternative’’ in lieu of
‘‘alternate.’’
U. WAWF Versions
Comment: A respondent stated there
are a number of changes incorporated in
the latest WAWF release that impact
MIRR data entry. The respondent noted
that changes include removal of ‘‘other’’
as an acceptance point and replacing it
with more specific data entries for
inspection, acceptance, and ship to
DoDAAC codes.
Response: There is no need to change
paragraph F–301(b)(6) as ‘‘Other’’ will
remain an option for the inspection and
acceptance point. DoD adopted business
rules regarding the inspection,
acceptance, and ship-to fields but kept
the source, destination, and other
inspection and acceptance points.
Therefore, no change is necessary.
sroberts on DSK5SPTVN1PROD with RULES
V. General Comments
Comment: One respondent stated that
Appendix F addresses the use of the
MIRR in WAWF, yet multiple types of
receiving and performance transactions
exist. Examples include:
Æ Receiving Report.
Æ Receiving Report—COMBO.
Æ Invoice 2-in-1 (Services Only).
Response: Appendix F only provides
instruction for use of the MIRR. Invoice
2-in-1 (services only) is used to
document acceptance of services when
a MIRR is not required. The COMBO
transaction in WAWF allows for the
vendor to do one set of data entry that
is split in the system into both a
receiving report, identical to the nonCOMBO receiving report, and an
invoice. The instructions for the data
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
entry in the COMBO are the same as the
data fields for the receiving report.
Comment: A respondent suggested at
paragraph F–301 rewording to state that
Electronic Document Access (EDA) will
automatically populate all available and
applicable contract data.
Response: This change is incorporated
at F–301(a)(3) in the final rule.
Comment: A respondent stated that
they had received multiple rejections of
receiving reports due to a formatting
issue. In one case, the receiving report
was rejected due to a dash being
dropped out of the line item stock
number upon loading to WAWF. In the
respondent’s opinion, the missing dash
should not be a reason for rejection. The
respondent requested adding specific
language to F–301(b)(15) to indicate that
missing dashes are acceptable in the
line item stock number.
Response: The respondent indicates a
dash was missing from the part number.
This changes the item identification
significantly. There are no known
concerns with the National Stock
Number functionality.
III. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and
13563 direct agencies to assess all costs
and benefits of available regulatory
alternatives and, if regulation is
necessary, to select regulatory
approaches that maximize net benefits
(including potential economic,
environmental, public health and safety
effects, distributive impacts, and
equity). E.O. 13563 emphasizes the
importance of quantifying both costs
and benefits, of reducing costs, of
harmonizing rules, and of promoting
flexibility. This is not a significant
regulatory action and, therefore, was not
subject to review under section 6(b) of
E.O. 12866, Regulatory Planning and
Review, dated September 30, 1993. This
rule is not a major rule under 5 U.S.C.
804.
IV. Regulatory Flexibility Act
DoD does not expect this final rule to
have a significant economic impact on
a substantial number of small entities
within the meaning of the Regulatory
Flexibility Act, 5 U.S.C. 601, et seq. The
final rule provides guidance on the
preparation and use of the electronic
WAWF Receiving Report which is now
required for use in most contracts.
Additionally, the rule addresses the
WAWF capability and instructions to
comply with reporting requirements for
IUID and RFID data submissions. DoD
has prepared a Final Regulatory
Flexibility Analysis, which is
summarized as follows:
PO 00000
Frm 00037
Fmt 4700
Sfmt 4700
58125
The objective of the rule is to facilitate
maximum use of WAWF by providing
detailed guidance. DFARS Subpart
232.70, Electronic Submission and
Processing of Payment Requests and
Receiving Reports, prescribes policies
for submitting and processing payment
requests in electronic form to comply
with 10 U.S.C. 2227, Electronic
Submission and Processing of Claims
for Contract Payments. WAWF is the
DoD system for contractors to submit
payment and receiving reports in an
electronic format. This final rule affects
all DoD contractors who are not exempt
from using WAWF. Exempt classes of
contracts are those that are listed under
the seven categories of contracts at
DFARS 232.7002, Policy. Record
keeping required is limited to that
necessary to properly invoice and
record shipping and receiving
information under Government
contracts. The preparation of these
records requires clerical and analytic
skills to create the documents and input
them into the electronic WAWF system.
The rule does not duplicate, overlap,
or conflict with any other Federal rules.
There are no known significant
alternatives to the rule that would meet
the requirements of 10 U.S.C. 2227,
Electronic Submission and Processing of
Claims for Contract Payments. Any
impact on small business is expected to
be beneficial by providing detailed use,
preparation and distribution guidance
for electronic submission in lieu of
preparing and submitting paper invoices
and receiving records.
V. Paperwork Reduction Act
The Paperwork Reduction Act (44
U.S.C. chapter 35) applies. The
Appendix F information collection
requirements in this rule are approved
under Office of Management and Budget
Control Number 0704–0248, DFARS
Appendix F, Material Inspection and
Receiving Report. The current approval
took into consideration use of the
automated WAWF system, so inclusion
of the WAWF guidance into Appendix
F adds no new information collection
requirements.
List of Subjects in 48 CFR Appendix F
to Chapter 2
Government procurement.
Mary Overstreet,
Editor, Defense Acquisition Regulations
System.
Therefore, 48 CFR chapter 2 is
amended by revising appendix F to read
as follows:
E:\FR\FM\20SER1.SGM
20SER1
58126
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
addition WAWF allows the printing of a RR
that can be used as a packing list or when
a signed copy is required.
Appendix F to Chapter 2—Material
Inspection and Receiving Report
Sec.
F–102 Applicability.
(a) DFARS 252.232–7003, Electronic
Submission of Payment Requests and
Receiving Reports, requires payment requests
and receiving reports using WAWF in nearly
all cases.
(b) The provisions of this appendix also
apply to supplies or services acquired by
DoD when the clause at DFARS 252.246–
7000, Material Inspection and Receiving
Report, is included in the contract.
(c) When DoD provides quality assurance
or acceptance services for non-DoD activities,
prepare a MIRR using the instructions in this
appendix, unless otherwise specified in the
contract.
Part 1—Introduction
F–101 General.
F–102 Applicability.
F–103 Use.
F–104 Application.
Part 2—Contract Quality Assurance On
Shipments Between Contractors
F–201 Procedures.
Part 3—Preparation of the Wide Area
Workflow Receiving Report (WAWF RR)
F–301 Preparation instructions.
F–302 Mode/method of shipment codes.
F–303 Consolidated shipments.
F–304 Correction instructions.
F–305 Invoice instructions.
F–306 Packing list instructions.
F–307 Receiving instructions.
Part 4—Preparation of the DD Form 250 and
DD Form 250C
F–401 Preparation instructions.
F–402 Mode/method of shipment codes.
F–403 Consolidated shipments.
F–404 Multiple consignee instructions.
F–405 Correction instructions.
F–406 Invoice instructions.
F–407 Packing list instructions.
F–408 Receiving instructions.
Part 5—Distribution of Wide Area Workflow
Receiving Report (WAWF RR), DD Form 250
and DD Form 250C
F–501 Distribution of WAWF RR.
F–502 Distribution of DD Form 250 and DD
Form 250C.
Part 6—Preparation of the DD Form 250–1
(Loading Report)
F–601 Instructions.
Part 7—Preparation of the DD Form 250–1
(Discharge Report)
F–701 Instructions.
Part 8—Distribution of the DD Form 250–1
F–801 Distribution.F–802 Corrected DD
Form 250–1.
F–802 Corrected DD Form 250–1.
Authority: 41 U.S.C. 1303 and 48 CFR
chapter 1.
sroberts on DSK5SPTVN1PROD with RULES
Part 1—Introduction
F–101 General.
(a) This appendix contains procedures and
instructions for the use, preparation, and
distribution of the Wide Area WorkFlow
Receiving Report (WAWF RR), the DD Form
250, Material Inspection and Receiving
Report (MIRR) and (DD Form 250 series
equivalents) and commercial shipping/
packing lists used to document Government
contract quality assurance.
(b) The use of the DD Form 250 is on an
exception basis (see DFARS 232.7003(a))
because use of the WAWF RR is now
required by most DoD contracts. WAWF
provides for electronic preparation and
documentation of acceptance of supplies and
services, and electronic invoicing. In
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
F–103 Use.
(a) The WAWF RR and the DD Form 250
are multipurpose reports used—
(1) To provide evidence of Government
contract quality assurance at origin or
destination;
(2) To provide evidence of acceptance at
origin, destination, or other;
(3) For packing lists;
(4) For receiving;
(5) For shipping;
(6) As a contractor invoice (the WAWF RR
or DD Form 250 alone cannot be used as an
invoice, however the option exists to create
an invoice from the Receiving Report or a
Combo (Invoice and Receiving Report) both
of which minimize data entry); and
(7) As commercial invoice support.
(b) Do not use the WAWF RR or the DD
Form 250 for shipments—
(1) By subcontractors, unless the
subcontractor is shipping directly to the
Government; or
(2) Of contract inventory. The WAWF
Property Transfer document should be used
for this type of shipment. Training for the
preparation of this document type is
available at https://wawftraining.eb.mil,
under the Property Transfer and Receipt
section.
(c) The contractor prepares the WAWF RR
or the DD Form 250, except for entries that
an authorized Government representative is
required to complete. When using a paper DD
Form 250, the contractor shall furnish
sufficient copies of the completed form, as
directed by the Government representative.
(d) Use the DD Form 250–1:
(1) For bulk movements of petroleum
products by tanker or barge to cover—
(i) Origin or destination acceptance of
cargo; or
(ii) Shipment or receipt of Government
owned products.
(2) To send quality data to the point of
acceptance in the case of origin inspection on
FOB destination deliveries or preinspection
at product source. Annotate the forms with
the words ‘‘INSPECTED FOR QUALITY
ONLY.’’
(e) In addition to the above uses, the
WAWF RR provides additional functionality,
not provided by the paper DD Form 250 that
complies with the following requirements:
(1) Item Unique Identification (IUID), when
the clause at DFARS 252.211–7003, Item
PO 00000
Frm 00038
Fmt 4700
Sfmt 4700
Identification and Valuation, is used in the
contract, reporting of IUID data is required.
WAWF captures the IUID data and forwards
the data to the IUID registry after acceptance.
WAWF can be used to report Unique Item
Identifiers (UIIs) at the line item level and
also UIIs embedded at the line item level.
(2) Radio Frequency Identification (RFID),
when the clause at DFARS 252.211–7006,
Radio Frequency Identification, is used in the
contract, WAWF will capture the RFID
information and forward the data to the
receiving location. Using WAWF is the only
way a contractor can comply with the clause
to furnish RFID data via an Advance
Shipping Notice (ASN). The RFID
information may be added at time of
submission, or via the WAWF Pack Later
functionality after acceptance.
F–104 Application.
(a) WAWF RR and DD Form 250.
(1) Use the WAWF RR or DD Form 250 for
delivery of contract line, subline, exhibit
line, or exhibit subline items. Do not use the
WAWF RR or DD Form 250 for those exhibit
line or exhibit subline items on a DD Form
1423, Contract Data Requirements List,
which indicate no DD Form 250 is required.
(2) If the shipped to, marked for, shipped
from, mode of shipment, contract quality
assurance and acceptance data are the same
for more than one shipment made on the
same day under the same contract,
contractors may prepare one WAWF RR or
DD Form 250 to cover all such shipments.
(3) If the volume of the shipment precludes
the use of a single car, truck, or other vehicle,
prepare a separate WAWF RR or DD Form
250 for the contents of each vehicle.
(4) When a shipment is consigned to an Air
Force activity and the shipment includes
items of more than one Federal supply class
(FSC) or material management code (MMC),
prepare a separate WAWF RR or DD Form
250 for items of each of the FSCs or MMCs
in the shipment. However, the cognizant
Government representative may authorize a
single WAWF RR or DD Form 250, listing
each of the FSCs or MMCs included in the
shipment on a separate continuation sheet.
The MMC appears as a suffix to the national
stock number applicable to the item.
(5) Consolidation of Petroleum Shipments
on a Single WAWF RR or DD Form 250.
(i) Contiguous United States. Contractors
may consolidate multiple car or truck load
shipments of petroleum made on the same
day, to the same destination, against the same
contract line item, on one WAWF RR or DD
Form 250. To permit verification of motor
deliveries, assign each load a load number
which can be identified to the shipment
number in Block 2 of the DD Form 250.
Include a shipping document (commercial or
Government) with each individual load
showing as a minimum—
(A) The shipper;
(B) Shipping point;
(C) Consignee;
(D) Contract and line item number;
(E) Product identification;
(F) Gross gallons (bulk only);
(G) Loading temperature (bulk only);
(H) American Petroleum Institute gravity
(bulk only);
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
(I) Identification of carrier’s equipment;
(J) Serial number of all seals applied; and
(K) Signature of supplier’s representative.
When acceptance is at destination, the
receiving activity retains the shipping
document(s) to verify the entries on the
consignee copy of the DD Form 250
forwarded by the contractor (reference F–401,
Table 1) before signing Block 21b.
(ii) Overseas. The same criteria as for
contiguous United States applies, except the
consolidation period may be extended, if
acceptable to the receiving activity, shipping
activity, Government finance office, and the
authorized Government representative
having cognizance at the contractor’s facility.
In addition, the contractor may include more
than one contract line item in each WAWF
RR or DD Form 250 if the shipped to, marked
for, shipped from, mode of shipment,
contract quality assurance, and acceptance
data are the same for all line items.
(6) Consolidation of Coal Shipments on a
Single WAWF RR or DD 250. Contractors may
consolidate multiple railcar or truck
shipments of coal made on the same day, to
the same destination, against the same
contract line items, on one WAWF RR or DD
250. To permit verification of truck
deliveries, assign each load a load number
which can be identified to the shipment
number in Block 2 of the DD Form 250 and
the analytical test report. Include a
commercial shipping document with each
individual truck load showing as a
minimum—
(i) The shipper;
(ii) The name or names;
(iii) Location and shipping point of the
mine or mines from which the coal
originates;
(iv) The contract number;
(v) The exact size of the coal shipped; and
(vi) A certified weighmaster’s certification
of weight for the truckload.
Include a waybill with each rail shipment
showing the identical information. To permit
verification of rail deliveries, identify each
railcar number comprising the shipment to
the shipment number in Block 2 of the DD
Form 250 and the analytical test report.
When acceptance is at destination, the
receiving activity must retain the shipping
document(s) to verify the entries on the
consignee copy of the DD Form 250.
(b) DD Form 250–1.
(1) Use a separate form for each tanker or
barge cargo loaded.
(2) The contractor may report more than
one barge in the same tow on a single form
if on the same contract and consigned to the
same destination.
(3) When liftings involve more than one
contract, prepare separate forms to cover the
portion of cargo loaded on each contract.
(4) Prepare a separate form for each
product or grade of product loaded.
(5) Use a separate document for each
tanker or barge cargo and each grade of
product discharged.
(6) For discharge, the contractor may report
more than one barge in the same tow on a
single form if from the same loading source.
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
Part 2—Contract Quality Assurance on
Shipments Between Contractors
F–201 Procedures
Follow the procedures at PGI F–201 for
evidence of required Government contract
quality assurance at a subcontractor’s facility.
Part 3—Preparation of the Wide Area
Workflow Receiving Report (WAWF RR)
F–301 Preparation instructions.
(a) General.
(1) Preparation instructions and training
for the WAWF RR are available at https://
wawftraining.eb.mil. The instructions on
preparing a WAWF RR are part of the Vendor
Training section.
(2) Prime contractors can direct
subcontractors to prepare and submit
documents in WAWF by giving their
subcontractors access to WAWF via the
creation of a Commercial and Government
Entity (CAGE) extension to the prime CAGE.
(3) If the contract is in Electronic
Document Access (EDA) (DoD’s contract
repository), then the WAWF system will
automatically populate all available and
applicable contract data.
(i) When source acceptance is required,
WAWF will populate the ‘‘Inspect By’’ with
the ‘‘Admin by’’ Department of Defense
Activity Address Code (DoDAAC). The
vendor shall change the DoDAAC if
Government Source Inspection (GSI) is
performed at other than the ‘‘Admin By.’’
(ii) Any fields that have been pre-filled
may be changed.
(iii) WAWF will also verify that CAGE
codes are valid and active in the CCR
(Central Contractor Registration), and that
DoDAACs and Military Assistance Program
Address Codes (MAPACs) are valid in
Defense Automatic Addressing System
(DAAS).
(4) WAWF will populate the address
information for CAGE codes, DODAACs, and
MAPACs from CCR and DAAS. These sites
are the DoD definitive sources for address
information. Any fields that have been prefilled may be changed or additional
information added.
(5) Do not include classified information in
WAWF.
(b) Completion instructions.
(1) Contract no/delivery order No.
(i) Enter the 13-position alpha-numeric
basic Procurement Instrument Identification
Number (PIIN) of the contract. When
applicable, enter the four-position alphanumeric call/order serial number that is
supplementary to the 13-position basic PIIN.
This number is also referred to as the
Supplementary Procurement Instrument
Identification Number (SPIIN). Use SPIINs
for (also see Subpart 204.70)—
(A) Delivery orders under indefinitedelivery type contracts;
(B) Orders under basic ordering
agreements; and
(C) Calls under blanket purchase
agreements.
(ii) Except as indicated in paragraph
(b)(1)(iii) of this appendix, do not enter
supplementary numbers used in conjunction
with basic PIINs to identify—
(A) Modifications of contracts and
agreements;
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
58127
(B) Modifications to calls or orders; or
(C) Document numbers representing
contracts written between contractors.
(iii) When shipping instructions are
furnished and shipment is made before
receipt of the confirming contract
modification (SF 30, Amendment of
Solicitation/Modification of Contract), enter a
comment in the Misc. Info Tab to this effect.
This will appear in the Comments section of
the printed WAWF RR.
(iv) For DoD delivery orders on non-DoD
contracts, enter the non-DoD contract number
in the contract number field and enter the
DoD contract number and, when applicable,
delivery order number in the delivery order
field.
(2) Shipment No.
(i) The shipment number format requires
first three data positions to be alpha, fourth
position alpha-numeric and last three
positions numeric, e.g., DFAR001 or
DAR0001. Any document used as a packing
list must include the shipment number
information.
(A) The prime contractor shall control and
assign the shipment number prefix. The
shipment number shall consist of three
alphabetic characters for each ‘‘Shipped
From’’ address. The shipment number prefix
shall be different for each ‘‘Shipped From’’
address and shall remain constant
throughout the life of the contract. The prime
contractor may assign separate prefixes when
shipments are made from different locations
within a facility identified by one ‘‘Shipped
From’’ address.
(B) Number the first shipment 0001 for
shipments made under the contract or
contract and order number from each
‘‘Shipped From’’ address, or shipping
location within the ‘‘Shipped From’’ address.
Consecutively number all subsequent
shipments with the identical shipment
number prefix. While shipments should be
created sequentially they can be released and
accepted out of sequence.
(1) Use alpha-numeric serial numbers
when more than 9,999 numbers are required.
Serially assign alpha-numeric numbers with
the alpha in the first position (the letters I
and O shall not be used) followed by the
three-position numeric serial number. Use
the following alpha-numeric sequence:
A000 through A999 (10,000 through 10,999)
B000 through B999 (11,000 through 11,999)
Z000 through Z999 (34,000 through 34,999)
(2) When this series is completely used, the
shipment number prefix will have to be
changed when the series is completely used.
WAWF will not allow duplicate shipment
numbers to be created against a contract or
contract and delivery order.
(ii) Reassign the shipment number of the
initial shipment where a ‘‘Replacement
Shipment’’ is involved (see paragraph
(b)(16)(iv)(F) of this appendix).
(iii) The prime contractor shall control
deliveries and on the final shipment of the
contract shall end the shipment number with
a ‘‘Z.’’ Where the final shipment is from other
than the prime contractor’s plant, the prime
contractor may elect either to—
(A) Direct the subcontractor making the
final shipment to end that shipment number
with a ‘‘Z’’; or
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
58128
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
(B) Upon determination that all
subcontractors have completed their
shipments, to correct the DD Form 250 (see
F–304) covering the final shipment made
from the prime contractor’s plant by addition
of a ‘‘Z’’ to that shipment number.
(iv) Contractors follow the procedures in
F–305 to use commercial invoices.
(3) Date shipped. Enter the date the
shipment is released to the carrier or the date
the services are completed. If the shipment
will be released after the date of contract
quality assurance and/or acceptance, enter
the estimated date of release. When the date
is estimated, enter an ‘‘E’’ or select an ‘‘E’’
from the drop down menu in the ‘‘Estimated’’
block after the date. Do not delay submission
of the WAWF RR for lack of entry of the
actual shipping date. Correction of the
WAWF RR is not required to show the actual
shipping date (see F–303). Once the
document is submitted the shipment date
cannot be changed.
(4) B/L TCN. When applicable, enter—
(i) The commercial or Government bill of
lading number after ‘‘B/L;’’ WAWF provides
the capability to separately and correctly
identify the Government Bill of Lading (GBL)
from a Commercial Bill of Lading (CBL). An
authorized user will select whether the
entered bill of lading number is either a GBL
number or a CBL number.
(ii) The transportation control number
must be a 17 alpha/numeric digit min/max
field, and WAWF provides the capability to
enter two secondary transportation tracking
numbers.
(5) Line haul mode. Select the Line Haul
Mode of Shipment code from a drop down
menu in WAWF.
(6) Inspection and acceptance point. Enter
an ‘‘S’’ for Origin or ‘‘D’’ for Destination. In
addition to ‘‘S’’ and ‘‘D,’’ WAWF allows
acceptance at Other (O). For purposes of
conforming to contract, ‘‘O’’ is equivalent to
‘‘D’’. In WAWF, destination acceptance is
performed by the ‘‘Ship to’’ DODAAC
organization and ‘‘Other’’ permits the
acceptance of destination documents at a
location other than the ‘‘Ship to.’’ The goods
or services will be shipped to one location
and the paperwork will be routed to another
location for the actual acceptance.
(7) Prime contractor/code. Enter the prime
CAGE code to which the contract was
awarded.
(8) Administered by/code. Enter the
DoDAAC code of the contract administration
office cited in the contract.
(9) Shipped from/code.
(i) Enter the CAGE or DoDAAC code of the
‘‘Shipped From’’ location. If it is the same as
the CAGE code leave blank.
(ii) For performance of services line items
which do not require delivery of items upon
completion of services, enter the code of the
location at which the services were
performed. As mentioned in (i) above, if
identical to the prime CAGE code leave
blank.
(10) FOB. Enter an ‘‘S’’ for Origin or ‘‘D’’
for Destination as specified in the contract.
Enter an alphabetic ‘‘O’’ if the ‘‘FOB’’ point
cited in the contract is other than origin or
destination.
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
(11) Payment will be made by/code. Enter
the DoDAAC code of the payment office cited
in the contract.
(12) Shipped to/code. Enter the DoDAAC,
MAPAC, or CAGE code from the contract or
shipping instructions.
(13) Marked for/code. Enter the code from
the contract or shipping instructions. Only
valid DoDAACs, MAPACs, or CAGE codes
can be entered. Vendors should use the
WAWF ‘‘Mark for Rep’’ and ‘‘Mark for
Secondary’’ fields for textual marking
information specified in the contract.
(14) Item No. Enter the item number used
in the contract. Use a valid 4 or 6 character
line item number under the Uniform Contract
Line Item Numbering System (see 204.71).
Line item numbers with 6 characters with
numbers in the final two positions are not
deliverable or billable.
(15) Stock/part number/description.
(i) Enter the following for each line item:
(A) The national stock number (NSN) or
noncatalog number. If the contract contains
NSNs as well as other identification (e.g.,
part numbers) the contractor should place the
NSN information in the Stock Part Number
field and the remaining numbers in the line
item description field. The data entered in
the NSN field must reflect the NSN of the
material item being shipped and should be a
valid NSN, 13 positions in length. In the
‘‘Type’’ drop-down field, select the
corresponding type for the data entered. If no
National Stock Number (NSN) or other valid
‘‘Type’’ is available, the word ‘‘NONE’’ may
be entered for the Stock/Part Number, with
a corresponding ‘‘Type’’ of any value other
than NSN selected from the drop-down box.
(B) In the description field, if required by
the contract for control purposes, enter: The
make, model, serial number, lot, batch,
hazard indicator, or similar description.
(C) The Military Standard Requisitioning
and Issue Procedures (MILSTRIP) must be
placed on the MILSTRIP Tab, not in the line
item description field. Enter the MILSTRIP
data for each CLIN when MILSTRIP data is
identified in the contract.
(ii) For service line items, select SV for
‘‘SERVICE’’ in the type field followed by as
short a description as is possible in the
description field. Some examples of service
line items are maintenance, repair, alteration,
rehabilitation, engineering, research,
development, training, and testing. The
‘‘Ship To’’ code and the ‘‘Unit’’ will have to
be filled out. The ‘‘Shipped To’’ code is the
destination Service Acceptor Code for
WAWF. If source inspected and accepted
enter the service performance location as the
‘‘Ship To’’ code.
(iii) For all contracts administered by the
Defense Contract Management Agency, with
the exception of fast pay procedures, enter
the gross weight of the shipment.
(iv) In the description field enter the
following as appropriate (entries may be
extended through Block 20).
(A) Enter in capital letters any special
handling instructions/limits for material
environmental control, such as temperature,
humidity, aging, freezing, shock, etc.
(B) When a shipment is chargeable to Navy
appropriation 17X4911, enter the
appropriation, bureau control number (BCN),
PO 00000
Frm 00040
Fmt 4700
Sfmt 4700
and authorization accounting activity (AAA)
number (e.g., 17X4911–14003–104).
(C) When the Navy transaction type code
(TC), ‘‘2T’’ or ‘‘7T’’ is included in the
appropriation data, enter ‘‘TC 2T’’ or ‘‘TC
7T.’’
(D) When an NSN is required by but not
cited in a contract and has not been
furnished by the Government, the contractor
may make shipment without the NSN at the
direction of the contracting officer. Enter the
authority for such shipment.
(E) When Government furnished property
(GFP) is included with or incorporated into
the line item, enter the letters ‘‘GFP.’’
(F) On shipments of Government furnished
aeronautical equipment (GFAE) under Air
Force contracts, enter the assignment AERNO
control number, e.g., ‘‘AERNO 60–6354.’’
(G) For items shipped with missing
components, enter and complete the
following:
‘‘Item(s) shipped short of the following
component(s): NSN or comparable
identification llll, Quantity llll,
Estimated Value llll, Authority
llll’’
(H) When shipment is made of components
which were short on a prior shipment, enter
and complete the following:
‘‘These components were listed as
shortages on shipment number llll, date
shipped llll’’
(I) When shipments involve drums,
cylinders, reels, containers, skids, etc.,
designated as returnable under contract
provisions, enter and complete the following:
‘‘Return to llll, Quantity llll,
Item llll, Ownership (Government/
contractor).’’
(J) Enter the total number of shipping
containers, the type of containers, and the
container number(s) assigned for the
shipment.
(K) On foreign military sales (FMS)
shipments, enter the special markings, and
FMS case identifier from the contract. Also
enter the gross weight.
(L) When test/evaluation results are a
condition of acceptance and are not available
prior to shipment, the following note shall be
entered if the shipment is approved by the
contracting officer:
‘‘Note: Acceptance and payment are
contingent upon receipt of approved test/
evaluation results.’’
The contracting officer will advise—
(1) The consignee of the results (approval/
disapproval); and
(2) The contractor to withhold invoicing
pending attachment of the approved test/
evaluation results.
(M) For clothing and textile contracts
containing a bailment clause, enter the words
‘‘GFP UNIT VALUE.’’
(N) When the initial unit incorporating an
approved value engineering change proposal
(VECP) is shipped, enter the following
statement:
This is the initial unit delivered which
incorporates VECP No. llll, Contract
Modification No. llll, dated llll
(16) Quantity shipped/received.
(i) Enter the quantity shipped, using the
unit of measure in the contract for payment.
When a second unit of measure is used for
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
purposes other than payment, enter the
appropriate quantity in the description field.
(ii) On the final shipment of a line item of
a contract containing a clause permitting a
variation of quantity and an underrun
condition exists, the prime contractor shall
choose the Ship Advice Code ‘‘Z’’. Where the
final shipment is from other than the prime
contractor’s plant and an underrun condition
exists, the prime contractor may elect to
direct the subcontractor making the final
shipment to choose the Ship Advice Code
‘‘Z’’;
(iii) When the Government is performing
destination acceptance the acceptor should
enter actual quantity received in apparent
good condition in the ‘‘Qty. Accepted’’ field
of the Acceptor Line Item Tab.
(17) Unit of measure. Enter the
abbreviation of the unit measure as indicated
in the contract for payment. Where a second
unit of measure is indicated in the contract
for purposes other than payment or used for
shipping purposes, enter the second unit of
measure in the description field. Authorized
abbreviations are listed in MIL–STD–129,
Marking for Shipping and Storage and in the
WAWF Unit of Measure Table Link. For
example, LB for pound, SH for sheet.
(18) Unit price. The contractor may, at its
option, enter unit prices on all WAWF RR
copies, except as a minimum:
(i) The contractor shall enter unit prices for
each item of property fabricated or acquired
for the Government and delivered to a
contractor as Government furnished property
(GFP). Get the unit price from Section B of
the contract. If the unit price is not available,
use an estimate. The estimated price should
be the contractor’s estimate of what the items
will cost the Government. When the price is
estimated, enter ‘‘Estimated Unit Price’’ in
the description field. However, if the contract
has Item Unique Identification (IUID)
requirements and the receiving report is
being processed in WAWF the unit price
represents the acquisition cost that will be
passed to the IUID registry. Therefore, the
unit price is required (see the clause at
DFARS 252.211–7003, Item Identification
and Valuation). When delivering GFP via
WAWF to another contractor, WAWF will
initiate a property transfer if the vendor who
is initiating the WAWF RR is also registered
as a vendor property shipper in WAWF and
the vendor receiving the property is also a
vendor property receiver in WAWF.
(ii) For clothing and textile contracts
containing a bailment clause, enter the cited
Government furnished property unit value as
‘‘GFP UNIT VALUE’’ in the description field.
(19) Amount. WAWF will calculate and
populate the amount by multiplying the unit
price times the quantity.
(20) Contract Quality Assurance (CQA).
(i) The words ‘‘conform to contract’’
contained in the text above the signature
block in the WAWF RR Header Tab relate to
quality and to the quantity of the items on
the report. Enter notes taking exception in
Misc. Info Tab comment field or on attached
supporting documents with an appropriate
block cross-reference.
(ii) When a shipment is authorized under
an alternative release procedure, contractors
will execute the alternative release procedure
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
in WAWF by including the appropriate
indicator in the electronic transaction rather
than through inclusion or attachment of the
text of the certificate. The alternative release
procedure only provides for release of
shipment; Government acceptance must still
be indicated by a Government official’s
signature on the WAWF RR.
(iii) When contract terms provide for use
of Certificate of Conformance and shipment
is made under these terms, contractors will
execute Certificates in WAWF by including
the appropriate indicator in the electronic
transaction rather than through inclusion or
attachment of the text of the certificate.
Government acceptance must still be
indicated by a Government official’s
signature on the WAWF RR.
(iv) Origin.
(A) The authorized Government
representative must:—
(1) Place an ‘‘X’’ in the appropriate CQA
and/or acceptance box(es) to show origin
CQA and/or acceptance; and
(2) Sign and date.
WAWF will enter the typed, stamped, or
printed name, title, email address, and
commercial telephone number.
(B) When fast pay procedures apply, the
contractor or subcontractor shall select
‘‘FAST PAY’’ when creating the WAWF RR.
When CQA is required, the authorized
Government representative shall execute the
block as required by paragraph (A).
(v) Destination. When CQA and acceptance
or acceptance is at destination, the
authorized Government representative
must—
(A) Place an ‘‘X’’ in the appropriate
box(es); and
(B) Sign and date.
WAWF will enter the typed, stamped, or
printed name, title, email address, and
commercial telephone number.
(21) Contractor use only. MISC. INFO. Self
explanatory.
F–302
Mode/method of shipment codes.
Code
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
PO 00000
Description
Motor, truckload.
Motor, less than truckload.
Van (unpacked, uncrated personal or
Government property).
Driveaway, truckaway, towaway.
Bus.
Air Mobility Command (Channel and
Special Assignment Airlift Mission).
Surface parcel post.
Air parcel post.
Government trucks, for shipment outside local delivery area.
Air, small package carrier.
Rail, carload.1
Rail, less than carload.1
Surface, freight forwarder.
LOGAIR.
Organic military air (including aircraft
of foreign governments).
Through Government Bill of Lading
(TGBL).
Commercial air freight (includes regular and expedited service provided
by major airlines; charters and air
taxis).
Frm 00041
Fmt 4700
Sfmt 4700
Code
R
S
T
U
V
W
X
Y
Z
2
3
4
5
6
7
8
9
58129
Description
European Distribution System or Pacific Distribution System.
Scheduled Truck Service (STS) (applies to contract carriage, guaranteed traffic routings and/or scheduled service).
Air freight forwarder.
QUICKTRANS.
SEAVAN.
Water, river, lake, coastal (commercial).
Bearer, walk-thru (customer pickup of
material).
Military Intratheater Airlift Service.
Military Sealift Command (MSC) (controlled contract or arranged space).
Government watercraft, barge, lighter.
Roll-on Roll-off (RORO) service.
Armed
Forces
Courier
Service
(ARFCOS).
Surface, small package carrier.
Military official mail (MOM).
Express mail.
Pipeline.
Local delivery by Government or commercial truck (includes on base
transfers; deliveries between air,
water, or motor terminals; and adjacent activities). Local delivery areas
are identified in commercial carriers’
tariffs which are filed and approved
by regulatory authorities.
1 Includes
trailer/container-on-flat-car
cluding SEAVAN).
F–303
(ex-
Consolidated shipments.
When individual shipments are held at the
contractor’s plant for authorized
transportation consolidation to a single bill of
lading, the contractor may prepare the
WAWF RR at the time of CQA or acceptance
prior to the time of actual shipment.
F–304
Correction instructions.
Functionality for correcting a WAWF RR is
being developed. Preparation instructions
and training for corrections will be available
at https://wawftraining.eb.mil once the
functionality is deployed. The instructions
will be part of the vendor training.
F–305
Invoice instructions.
Contractors shall submit payment requests
and receiving reports in electronic form,
unless an exception in DFARS 232.7002
applies. Contractor submission of the
material inspection and receiving
information required by this appendix by
using the WAWF electronic form (see
paragraph (b) of the clause at DFARS
252.232–7003) fulfills the requirement for a
DD Form 250 MIRR. Contractors should
ensure the packaging documentation
includes a Government signed receiving
report when the contract requires origin
inspection and acceptance. Contractors must
include a signed document indicating
material receipt and acceptance has occurred
in the container with the exception of
material shipments that are approved for
Alternative Release Procedures (ARP).
E:\FR\FM\20SER1.SGM
20SER1
58130
F–306
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
Packing list instructions.
Contractors may also use a WAWF
processed RR as a packing list. WAWF
provides options to print the RR. These
printed RRs may also be used if a signed
copy is required.
(a) WAWF provides a print capability for
its RR. The WAWF printed RR can be
identified by its distinctive format and by the
text ‘‘Please look in WAWF for signed copy’’
underneath the ‘‘RECEIVING REPORT’’ title
at the top of each printed page. This printed
copy can be used as a packing list. If needed,
the signature can be verified by reviewing the
signed RR in WAWF.
(b) Contractors can also print a RR from
their systems (not WAWF). If such a signed
copy is required by the contractor, the
contractor will print the WAWF RR only after
a signature is applied by the Government
Inspector or Acceptor in WAWF. Copies
printed will be annotated with ‘‘\\original
signed in WAWF\\’’ in lieu of the inspector/
acceptor’s signature.
F–307 Receiving instructions.
If CQA and acceptance or acceptance of
supplies is required upon arrival at
destination, see F–301(b)(20)(v) for
instructions.
sroberts on DSK5SPTVN1PROD with RULES
Part 4—Preparation of the DD Form 250 and
DD Form 250C
F–401 Preparation instructions.
(a) General.
(1) Dates must use nine spaces consisting
of the four digits of the year, three-position
alphabetic month abbreviation, and two
digits for the day. For example, 2000AUG07,
2000SEP24.
(2) Addresses must consist of the name,
street address/P.O. box, city, state, and ZIP
code.
(3) Enter to the right of and on the same
line as the word ‘‘Code’’ in Blocks 9 through
12 and in Block 14—
(i) The Commercial and Government Entity
Handbook (H4/H8) code;
(ii) The DoD activity address code
(DoDAAC) as it appears in the DoD Activity
Address Directory (DoDAAD), DoD 4000.25–
6–M; or
(iii) The Military Assistance Program
Address Directory (MAPAD) code.
(4) Enter the DoDAAC, CAGE (H4/H8), or
MAPAD code in Block 13.
(5) The data entered in the blocks at the top
of the DD Form 250c must be identical to the
comparable entries in Blocks 1, 2, 3, and 6
of the DD Form 250.
(6) Enter overflow data from the DD Form
250 in Block 16 or in the body of the DD
Form 250c with an appropriate crossreference. Do not number or distribute
additional DD Form 250c sheets, solely for
continuation of Block 23 data as part of the
MIRR.
(7) Do not include classified information in
the MIRR. MIRRs must not be classified.
(b) Completion instructions.
(1) Block 1—Procurement instrument
identification (Contract) NO. See paragraph
F–301(b)(1).
(2) Block 2—Shipment no. See F–301(b)(2),
Shipment no. When the series is completely
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
used, change the shipment number prefix
and start with 0001.
(3) Block 3—Date shipped. Enter the date
the shipment is released to the carrier or the
date the services are completed. If the
shipment will be released after the date of
CQA and/or acceptance, enter the estimated
date of release. When the date is estimated,
enter an ‘‘E’’ after the date. Do not delay
distribution of the MIRR for entry of the
actual shipping date. Reissuance of the MIRR
is not required to show the actual shipping
date (see F–403).
(4) Block 4—B/L TCN. When applicable,
enter—
(i) The commercial or Government bill of
lading number after ‘‘B/L;’’
(ii) The transportation control number after
‘‘TCN’’ (when a TCN is assigned for each line
item on the DD Form 250 under Block 16
instructions, insert ‘‘See Block 16’’); and
(iii) The initial (line haul) mode of
shipment code in the lower right corner of
the block (see F–402).
(5) Block 5—Discount terms.
(i) The contractor may enter the discount
in terms of percentages on all copies of the
MIRR.
(ii) Use the procedures in F–406 when the
MIRR is used as an invoice.
(6) Block 6—Invoice no./date.
(i) The contractor may enter the invoice
number and actual or estimated date of
invoice submission on all copies of the
MIRR. When the date is estimated, enter an
‘‘E’’ after the date. Do not correct MIRRs
other than invoice copies to reflect the actual
date of invoice submission.
(ii) Use the procedures in F–406 when the
MIRR is used as an invoice.
(7) Block 7—Page/of. Consecutively
number the pages of the MIRR. On each page
enter the total number of pages of the MIRR.
(8) Block 8—Acceptance point. Enter an
‘‘S’’ for Origin or ‘‘D’’ for destination.
(9) Block 9—Prime contractor/code. Enter
the code and address.
(10) Block 10—Administered by/code.
Enter the code and address of the contract
administration office cited in the contract.
(11) Block 11—Shipped from/code/fob.
(i) Enter the code and address of the
‘‘Shipped From’’ location. If identical to
Block 9, enter ‘‘See Block 9.’’
(ii) For performance of services line items
which do not require delivery of items upon
completion of services, enter the code and
address of the location at which the services
were performed. If the DD Form 250 covers
performance at multiple locations, or if
identical to Block 9, enter ‘‘See Block 9.’’
(iii) Enter on the same line and to the right
of ‘‘FOB’’ an ‘‘S’’ for Origin or ‘‘D’’ for
Destination as specified in the contract. Enter
an alphabetic ‘‘O’’ if the ‘‘FOB’’ point cited
in the contract is other than origin or
destination.
(iv) For destination or origin acceptance
shipments involving discount terms, enter
‘‘DISCOUNT EXPEDITE’’ in at least one-half
inch outline-type style letters across Blocks
11 and 12. Do not obliterate other
information in these blocks.
(12) Block 12—Payment will be made by/
code. Enter the code and address of the
payment office cited in the contract.
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
(13) Block 13—Shipped to/code. Enter the
code and address from the contract or
shipping instructions.
(14) Block 14—Marked for/code. Enter the
code and address from the contract or
shipping instructions. When three-character
project codes are provided in the contract or
shipping instructions, enter the code in the
body of the block, prefixed by ‘‘Proj’’; do not
enter in the Code block.
(15) Block 15—Item No. See paragraph F–
301(b)(14) with the exception to
F301(b)(2)(B)2 that line item numbers not in
accordance with the Uniform Contract Line
Item Numbering System may be entered
without regard to positioning.
(16) Block 16—Stock/part No./description.
(i) Use single or double spacing between
line items when there are less than four line
items. Use double spacing when there are
four or more line items. Enter the following
for each line item:
(A) The national stock number (NSN) or
noncatalog number. Where applicable,
include a prefix or suffix. If a number is not
provided, or it is necessary to supplement the
number, include other identification such as
the manufacturer’s name or Federal supply
code (as published in Cataloging Handbook
H4–1), and the part number. Show additional
part numbers in parentheses or slashes. Show
the descriptive noun of the item
nomenclature and if provided, the
Government assigned management/material
control code. The contractor may use the
following technique in the case of equal kind
supply items. The first entry shall be the
description without regard to kind. For
example, ‘‘Shoe-Low Quarter-Black,’’
‘‘Resistor,’’ ‘‘Vacuum Tube,’’ etc. Below this
description, enter the contract line item
number in Block 15 and Stock/Part number
followed by the size or type in Block 16.
(B) On the next printing line, if required by
the contract for control purposes, enter: The
make, model, serial number, lot, batch,
hazard indicator, or similar description.
(C) On the next printing lines enter—
(1) The MIPR number prefixed by ‘‘MIPR’’
or the MILSTRIP requisition number(s) when
provided in the contract; or
(2) Shipping instructions followed on the
same line (when more than one requisition
is entered) by the unit for payment and the
quantity shipped against each requisition.
Example:
V04696–185–750XY19059A—EA 5
N0018801776038XY3211BA—EA 200
AT650803050051AAT6391J—EA 1000
(D) When a TCN is assigned for each line
item, enter on the next line the transportation
control number prefixed by ‘‘TCN.’’
(ii) For service line items, enter the word
‘‘SERVICE’’ followed by as short a
description as is possible in no more than 20
additional characters. Some examples of
service line items are maintenance, repair,
alteration, rehabilitation, engineering,
research, development, training, and testing.
Do not complete Blocks 4, 13, and 14 when
there is no shipment of material.
(iii) For all contracts administered by the
Defense Contract Management Agency, with
the exception of fast pay procedures, enter
and complete the following:
Gross Shipping Wt.
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
____________
State weight in pounds only.
(iv) Starting with the next line, enter the
following as appropriate (entries may be
extended through Block 20). When entries
apply to more than one line item in the
MIRR, enter them only once after the last line
item entry. Reference applicable line item
numbers.
(A) Enter in capital letters any special
handling instructions/limits for material
environmental control, such as temperature,
humidity, aging, freezing, shock, etc.
(B) When a shipment is chargeable to Navy
appropriation 17X4911, enter the
appropriation, bureau control number (BCN),
and authorization accounting activity (AAA)
number (e.g., 17X4911–14003–104).
(C) When the Navy transaction type code
(TC), ‘‘2T’’ or ‘‘7T’’ is included in the
appropriation data, enter ‘‘TC 2T’’ or ‘‘TC
7T.’’
(D) When an NSN is required by but not
cited in a contract and has not been
furnished by the Government, the contractor
may make shipment without the NSN at the
direction of the contracting officer. Enter the
authority for such shipment.
(E) When Government furnished property
(GFP) is included with or incorporated into
the line item, enter the letters ‘‘GFP.’’
(F) When shipment consists of
replacements for supplies previously
furnished, enter in capital letters
‘‘REPLACEMENT SHIPMENT.’’ (See F–401,
Block 17, for replacement indicators.)
(G) On shipments of Government furnished
aeronautical equipment (GFAE) under Air
Force contracts, enter the assignment AERNO
control number, e.g., ‘‘AERNO 60–6354.’’
(H) For items shipped with missing
components, enter and complete the
following:
‘‘Item(s) shipped short of the following
component(s):
NSN or comparable identification
llll, Quantity llll, Estimated
Value llll, Authority llll’’
(I) When shipment is made of components
which were short on a prior shipment, enter
and complete the following:
‘‘These components were listed as shortages
on shipment number llll, date shipped
llll’’
(J) When shipments involve drums,
cylinders, reels, containers, skids, etc.,
designated as returnable under contract
provisions, enter and complete the following:
‘‘Return to llll, Quantity llll, Item
llll, Ownership (Government/
contractor).’’
(K) Enter the total number of shipping
containers, the type of containers, and the
container number(s) assigned for the
shipment.
(L) On foreign military sales (FMS)
shipments, enter the special markings, and
FMS case identifier from the contract. Also
enter the gross weight.
(M) When test/evaluation results are a
condition of acceptance and are not available
prior to shipment, the following note shall be
entered if the shipment is approved by the
contracting officer:
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
‘‘Note: Acceptance and payment are
contingent upon receipt of approved test/
evaluation results.’’
The contracting officer will advise—
(1) The consignee of the results (approval/
disapproval); and
(2) The contractor to withhold invoicing
pending attachment of the approved test/
evaluation results.
(N) The copy of the DD Form 250 required
to support payment for destination
acceptance (top copy of those with shipment)
or ARP origin acceptance shall be identified
as follows: enter ‘‘PAYMENT COPY’’ in
approximately one-half inch outline type
style letters with ‘‘FORWARD TO BLOCK 12
ADDRESS’’ in approximately one-quarter
inch letters immediately below. Do not
obliterate any other entries.
(O) For clothing and textile contracts
containing a bailment clause, enter the words
‘‘GFP UNIT VALUE.’’
(P) When the initial unit incorporating an
approved value engineering change proposal
(VECP) is shipped, enter the following
statement:
This is the initial unit delivered which
incorporates VECP No. llll, Contract
Modification No. llll, dated llll
(17) Block 17—Quantity shipped/received.
(i) Enter the quantity shipped, using the
unit of measure in the contract for payment.
When a second unit of measure is used for
purposes other than payment, enter the
appropriate quantity directly below in
parentheses.
(ii) On the final shipment of a line item of
a contract containing a clause permitting a
variation of quantity and an underrun
condition exists, the prime contractor shall
enter a ‘‘Z’’ below the last digit of the
quantity. Where the final shipment is from
other than the prime contractor’s plant and
an underrun condition exists, the prime
contractor may elect either to—
(A) Direct the subcontractor making the
final shipment to enter a ‘‘Z’’ below the
quantity; or
(B) Upon determination that all
subcontractors have completed their
shipments, correct the DD Form 250 (see
F–405) coving the final shipment of the line
item from the prime contractor’s plant by
addition of a ‘‘Z’’ below the quantity. Do not
use the ‘‘Z’’ on deliveries which equal or
exceed the contract line item quantity.
(iii) For replacement shipments, enter ‘‘A’’
below the last digit of the quantity, to
designate first replacement, ‘‘B’’ for second
replacement, etc. Do not use the final
shipment indicator ‘‘Z’’ on underrun
deliveries when a final line item shipment is
replaced.
17. QUANTITY
SHIP/REC’D
1000
(10)
Z
(iv) If the quantity received is the same
quantity shipped and all items are in
PO 00000
Frm 00043
Fmt 4700
Sfmt 4700
58131
apparent good condition, enter by a check
mark. If different, enter actual quantity
received in apparent good condition below
quantity shipped and circle. The receiving
activity will annotate the DD Form 250
stating the reason for the difference.
(18) Block 18—Unit. Enter the abbreviation
of the unit measure as indicated in the
contract for payment. Where a second unit of
measure is indicated in the contract for
purposes other than payment or used for
shipping purposes, enter the second unit of
measure directly below in parentheses.
Authorized abbreviations are listed in MIL–
STD–129, Marking for Shipping and Storage.
For example, LB for pound, SH for sheet.
18. UNIT
LB
(SH)
(19) Block 19—Unit price. The contractor
may, at its option, enter unit prices on all
MIRR copies, except as a minimum:
(i) The contractor shall enter unit prices on
all MIRR copies for each item of property
fabricated or acquired for the Government
and delivered to a contractor as Government
furnished property (GFP). Get the unit price
from Section B of the contract. If the unit
price is not available, use an estimate. The
estimated price should be the contractor’s
estimate of what the items will cost the
Government. When the price is estimated,
enter an ‘‘E’’ after the unit price.
(ii) Use the procedures in F–406 when the
MIRR is used as an invoice.
(iii) For clothing and textile contracts
containing a bailment clause, enter the cited
Government furnished property unit value
opposite ‘‘GFP UNIT VALUE’’ entry in Block
16.
(iv) Price all copies of DD Forms 250 for
FMS shipments with actual prices, if
available. If actual price are not available, use
estimated prices. When the price is
estimated, enter an ‘‘E’’ after the price.
(20) Block 20—AMOUNT. Enter the
extended amount when the unit price is
entered in Block 19.
(21) Block 21—Contract quality assurance
(CQA).
(i) The words ‘‘conform to contract’’
contained in the printed statements in Blocks
21a and 21b relate to quality and to the
quantity of the items on the report. Do not
modify the statements. Enter notes taking
exception in Block 16 or on attached
supporting documents with an appropriate
block cross-reference.
(ii) When a shipment is authorized under
alternative release procedure, attach or
include the appropriate contractor signed
certificate on the top copy of the DD Form
250 copies distributed to the payment office
or attach or include the appropriate
contractor certificate on the contract
administration office copy when contract
administration (Block 10 of the DD Form 250)
is performed by the Defense Contract
Management Agency.
(iii) When contract terms provide for use
of Certificate of Conformance and shipment
is made under these terms, the contractor
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
58132
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
shall enter in capital letters ‘‘CERTIFICATE
OF CONFORMANCE’’ in Block 21a on the
next line following the CQA and acceptance
statements. Attach or include the appropriate
contractor signed certificate on the top copy
of the DD Form 250 copies distributed to the
payment office or attach or include the
appropriate certificate on the contract
administration office copy when contract
administration (Block 10 of the DD Form 250)
is performed by the Defense Contract
Management Agency. In addition, attach a
copy of the signed certificate to, or enter on,
copies of the MIRR sent with shipment.
(iv) Origin.
(A) The authorized Government
representative must—
(1) Place an ‘‘X’’ in the appropriate CQA
and/or acceptance box(es) to show origin
CQA and/or acceptance. When the contract
requires CQA at destination in addition to
origin CQA, enter an asterisk at the end of
the statement and an explanatory note in
Block 16;
(2) Sign and date;
(3) Enter the typed, stamped, or printed
name, title, mailing address, and commercial
telephone number.
(B) When alternative release procedures
apply—
(1) The contractor or subcontractor shall
complete the entries required under
paragraph (A) and enter in capital letters
‘‘ALTERNATIVE RELEASE PROCEDURE’’ on
the next line following the printed CQA/
acceptance statement.
(2) When acceptance is at origin and
contract administration is performed by an
office other than the Defense Contract
Management Agency, the contractor shall
furnish the four payment office copies of the
MIRR to the authorized Government
representative for dating and signing of one
copy and forwarding of all copies to the
payment office.
(3) When acceptance is at origin and
contract administration is performed by the
Defense Contract Management Agency,
furnish the contract administration office
copy of the MIRR to the authorized
Government representative for dating and
signing and forwarding to the contract
administration office (see F–501, Table 1).
(C) When fast pay procedures apply, the
contractor or subcontractor shall enter in
capital letters ‘‘FAST PAY’’ on the next line
following the printed CQA/acceptance
statement. When CQA is required, the
authorized Government representative shall
execute the block as required by paragraph
(A).
(D) When Certificate of Conformance
procedures apply, inspection or inspection
and acceptance are at source, and the
contractor’s Certificate of Conformance is
required, the contractor shall enter in capital
letters ‘‘CERTIFICATE OF CONFORMANCE’’
as required by paragraph (b)(21)(iii) of this
appendix.
(1) For contracts administered by an office
other than the Defense Contract Management
Agency, furnish the four payment office
copies of the MIRR to the authorized
Government representative for dating and
signing of one copy, and forwarding of all
copies to the payment office.
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
(2) For contracts administered by the
Defense Contract Management Agency,
furnish the contract administration office
copy of the MIRR to the authorized
Government representative for dating and
signing and forwarding to the contract
administration office (see F–401, Table 1).
(3) When acceptance is at destination, no
entry shall be made other than
‘‘CERTIFICATE OF CONFORMANCE.’’
(v) Destination.
(A) When acceptance at origin is indicated
in Block 21a, make no entries in Block 21b.
(B) When CQA and acceptance or
acceptance is at destination, the authorized
Government representative must—
(1) Place an ‘‘X’’ in the appropriate box(es);
(2) Sign and date; and
(3) Enter typed, stamped, or printed name,
title, mailing address, and commercial
telephone number.
(C) When ‘‘ALTERNATIVE RELEASE
PROCEDURE’’ is entered in Block 21a and
acceptance is at destination, the authorized
Government representative must complete
the entries required by paragraph
(b)(21)(v)(B) of this appendix.
(D) Forward the executed payment copy or
MILSCAP format identifier PKN or PKP to
the payment office cited in Block 12 within
four work days (five days when MILSCAP
Format is used) after delivery and acceptance
of the shipment by the receiving activity.
Forward one executed copy of the final DD
Form 250 to the contract administration
office cited in Block 10 for implementing
contract closeout procedures.
(E) When ‘‘FAST PAY’’ is entered in Block
21a, make no entries in this block.
(22) Block 22—Receiver’s use. The
authorized representative of the receiving
activity (Government or contractor) must use
this block to show receipt, quantity, and
condition. The authorized representative
must—
(i) Enter the date the supplies arrived. For
example, when off-loading or in-checking
occurs subsequent to the day of arrival of the
carrier at the installation, the date of the
carrier’s arrival is the date received for
purposes of this block;
(ii) Sign; and
(iii) Enter typed, stamped, or printed name,
title, mailing address, and commercial
telephone number.
(23) Block 23—Contractor use only. Self
explanatory.
F–402 Mode/method of shipment codes.
See paragraph F–302.
F–403 Consolidated shipments.
When individual shipments are held at the
contractor’s plant for authorized
transportation consolidation to a single bill of
lading, the contractor may prepare the DD
Forms 250 at the time of CQA or acceptance
prior to the time of actual shipment (see
Block 3).
F–404 Multiple consignee instructions.
The contractor may prepare one MIRR
when the identical line item(s) of a contract
are to be shipped to more than one
consignee, with the same or varying
quantities, and the shipment requires origin
acceptance. Prepare the MIRR using the
PO 00000
Frm 00044
Fmt 4700
Sfmt 4700
procedures in this appendix with the
following changes:
(a) Blocks 2, 4, 13, and, if applicable, 14—
Enter ‘‘See Attached Distribution List.’’
(b) Block 15—The contractor may group
item numbers for identical stock/part number
and description.
(c) Block 17—Enter the ‘‘total’’ quantity
shipped by line item or, if applicable,
grouped identical line items.
(d) Use the DD Form 250c to list each
individual ‘‘Shipped To’’ and ‘‘Marked For’’
with—
(1) Code(s) and complete shipping address
and a sequential shipment number for each;
(2) Line item number(s);
(3) Quantity;
(4) MIPR number(s), preceded by ‘‘MIPR,’’
or the MILSTRIP requisition number, and
quantity for each when provided in the
contract or shipping instructions; and
(5) If applicable, bill of lading number,
TCN, and mode of shipment code.
(e) The contractor may omit those
distribution list pages of the DD Form 250c
that are not applicable to the consignee.
Provide a complete MIRR for all other
distribution.
F–405 Correction instructions.
Make a new revised MIRR or correct the
original when, because of errors or
omissions, it is necessary to correct the MIRR
after distribution has been made. Use data
identical to that of the original MIRR. Do not
correct MIRRs for Blocks 19 and 20 entries.
Make the corrections as follows—
(a) Circle the error and place the corrected
information in the same block; if space is
limited, enter the corrected information in
Block 16 referencing the error page and
block. Enter omissions in Block 16
referencing omission page and block. For
example—
2. SHIPMENT NO.
17. QUANTITY
SHIP/REC’D
(AAA0001)
See Block 16
__________
19
(17)
__________
16. STOCK/PART NO. DESCRIPTION
CORRECTIONS:
Refer Block 2: Change shipment No.
AAA001 to AAA0010 on all pages of the
MIRR.
Refer Blocks 15, 16, 17, and 18, page 2:
Delete in entirety Line Item No. 0006. This
item was not shipped.
(b) When corrections have been made to
entries for line items (Block 15) or quantity
(Block 17), enter the words ‘‘CORRECTIONS
HAVE BEEN VERIFIED’’ on page 1. The
authorized Government representative will
date and sign immediately below the
statement. This verification statement and
signature are not required for other
corrections.
(c) Clearly mark the pages of the MIRR
requiring correction with the words
‘‘CORRECTED COPY.’’ Avoid obliterating
any other entries. Where corrections are
E:\FR\FM\20SER1.SGM
20SER1
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
made only on continuation sheets, also mark
page number 1 with the words ‘‘CORRECTED
COPY.’’
(d) Page 1 and only those continuation
pages marked ‘‘CORRECTED COPY’’ shall be
distributed to the initial distribution. A
complete MIRR with corrections shall be
distributed to new addressee(s) created by
error corrections.
F–406 Invoice instructions.
(a) Contractors shall submit payment
requests and receiving reports in electronic
form, unless an exception in DFARS
232.7002 applies. Contractor submission of
the material inspection and receiving
information required by this appendix by
using the WAWF electronic form (see
paragraph (b) of the clause at DFARS
252.232–7003) fulfills the requirement for an
MIRR.
(b) If the contracting officer authorizes the
contractor to submit an invoice in paper
form, the Government encourages, but does
not require, the contractor to use the MIRR
as an invoice, in lieu of a commercial form.
If commercial forms are used, identify the
related MIRR shipment number(s) on the
form. If using the MIRR as an invoice,
prepare the MIRR and forward the required
number of copies to the payment office as
follows:
(1) Complete Blocks 5, 6, 19, and 20. Block
6 shall contain the invoice number and date.
Column 20 shall be totaled.
(2) Mark in letters approximately one inch
high, first copy: ‘‘ORIGINAL INVOICE,’’ for
all invoice submissions; and three copies:
‘‘INVOICE COPY,’’ when the payment office
requires four copies. Questions regarding the
appropriate number of copies (i.e., one or
four) should be directed to the applicable
payment office.
(3) Forward the appropriate number of
copies to the payment office (Block 12
address), except when acceptance is at
destination and a Navy finance office will
make payment, forward to destination.
(4) Separate the copies of the MIRR used
as an invoice from the copies of the MIRR
used as a receiving report.
F–407 Packing list instructions.
Contractors may use copies of the MIRR as
a packing list. The packing list copies are in
addition to the copies of the MIRR required
for standard distribution (see F–501). Mark
them ‘‘PACKING LIST.’’
F–408 Receiving instructions.
When the MIRR is used for receiving
purposes, local directives shall prescribe
procedures. If CQA and acceptance or
acceptance of supplies is required upon
arrival at destination, see F–401(b)(21)(v) for
instructions.
PART 5—Distribution of Wide Area
Workflow Receiving Report (WAWF RR), DD
Form 250 and DD Form 250C
F–501 Distribution of WAWF RR.
Use of the WAWF electronic form satisfies
the distribution requirements of this section,
58133
except for the copies required to accompany
shipment.
F-502 Distribution of DD FORM 250 AND
DD FORM 250C.
(a) The contractor is responsible for
distributing the DD Form 250, Material
Inspection and Receiving Report (MIRR)
including mailing and payment of postage.
(b) Contractors shall distribute MIRRs
using the instructions in Tables 1 and 2.
(c) Contractors shall distribute MIRRs on
non-DoD contracts using this appendix as
amended by the contract.
(d) Contractors shall make distribution
promptly, but no later than the close of
business of the work day following—
(1) Signing of the DD Form 250 (Block 21a)
by the authorized Government
representative; or
(2) Shipment when authorized under terms
of alternative release, certificate of
conformance, or fast pay procedures; or
(3) Shipment when CQA and acceptance
are to be performed at destination.
(e) Do not send the consignee copies (via
mail) on overseas shipments to port of
embarkation (POE). Send them to consignee
at APO/FPO address.
(f) Copies of the MIRR forwarded to a
location for more than one recipient shall
clearly identify each recipient.
Material Inspection And Receiving Report
TABLE 1—STANDARD DISTRIBUTION
With Shipment* ........................................................................................................................................................................................
Consignee (via mail) ................................................................................................................................................................................
(For Navy procurement, include unit price)
(For foreign military sales, consignee copies are not required)
Contract Administration Office (CAO) .....................................................................................................................................................
(Forward direct to address in Block 10 except when addressee is a Defense Contract Management Agency (DCMA) office
and a certificate of conformance or the alternative release procedures (see F–301, Block 21) is involved, and acceptance is
at origin; then, forward through the authorized Government representative.)
Purchasing Office
Payment Office ** .....................................................................................................................................................................................
(Forward direct to address in Block 12 except—
(i) When address in Block 10 is a DCMA office and payment office in Block 12 is the Defense Finance and Accounting
Service, Columbus Center, do not make distribution to the Block 12 addressee;
(ii) When address in Block 12 is the Defense Finance and Accounting Service, Columbus Center/Albuquerque Office
(DFAS–CO/ALQ), Kirtland AFB, NM, attach only one copy to the required number of copies of the contractor’s invoice;
(iii) When acceptance is at destination and a Navy finance office will make payment, forward to destination; and
(iv) When a certificate of conformance or the alternative release procedures (see F–301, Block 21) are involved and acceptance is at origin, forward the copies through the authorized Government representative.
ADP Point for CAO (applicable to Air Force only) ..................................................................................................................................
(When DFAS–CO/ALQ is the payment office in Block 12, send one copy to DFAS–CO/ALQ immediately after signature. If
submission of delivery data is made electronically, distribution of this hard copy need not be made to DFAS–CO/ALQ.)
CAO of Contractor Receiving GFP .........................................................................................................................................................
(For items fabricated or acquired for the Government and shipped to a contractor as Government furnished property, send
one copy directly to the CAO cognizant of the receiving contractor, ATTN: Property Administrator (see DoD 4105.59–H).)
2
1
1
1
2
1
1
sroberts on DSK5SPTVN1PROD with RULES
* Attach as follows:
** Payment by Defense Finance and Accounting Service, Columbus Center will be based on the source acceptance copies of DD Forms 250
forwarded to the contract administration office.
Type of shipment
Location
Carload or truckload .................................................................................
Affix to the shipment where it will be readily visible and available upon
receipt.
Affix to container number one or container truckload bearing lowest
number.
Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.
Less than carload or truckload .................................................................
Mail, including parcel post ........................................................................
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
PO 00000
Frm 00045
Fmt 4700
Sfmt 4700
E:\FR\FM\20SER1.SGM
20SER1
58134
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
Type of shipment
Location
Pipeline, tank car, or railroad cars for coal movements ..........................
Forward with consignee copies.
MATERIAL INSPECTION AND RECEIVING REPORT TABLE 2—SPECIAL DISTRIBUTION
Number of
copies
As required
Address
Each: Navy Status Control Activity, Army, Air Force, DLA Inventory Control Manager.
Quality Assurance Representative ...........................................
Address specified in contract ...................................................
*1
Address specified by the assigned quality assurance representative.
CAO address unless otherwise specified in the contract ........
1
Transportation Office issuing GBL (attach to GBL memorandum copy).
Purchasing Office other than office issuing contract ................
Foreign Military Sales Representative ......................................
Military Assistance Advisory Group (Grant Aid shipments) .....
Army Foreign Military Sales .....................................................
Air Force On shipments of new production of aircraft and
missiles, class 1410 missiles, 1510 aircraft (fixed wing, all
types), 1520 aircraft (rotary wing), 1540 gliders, 1550 target
drones.
When above items are delivered to aircraft modification centers.
Foreign Military Sales/Military Assistance Program (Grant
Aid) shipments to Canada.
Other than Canada ...................................................................
When consignee is an Air National Guard Activity ..................
Navy
Navy Foreign Military Sales ......................................................
When typed code (TC) 2T or 7T is shown in Block 16, or
when shipment is consigned to another contractor’s plant
for a Government representative or when Block 16 indicates shipment includes GFP.
Bulk Petroleum Shipments .......................................................
1
Address specified in the contract .............................................
Address specified in the contract .............................................
U.S. Military Advisory Group, Military Attache, Mission, or
other designated agency address as specified in the contract.
Commander, U.S. Army Security Assistance Command,
ATTN: AMSAC–OL, 54 ‘‘M’’ Avenue, Suite 1, New Cumberland, PA 17070–5096.
HQ Air Force Materiel Command, LGX–AVDO, Area A,
Building 262, Room N142, 4375 Chidlaw Road, WrightPatterson AFB, OH 45433–5006.
1
8
1
DCMA .......................................................................................
1
National Defence Headquarters, Ottawa, Ontario Canada,
K1A OK4 ATTN: DPSUPS3.
Address in the contract ............................................................
Consignee address (Block 13), ATTN: Property Officer .........
1
Naval Inventory Control Point Deputy Commander for International Programs (NAVICP Code P761), 700 Robbins Avenue, Philadelphia, PA 19111–5095.
Naval Inventory Control Point (Code 0142) for aviation type
material, 700 Robbins Avenue, Philadelphia, PA 19111–
5098 and.
Naval Inventory Control Point (Code 0143) for all other material 5450 Carlisle Pike, PO Box 2020, Mechanicsburg, PA
17055–0788.
Cognizant Defense Fuel Region (see Table 4) .......................
1
1
1
3
2
2
1
sroberts on DSK5SPTVN1PROD with RULES
* Each addressee.
Part 6—Preparation of the DD Form 250–1
(Loading Report)
F–601 Instructions.
Prepare the DD Form 250–1 using the
following instructions when applied to a
tanker or barge cargo lifting. If space is
limited, use abbreviations. The block
numbers correspond to those on the form.
(a) Block 1—Tanker/barge. Line out
‘‘TANKER’’ or ‘‘BARGE’’ as appropriate and
place an ‘‘X’’ to indicate loading report.
(b) Block 2—Inspection office. Enter the
name and location of the Government office
conducting the inspection.
(c) Block 3—Report No. Number each form
consecutively, starting with number 1, to
correspond to the number of shipments made
against the contract. If shipment is made
from more than one location against the same
contract, use this numbering system at each
location.
(d) Block 4—Agency placing order on
shipper, city, state and/or local address
(loading). Enter the applicable Government
activity.
(e) Block 5—Department. Enter military
department owning product being shipped.
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
(f) Block 6—Prime contract or P.O. No.
Enter the contract or purchase order number.
(g) Block 7—Name of prime contractor,
city, state and/or local address (loading).
Enter the name and address of the contractor
as shown in the contract.
(h) Block 8—Storage contract. Enter storage
contract number if applicable.
(i) Block 9—Terminal or refinery shipped
from, city, state and/or local address. Enter
the name and location of the contractor
facility from which shipment is made. Also
enter delivery point in this space as either
‘‘FOB Origin’’ or ‘‘FOB Destination.’’
(j) Block 10—Order No. on supplier. Enter
number of the delivery order, purchase order,
subcontract or suborder placed on the
supplier.
(k) Block 11—Shipped to: (receiving
activity, city, state and/or local address).
Enter the name and geographical address of
the consignee as shown on the shipping
order.
(l) Block 12—B/L number. If applicable,
enter the initials and number of the bill of
lading. If a commercial bill of lading is later
PO 00000
Frm 00046
Fmt 4700
Sfmt 4700
authorized to be converted to a Government
bill of lading, show ‘‘Com. B/L to GB/L.’’
(m) Block 13—Reqn. or request No. Enter
number and date from the shipping
instructions.
(n) Block 14—Cargo No. Enter the cargo
number furnished by the ordering office.
(o) Block 15—Vessel. Enter the name of
tanker or barge.
(p) Block 16—Draft arrival. Enter the
vessel’s draft on arrival.
(q) Block 17—Draft sailing. Enter the
vessel’s draft on completion of loading.
(r) Block 18—Previous two cargoes. Enter
the type of product constituting previous two
cargoes.
(s) Block 19—Prior inspection. Leave
blank.
(t) Block 20—Condition of shore pipeline.
Enter condition of line (full or empty) before
and after loading.
(u) Block 21—Appropriation (loading).
Enter the appropriation number shown on
the contract, purchase order or distribution
plan. If the shipment is made from
departmentally owned stock, show ‘‘Army,
E:\FR\FM\20SER1.SGM
20SER1
sroberts on DSK5SPTVN1PROD with RULES
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
Navy, or Air Force (as appropriate) owned
stock.’’
(v) Block 22—Contract item no. Enter the
contract item number applicable to the
shipment.
(w) Block 23—Product. Enter the product
nomenclature and grade as shown in the
contract or specification, the stock or class
number, and the NATO symbol.
(x) Block 24—Specifications. Enter the
specification and amendment number shown
in the contract.
(y) Block 25—Statement of quantity. Enter
in the ‘‘LOADED’’ column, the net barrels,
net gallons, and long tons for the cargo
loaded. NOTE: If more than 1⁄2 of 1 percent
difference exists between the ship and shore
quantity figures, the contractor shall
immediately investigate to determine the
cause of the difference. If necessary, prepare
corrected documents; otherwise, put a
statement in Block 28 as to the probable or
actual cause of the difference.
(z) Block 26—Statement of quality.
(1) Under the heading ‘‘TESTS’’ list all
inspection acceptance tests of the
specification and any other quality
requirements of the contract.
(2) Under the heading ‘‘SPECIFICATION
LIMITS’’ list the limits or requirements as
stated in the specification or contract directly
opposite each entry in the ‘‘TESTS’’ column.
List waivers to technical requirements.
(3) Under the heading ‘‘TEST RESULTS’’
list the test results applicable to the storage
tank or tanks from which the cargo was
lifted. If more than one storage tank is
involved, list the tests applicable to each tank
in separate columns headed by the tank
number, the date the product in the tank was
approved, and the quantity loaded from the
tank. Each column shall also list such
product characteristics as amount and type of
corrosion inhibitor, etc.
(aa) Block 27—Time statement. Line out
‘‘DISCHARGE’’ and ‘‘DISCHARGING.’’
Complete all applicable entries of the time
statement using local time. Take these dates
and times from either the vessel or shore
facility log. The Government representative
shall ensure that the logs are in agreement on
those entries used. If the vessel and shore
facility logs are not in agreement, the
Government representative will explain the
reasons in Block 28—REMARKS. Do not
enter the date and time the vessel left berth
on documents placed aboard the vessel. The
date and time shall appear on all other
copies. Express all dates in sequence of day,
month, and year with the month spelled out
or abbreviated (e.g., 10 Sept. 67). The term
FINISHED BALLAST DISCHARGE is meant
to include all times needed to complete
deballasting and mopping/drying of ship’s
tanks. The inspection of ship’s tanks for
loading is normally performed immediately
upon completion of drying tanks.
(bb) Block 28—Remarks. Use this space for
reporting:
(1) All delays, their cause and responsible
party (vessel, shore facility, Government
representative, or other).
(2) Details of loading abnormalities such as
product losses due to overflow, leaks,
delivery of product from low level in shore
tanks, etc.
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
(3) In the case of multiple consignees, enter
each consignee, the amount consigned to
each, and if applicable, the storage contract
numbers appearing on the delivery order.
(4) When product title is vested in the U.S.
Government, insert in capital letters ‘‘U.S.
GOVERNMENT OWNED CARGO.’’ If title to
the product remains with the contractor and
inspection is performed at source with
acceptance at destination, insert in capital
letters ‘‘CONTRACTOR OWNED CARGO.’’
(5) Seal numbers and location of seals. If
space is not adequate, place this information
on the ullage report or an attached
supplemental sheet.
(cc) Block 29—Company or receiving
terminal. Line out ‘‘OR RECEIVING
TERMINAL’’ and get the signature of the
supplier’s representative.
(dd) Block 30—Certification by government
representative. Line out ‘‘discharged.’’ The
Government representative shall date and
sign the form to certify inspection and
acceptance, as applicable, by the
Government. The name of the individual
signing this certification, as well as the
names applied in Blocks 29 and 31, shall be
typed or hand lettered. The signature in
Block 30 must agree with the typed or
lettered name to be acceptable to the paying
office.
(ee) Block 31—Certification by master or
agent. Obtain the signature of the master of
the vessel or its agent.
Part 7—Preparation of the DD Form 250–1
(Discharge Report)
F–701 Instructions.
Prepare the DD Form 250–1 using the
following instructions when applied to a
tanker or barge discharge. If space is limited,
use abbreviations. The block numbers
correspond to those on the form.
(a) Block 1—Tanker/barge. Line out
‘‘TANKER’’ or ‘‘BARGE’’ as applicable and
place an ‘‘X’’ to enter discharge report.
(b) Block 2—Inspection office. Enter
Government activity performing inspection
on the cargo received.
(c) Block 3—Report No. Leave blank.
(d) Block 4—Agency placing order on
shipper, city, state and/or local address
(loading). Enter Government agency shown
on loading report.
(e) Block 5—Department. Enter Department
owning product being received.
(f) Block 6—Prime contract or P.O. No.
Enter the contract or purchase order number
shown on the loading report.
(g) Block 7—Name of prime contractor,
city, state and/or local address (loading).
Enter the name and location of contractor
who loaded the cargo.
(h) Block 8—Storage contract. Enter the
number of the contract under which material
is placed in commercial storage where
applicable.
(i) Block 9—Terminal or refinery shipped
from, city, state and/or local address. Enter
source of cargo.
(j) Block 10—Order No. on supplier. Make
same entry appearing on loading report.
(k) Block 11—Shipped to: (RECEIVING
ACTIVITY, CITY, STATE AND/OR LOCAL
ADDRESS). Enter receiving activity’s name
and location.
PO 00000
Frm 00047
Fmt 4700
Sfmt 4700
58135
(l) Block 12—B/L number. Enter as appears
on loading report.
(m) Block 13—Reqn. or request No. Leave
blank.
(n) Block 14—Cargo No. Enter cargo
number shown on loading report.
(o) Block 15—Vessel. Enter name of tanker
or barge discharging cargo.
(p) Block 16—Draft arrival. Enter draft of
vessel upon arrival at dock.
(q) Block 17—Draft sailing. Enter draft of
vessel after discharging.
(r) Block 18—Previous two cargoes. Leave
blank.
(s) Block 19—Prior inspection. Enter the
name and location of the Government office
which inspected the cargo loading.
(t) Block 20—Condition of shore pipeline.
Enter condition of line (full or empty) before
and after discharging.
(u) Block 21—Appropriation (loading).
Leave blank.
(v) Block 22—Contract item No. Enter the
item number shown on the loading report.
(w) Block 23—Product. Enter information
appearing in Block 23 of the loading report.
(x) Block 24—Specifications. Enter
information appearing in Block 24 of the
loading report.
(y) Block 25—Statement of quantity. Enter
applicable data in proper columns.
(1) Take ‘‘LOADED’’ figures from the
loading report.
(2) Determine quantities discharged from
shore tank gauges at destination.
(3) If a grade of product is discharged at
more than one point, calculate the loss or
gain for that product by the final discharge
point.
Report amounts previously discharged on
discharge reports prepared by the previous
discharge points. Transmit volume figures by
routine message to the final discharge point
in advance of mailed documents to expedite
the loss or gain calculation and provide
proration data when more than one
department is involved.
(4) The loss or gain percentage shall be
entered in the ‘‘PERCENT’’ column followed
by ‘‘LOSS’’ or ‘‘GAIN,’’ as applicable.
(5) On destination acceptance shipments,
accomplish the ‘‘DISCHARGED’’ column
only, unless instructed to the contrary.
(z) Block 26—Statement of quality.
(1) Under the heading ‘‘TESTS’’ enter the
verification tests performed on the cargo
preparatory to discharge.
(2) Under ‘‘SPECIFICATION LIMITS’’ enter
the limits, including authorized departures
(if any) appearing on the loading report, for
the tests performed.
(3) Enter the results of tests performed
under the heading ‘‘TEST RESULTS.’’
(aa) Block 27—Time statement. Line out
‘‘LOAD’’ and ‘‘LOADING.’’ Complete all
applicable entries of the time statement using
local time. Take the dates and times from
either the vessel or shore facility log. The
Government representative shall ensure that
these logs are in agreement with entries used.
If the vessel and shore facility logs are not
in agreement, the Government representative
will explain the reason(s) in Block 28—
REMARKS. Do not enter the date and time
the vessel left berth on documents placed
aboard the vessel. The date and time shall
E:\FR\FM\20SER1.SGM
20SER1
58136
Federal Register / Vol. 76, No. 182 / Tuesday, September 20, 2011 / Rules and Regulations
appear on all other copies. Express all dates
in sequence of day, month, and year with the
month spelled out or abbreviated (e.g., 10
Sept. 67).
(bb) Block 28—Remarks. Use this space for
reporting important facts such as:
(1) Delays, their cause, and responsible
party (vessel, shore facility, Government
representative, or others).
(2) Abnormal individual losses
contributing to the total loss. Enter the cause
of such losses as well as actual or estimated
volumes involved. Such losses shall include,
but not be restricted to, product remaining
aboard (enter tanks in which contained),
spillages, line breaks, etc. Note where gravity
group change of receiving tank contents
results in a fictitious loss or gain. Note
irregularities observed on comparing vessel
ullages obtained at loading point with those
at the discharge point if they indicate an
abnormal transportation loss or
contamination.
(cc) Block 29—Company or receiving
terminal. Line out ‘‘COMPANY OR.’’ Secure
the signature of a representative of the
receiving terminal.
(dd) Block 30—Certification by government
representative. Line out ‘‘loaded.’’ The
Government representative shall date and
sign the form to certify inspection and
acceptance, as applicable, by the
Government. The name of the individual
signing the certification as well as the names
applied in Blocks 29 and 31 shall be typed
or hand lettered on the master or all copies
of the form. The signature in Block 30 must
agree with the typed or lettered name to be
acceptable to the paying office.
(ee) Block 31—Certification by master or
agent. Obtain the signature of the master of
the vessel or the vessel’s agent.
Part 8—Distribution of the DD Form 250–1
F–801 Distribution.
Follow the procedures at PGI F–801 for
distribution of DD Form 250–1.
F–802 Corrected DD Form 250–1.
Follow the procedures at PGI F–802 when
corrections to DD Form 250–1 are needed.
[FR Doc. 2011–23958 Filed 9–19–11; 8:45 am]
BILLING CODE 5001–08–P
DEPARTMENT OF DEFENSE
Defense Acquisition Regulations
System
48 CFR Part 201
sroberts on DSK5SPTVN1PROD with RULES
RIN 0750–AH35
Defense Federal Acquisition
Regulation Supplement; Designation
of a Contracting Officer’s
Representative (DFARS Case 2011–
D037)
Defense Acquisition
Regulations System; Department of
Defense (DoD).
ACTION: Final rule.
AGENCY:
VerDate Mar<15>2010
16:50 Sep 19, 2011
Jkt 223001
DoD is issuing a final rule
amending the Defense Federal
Acquisition Regulation Supplement
(DFARS) to clarify that a contracting
officer’s representative must be an
employee, military or civilian, of the
U.S. Government, a foreign government,
or a North Atlantic Treaty Organization
(NATO)/coalition partner, and that
contractor personnel shall not serve as
contracting officer’s representatives.
DATES: Effective date: September 20,
2011.
FOR FURTHER INFORMATION CONTACT: Mr.
Manuel Quinones, telephone 703–602–
8383.
SUPPLEMENTARY INFORMATION:
SUMMARY:
I. Background
This rule is based on a request from
Headquarters NATO Training Mission—
Afghanistan (NTM–A) to permit the
designation of non-U.S. Government
employees as contracting officer’s
representatives (CORs) in support of the
NTM–A’s efforts to train the Afghan
National Security Force (ANSF). The
NTM–A supports the growth of the
ANSF through numerous activities
including the contracting of civilian
mentoring services. These contracts for
mentoring services to the ANSF require
the contractor to deploy teams
throughout the joint area of operations
and interact with non-U.S. coalition
partners exclusively. To provide
assurance that contractual requirements
are being met, it is crucial that contract
performance information be submitted
to the contracting officer by those
coalition units with insight of contractor
activities.
Contracting officers supporting
contingency operations abroad require
the flexibility to ensure the proper
oversight of contract performance, such
as at locations where there is no U.S.
presence or the designation of a U.S.
Government COR is not viable. This rule
provides that flexibility by clarifying at
DFARS 201.602–2 that a COR must be
an employee, military or civilian, of the
U.S. Government, a foreign government,
or a NATO/coalition partner. CORs
must meet all training and experience
qualifications commensurate with the
delegated responsibilities per DFARS
201.602–2(2)(ii). In addition, the rule
makes clear that contractor personnel
may not serve as CORs. Contractor
personnel may, however, continue to
perform technical oversight functions
on behalf of the contracting officer,
excluding those that are inherently
governmental (see FAR 7.5).
DoD has issued this rule as a final rule
because this rule does not have a
significant effect beyond the internal
PO 00000
Frm 00048
Fmt 4700
Sfmt 4700
operating procedures of DoD and does
not have a significant cost or
administrative impact on contractors or
offerors. Therefore, public comment is
not required in accordance with 41
US.C. 1707.
II. Executive Orders 12866 and 13563
Executive Orders 12866 and 13563
direct agencies to assess all costs and
benefits of available regulatory
alternatives and, if regulation is
necessary, to select regulatory
approaches that maximize net benefits
(including potential economic,
environmental, public health and safety
effects, distributive impacts, and
equity). Executive Order 13563
emphasizes the importance of
quantifying both costs and benefits, of
reducing costs, of harmonizing rules,
and of promoting flexibility. This is not
a significant regulatory action and,
therefore, was not subject to review
under Section 6(b) of Executive Order
12866, Regulatory Planning and Review,
dated September 30, 1993. This rule is
not a major rule under 5 U.S.C. 804.
III. Regulatory Flexibility Act
The Regulatory Flexibility Act does
not apply to this rule. This final rule
does not constitute a significant DFARS
revision within the meaning of FAR
1.501, and public comment is not
required in accordance with 41. U.S.C.
1707.
IV. Paperwork Reduction Act
The final rule does not contain any
information collection requirements that
require the approval of the Office of
Management and Budget under
Paperwork Reduction Act (44 U.S.C.
chapter 35).
List of Subjects in 48 CFR Part 201
Government Procurement.
Mary Overstreet,
Editor, Defense Acquisition Regulations
System.
Therefore, 48 CFR part 201 is
amended as follows:
PART 201—FEDERAL ACQUISITION
REGULATIONS SYSTEM
1. The authority citation for 48 CFR
part 201 continues to read as follows:
■
Authority: 41 U.S.C. 1303 and 48 CFR
chapter 1.
2. Section 201.602–2 is amended to
revise paragraph (2)(i) to read as
follows:
■
201.602–2
*
Responsibilities.
*
*
(2) * * *
E:\FR\FM\20SER1.SGM
20SER1
*
*
Agencies
[Federal Register Volume 76, Number 182 (Tuesday, September 20, 2011)]
[Unknown Section]
[Pages 58122-58136]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23958]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Defense Acquisition Regulations System
48 CFR Chapter 2
Defense Federal Acquisition Regulation Supplement; Material
Inspection and Receiving Report (DFARS Case 2009-D023)
AGENCY: Defense Acquisition Regulations System, Department of Defense
(DoD).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: DoD is issuing a final rule amending the Defense Federal
Acquisition Regulation Supplement (DFARS), Appendix F, Material
Inspection and Receiving Report, to incorporate new procedures for
using the electronic Wide Area WorkFlow (WAWF) Receiving Report.
DATES: Effective date: September 20, 2011.
FOR FURTHER INFORMATION CONTACT: Mr. Julian Thrash, telephone 703-602-
0310.
SUPPLEMENTARY INFORMATION:
I. Background
DoD published a proposed rule in the Federal Register (75 FR 56961)
on September 17, 2010, to amend DFARS Appendix F, Material Inspection
and Receiving Report, to provide new coverage on the use, preparation,
and distribution of the electronic WAWF receiving report, which is the
primary method for documenting acceptance of supplies and services and
for electronic invoicing. The rule also addressed WAWF capability to
provide the following:
Item Unique Identification (IUID). When the clause at
DFARS 252.211-7003, Item Identification and Valuation, is used in the
contract and requires reporting of IUID data, WAWF captures the IUID
data and forwards the data to the IUID registry after acceptance. WAWF
may be used to report Unique Item Identifiers (UIIs) at the line item
level and also UIIs embedded at the line item level.
Radio Frequency Identification (RFID). When the clause at
DFARS 252.211-7006, Radio Frequency Identification, is used in the
contract, WAWF will capture the RFID information and forward the data
to the receiving location.
Using WAWF is the only way a contractor can comply with the clause
to furnish RFID data via an Advance Shipping Notice. Insertion of the
new WAWF coverage into Appendix F necessitates relocating and
renumbering existing coverage for use, preparation, and distribution of
the DD Form 250 Material Inspection and Receiving Report, and the DD
Form 250-1 Tanker/Barge Material Inspection and Receiving Report.
II. Discussion and Analysis
In response to the proposed rule, DoD received comments from five
respondents. A discussion of the comments follows.
A. Revise F-103, WAWF RR and DD Form 250
Comment: Two respondents suggested changing the text at F-103(b)(2)
for the transfer of Government property using the property transfer
function. Another respondent recommended adding where training for the
preparation of document types is available.
Response: These recommendations are incorporated into the final
rule.
B. Limitation on the Quantity of Embedded Items in WAWF
Comment: A respondent asked if there was a limit on the quantity of
embedded items at the line item level that may be reported in WAWF.
Response: A quantity limit of 100 embedded items currently exists
in the software capability, however, this limit
[[Page 58123]]
is subject to change in future versions of WAWF.
C. F-103(e)(2), Radio Frequency Identification (RFID)
Comment: A respondent suggested adding clarification on the use of
RFID information.
Response: As suggested, paragraph F-103(e)(2) is revised to clarify
that the RFID information can be added either at submission or via the
``WAWF Pack Later'' functionality.
D. F-104, Application
Comment: A respondent asked about the meaning of ``consigned to''
at F-104(a)(4) and for clarification regarding use of a continuation
sheet. The respondent stated that they have no control over how the
continuation sheet appears or prints from WAWF.
Response: The phrase ``consigned to'' is the one to whom a line
item is given, transferred, or delivered for control. In regard to use
of a continuation sheet, the format printed out from WAWF will suffice
as long as the required contractor information is entered.
E. F-301, Preparation Instructions--General Comments
Comment: Two respondents suggested, at paragraph F-301(a)(1),
replacing ``contractor'' with ``vendor'' to be consistent with the
label used on the training Web site provided in the proposed rule. A
respondent suggested: (1) Revising F-301(a)(2) to reflect the creation
of an extension to the prime Commercial and Government Entity (CAGE);
(2) replacing, at paragraph F-301(a)(4), ``official DoD sites'' with
``DoD definitive sources''; (3). adding text at paragraph F-
301(b)(1)(iii) to clarify that comments in the miscellaneous
information tab will appear in the comments section of the printed WAWF
receiving report; (4). changing, at paragraph F-301(b)(1)(iv), ``DoD
contract number'' to ``DoD contract number and delivery order number'';
and, (5) updating paragraph F-301(b)(3) to correctly refer to the data
field as ``Estimated'' and reflect that data entry is a drop-down box.
Response: The final rule is revised to incorporate these
recommendations.
F. Inclusion of Shipping Documents
Comment: A respondent requested at paragraph F-301(b)(2)(i),
SHIPMENT NO., that contractors must always provide packaging
documentation in their shipment containers. If contractors choose to
provide their own packaging documentation they must ensure their
documentation includes their shipment number data. The respondent
recommended the addition of a statement that any document utilized as a
packing list must include the shipment number information.
Additionally, the respondent suggested revising the text with an
example to clarify that the shipment number format requires first three
data positions to be alpha, fourth position alpha-numeric and last
three positions are numeric e.g., DFAR001 or DAR0001.
Response: The recommendations are incorporated into the final rule.
Comment: A respondent requested at paragraph F-301(b)(3), Date
Shipped, that a ``MIRR clause does not identify electronic data
submission timeline.'' The respondent recommended the DFARS MIRR
language include the statement that the contractor will submit the
completed MIRR via WAWF within one business day of material shipment.
The respondent stated that material shipments missing shipment numbered
data causes manual research in order to process the receipt acceptance.
Response: The MIRR is completed at the time of delivery of goods or
services and, for both WAWF and paper DD form 250s, copies of the MIRR
accompany the shipment. Paragraph F-301(b)(3) is revised to add a
reference to ``see F-303).''
Comment: A respondent requested at paragraph F-305, Invoice
instructions, adding a statement that contractors should ensure the
packaging documentation includes a Government signed receiving report
when the contract requires origin inspection and acceptance. The
respondent further stated that contractors must include the signed
document indicating material receipt acceptance has occurred in the
container with the exception of material shipments that are approved
for Alternate Release Procedures.
Response: The final rule is revised to incorporate the
recommendations.
G. F-301(b)(4)--Bill of Lading Information
Comment: A respondent stated, at paragraph F-301(b)(4)(i), that
bills of lading are obtained when an item is being scheduled to ship,
and thus may not be available until after the item has been source
inspected/accepted. The respondent recommended clearly stating that the
field is not required prior to source inspection and acceptance, nor,
in their opinion, should a receiving report correction be issued only
for adding a bill of lading after it has been obtained. Further, the
respondent suggested revising F-301(b)(4), to enter the commercial or
Government bill of lading number after ``BL.''
Response: Currently, the ``Bill of Lading Number'' field is not a
mandatory field in WAWF. Additional changes to the Bill of Lading
functionality may be made later on.
H. Line Haul Information Changes
Comment: One respondent suggested at paragraph F-301(b)(5), Line
Haul Mode, that this is an item that may not be stated accurately until
after signature, when the item is scheduled for shipment, and
recommended that this field not be required prior to source inspection/
acceptance.
Response: There is flexibility in WAWF regarding this entry as
``Line Haul Mode'' field is not a mandatory field.
I. Allow for WAWF Acceptance at ``Other'' Using Code ``D''
Comment: Two respondents suggested that paragraph F-301(b)(6),
Inspection and Acceptance Point, be changed from ``WAWF allows
acceptance at Other'' to ``WAWF allows acceptance at Other (O).'' Two
respondents suggested adding, that for purposes of conforming to
contract, ``0'' is equivalent to ``D''.
Response: The final rule is revised to incorporate the
recommendations.
J. Marked for Codes
Comment: A respondent suggested at paragraphs F-301(b)(7), Prime
Contractor/Code, F-301(b)(9), Shipped From/Code, and F-301(b)(11),
Payment Will Be Made By/Code, that these codes must match the contract,
however, the street address is not required to match the contract. The
respondents further opined that WAWF does not require the entry of an
address code in either WAWF 4.2 or 5.0, and concluded that the
requirement of an address should be clarified.
Response: No clarification is needed in the rule. Contractors can
fulfill contracts with shipments from their location or from
subsidiaries or subcontractors. Therefore, the shipped from code
doesn't necessarily need to match the contract. Further, the receiving
report is used for services as well as supplies where there will be no
ship-from code.
Comment: One respondent requested clarification at paragraph F-
301(b)(13), Marked For/Code, concerning the ``Marked For Address.''
Previously, textual marking information associated with the ``Marked
For DoDAAC'' was placed in the address lines of the ``Marked For
DoDAAC.'' Now that DoD is moving away from paper documents, the
respondent wanted confirmation to
[[Page 58124]]
use the data fields as labeled using the code area for the ``Marked For
DoDAAC'' and address only, and the ``Mark For Rep'' and ``Mark For
Secondary'' fields used for the text information.
Response: The respondent is correct concerning use of these fields.
No change to the rule is required.
K. Marked for Codes
Comment: A respondent requested revisions at paragraph F-301(b)(13)
to reflect that a ``Marked For Code'' cannot be a CAGE code, only a
DoDAAC or Military Assistance Program Address Codes.
Response: No revision is required in response to this comment since
a CAGE code can be entered in the ``Mark For Code'' field.
L. National Stock Number Entry Requirements
Comment: A respondent recommended at paragraph F-301(b)(15)(1)(A)
clarifying that in the ``Type'' drop-down field, that the user is to
select the corresponding type for the data entered, and that if no
National Stock Number or other valid ``Type'' is available, the word
``None'' may be entered for the Stock/Part Number, with a corresponding
``Type'' of any value other than the National Stock Number selected
from the drop-down box. Another respondent stated that if the contract
contains NSNs as well as other identification (e.g., part numbers), a
contractor should place the NSN information in the Stock Part Number
field and the remaining numbers in the line item description field.
Response: The paragraph is revised accordingly to incorporate the
first recommendation. In regards to the second comment concerning NSNs
as well as other identifying information, the respondent is correct in
how this process works. The text is revised to ensure this meaning is
understood.
M. The ``Description'' Field Length and Use
Comment: A respondent asked whether or not at paragraph F-
301(b)(15)(ii), if exceeding 20 characters in the description field is
a cause for the rejection of a receiving report. Further, the
respondent requested clarification on whether or not the description
refers to what is defined in the payment system as a ``service'' line
item as opposed to a ``supply'' line item. A WAWF RR for a repair is
for acceptance of the repair and not of the item repaired. However,
repair line items are frequently defined as ``supply'' line items and
therefore the ship-to location is the actual ship-to of the repaired
item.
Response: Exceeding 20 characters in the description is not a cause
for rejection of a receiving report. In response to the second comment,
the respondent is correct that the description refers to the
designation in the payment system as a ``service'' line item as opposed
to a ``supply'' line item.
N. GFP Drop-Down Box
Comment: A respondent suggested that clarification at paragraph F-
301(b)(15)(iv)(E) is required for how the text relates to the GFE drop-
down box, and whether or not the drop-down box is insufficient for this
situation. The correct use of GFE drop-down box needs to be fully
explained. If it is not the same as the entry of ``GFP'' in the
description text, the differences must be clarified.
Response: The drop-down GFE box is not related to this section. It
is obsolete and no longer used and will be deleted in a future version
of WAWF. The GFP drop-down box is sufficient for use of GFP.
O. F-301--General Comments Regarding Unit Price
Comment: Two respondents stated that at paragraph F-301(b)(18), the
proposed text is identical to that used in the current Appendix F for
unit price (see F-301, block 19, on current Appendix F). They further
stated that this document will never be used as an invoice; thus, in
their opinion, there should not be a requirement to fill in a unit
price, except in the cases listed. Further, one respondent recommended
at paragraph F-301(b)(18)(i) the addition of the text to clarify the
handling of unit prices and property transfer. Another respondent had a
concern with unit prices that were as little as twenty cents and not
being accepted by the Government agency. This respondent also noted
that an estimated price can be entered in the description field, but
the Government contracting office expects the price entered in the
price field, even though WAWF does not accept the entry the way the
agency had requested. The respondent went on to state that the DFARS
does not address the electronic aspect of WAWF and billing.
Response: The unit price is required. In regard to the intent of
the paragraph on the WAWF initiated property transfer, the purpose is
to alert the contractor that a property transfer will be generated as a
result of the completion of the WAWF RR. In regard to the unit price,
it is required when the clause at DFARS 252.211-7003, Item
Identification and Valuation, is used; otherwise the use of the field
is optional and at the discretion of the vendor. When used for item
unique identification, the unit price does not necessarily reflect the
billing price on the contract. The DFARS addresses electronic billing
at 252.232.7003, Electronic Submission of Payment Requests and
Receiving Reports. No change in the rule is required in response to
these comments.
P. F-301--General Comments Regarding Contract Quality Assurance
Comment: One respondent suggested at paragraph F-301(b)(20)(ii),
that the term ``execute'' is misleading and will cause confusion. The
respondent also stated that removing the quotation marks will ensure a
clear direction. The respondent further suggested at paragraphs F-
301(b)(20)(iv)(A)(3) and (v) the steps described should match the
actual step taken in WAWF to electronically sign the document and
recommended the text be revised.
Response: The quotation marks used for the term ``execute'' are
removed. In regard to the electronic signatures, the text has been
revised accordingly to match the actual steps taken in WAWF.
Q. Comment Regarding F-301(b)(21)
Comment: One respondent suggested paragraph F-301(b)(21) should be
referenced as the COMMENTS block and/or MISC INFO tab.
Response: The title is revised to incorporate ``MISC. INFO'' as
suggested.
R. Printed Documents
Comment: One respondent recommended at paragraph F-306(b), that the
text be revised to clarify that if a signed copy is required by the
contractor, the contractor will print the WAWF RR only after a
signature is applied by the Government Inspector or Acceptor in WAWF.
Response: This text is revised accordingly to incorporate the
suggestion.
S. Part 4--General Comments
Comment: One respondent stated that in Part 4 there are multiple
references to section F-301 and recommended, where appropriate, the
references be updated to the corresponding F-401 reference. The
respondent also suggested that at paragraph F-401(b)(2), ``Starting
over with 0001'' cannot be used in an electronic world, and that the DD
Form 250 needs to conform to the same requirement (F-301(b)(2)) as the
WAWF RR.
Response: Part 4 references in the final rule are updated as
required. In
[[Page 58125]]
regard to shipment numbering, the system will not allow the shipment
number to start over with 0001 as any duplication of the combined
contract number, delivery order number, and shipment number results a
duplication error. In these cases, WAWF requires a change in the
shipment number prefix. While on a paper DD Form 250, it is possible to
start over with 0001 when the series is completely used, a change in
the shipment number prefix should be required for consistency. The text
at F-401(b)(2) is revised to clarify this process.
T. Part 5 Comments
Comment: A respondent commented on Part 5 concerning the
``alternate'' release procedure. The respondent noted that all other
references in the document are to ``alternative'' release procedure,
and would like to know which is correct.
Response: The final rule is revised in Part 5 to refer to
``alternative'' in lieu of ``alternate.''
U. WAWF Versions
Comment: A respondent stated there are a number of changes
incorporated in the latest WAWF release that impact MIRR data entry.
The respondent noted that changes include removal of ``other'' as an
acceptance point and replacing it with more specific data entries for
inspection, acceptance, and ship to DoDAAC codes.
Response: There is no need to change paragraph F-301(b)(6) as
``Other'' will remain an option for the inspection and acceptance
point. DoD adopted business rules regarding the inspection, acceptance,
and ship-to fields but kept the source, destination, and other
inspection and acceptance points. Therefore, no change is necessary.
V. General Comments
Comment: One respondent stated that Appendix F addresses the use of
the MIRR in WAWF, yet multiple types of receiving and performance
transactions exist. Examples include:
[cir] Receiving Report.
[cir] Receiving Report--COMBO.
[cir] Invoice 2-in-1 (Services Only).
Response: Appendix F only provides instruction for use of the MIRR.
Invoice 2-in-1 (services only) is used to document acceptance of
services when a MIRR is not required. The COMBO transaction in WAWF
allows for the vendor to do one set of data entry that is split in the
system into both a receiving report, identical to the non-COMBO
receiving report, and an invoice. The instructions for the data entry
in the COMBO are the same as the data fields for the receiving report.
Comment: A respondent suggested at paragraph F-301 rewording to
state that Electronic Document Access (EDA) will automatically populate
all available and applicable contract data.
Response: This change is incorporated at F-301(a)(3) in the final
rule.
Comment: A respondent stated that they had received multiple
rejections of receiving reports due to a formatting issue. In one case,
the receiving report was rejected due to a dash being dropped out of
the line item stock number upon loading to WAWF. In the respondent's
opinion, the missing dash should not be a reason for rejection. The
respondent requested adding specific language to F-301(b)(15) to
indicate that missing dashes are acceptable in the line item stock
number.
Response: The respondent indicates a dash was missing from the part
number. This changes the item identification significantly. There are
no known concerns with the National Stock Number functionality.
III. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess
all costs and benefits of available regulatory alternatives and, if
regulation is necessary, to select regulatory approaches that maximize
net benefits (including potential economic, environmental, public
health and safety effects, distributive impacts, and equity). E.O.
13563 emphasizes the importance of quantifying both costs and benefits,
of reducing costs, of harmonizing rules, and of promoting flexibility.
This is not a significant regulatory action and, therefore, was not
subject to review under section 6(b) of E.O. 12866, Regulatory Planning
and Review, dated September 30, 1993. This rule is not a major rule
under 5 U.S.C. 804.
IV. Regulatory Flexibility Act
DoD does not expect this final rule to have a significant economic
impact on a substantial number of small entities within the meaning of
the Regulatory Flexibility Act, 5 U.S.C. 601, et seq. The final rule
provides guidance on the preparation and use of the electronic WAWF
Receiving Report which is now required for use in most contracts.
Additionally, the rule addresses the WAWF capability and instructions
to comply with reporting requirements for IUID and RFID data
submissions. DoD has prepared a Final Regulatory Flexibility Analysis,
which is summarized as follows:
The objective of the rule is to facilitate maximum use of WAWF by
providing detailed guidance. DFARS Subpart 232.70, Electronic
Submission and Processing of Payment Requests and Receiving Reports,
prescribes policies for submitting and processing payment requests in
electronic form to comply with 10 U.S.C. 2227, Electronic Submission
and Processing of Claims for Contract Payments. WAWF is the DoD system
for contractors to submit payment and receiving reports in an
electronic format. This final rule affects all DoD contractors who are
not exempt from using WAWF. Exempt classes of contracts are those that
are listed under the seven categories of contracts at DFARS 232.7002,
Policy. Record keeping required is limited to that necessary to
properly invoice and record shipping and receiving information under
Government contracts. The preparation of these records requires
clerical and analytic skills to create the documents and input them
into the electronic WAWF system.
The rule does not duplicate, overlap, or conflict with any other
Federal rules. There are no known significant alternatives to the rule
that would meet the requirements of 10 U.S.C. 2227, Electronic
Submission and Processing of Claims for Contract Payments. Any impact
on small business is expected to be beneficial by providing detailed
use, preparation and distribution guidance for electronic submission in
lieu of preparing and submitting paper invoices and receiving records.
V. Paperwork Reduction Act
The Paperwork Reduction Act (44 U.S.C. chapter 35) applies. The
Appendix F information collection requirements in this rule are
approved under Office of Management and Budget Control Number 0704-
0248, DFARS Appendix F, Material Inspection and Receiving Report. The
current approval took into consideration use of the automated WAWF
system, so inclusion of the WAWF guidance into Appendix F adds no new
information collection requirements.
List of Subjects in 48 CFR Appendix F to Chapter 2
Government procurement.
Mary Overstreet,
Editor, Defense Acquisition Regulations System.
Therefore, 48 CFR chapter 2 is amended by revising appendix F to
read as follows:
[[Page 58126]]
Appendix F to Chapter 2--Material Inspection and Receiving Report
Sec.
Part 1--Introduction
F-101 General.
F-102 Applicability.
F-103 Use.
F-104 Application.
Part 2--Contract Quality Assurance On Shipments Between Contractors
F-201 Procedures.
Part 3--Preparation of the Wide Area Workflow Receiving Report (WAWF
RR)
F-301 Preparation instructions.
F-302 Mode/method of shipment codes.
F-303 Consolidated shipments.
F-304 Correction instructions.
F-305 Invoice instructions.
F-306 Packing list instructions.
F-307 Receiving instructions.
Part 4--Preparation of the DD Form 250 and DD Form 250C
F-401 Preparation instructions.
F-402 Mode/method of shipment codes.
F-403 Consolidated shipments.
F-404 Multiple consignee instructions.
F-405 Correction instructions.
F-406 Invoice instructions.
F-407 Packing list instructions.
F-408 Receiving instructions.
Part 5--Distribution of Wide Area Workflow Receiving Report (WAWF RR),
DD Form 250 and DD Form 250C
F-501 Distribution of WAWF RR.
F-502 Distribution of DD Form 250 and DD Form 250C.
Part 6--Preparation of the DD Form 250-1 (Loading Report)
F-601 Instructions.
Part 7--Preparation of the DD Form 250-1 (Discharge Report)
F-701 Instructions.
Part 8--Distribution of the DD Form 250-1
F-801 Distribution.F-802 Corrected DD Form 250-1.
F-802 Corrected DD Form 250-1.
Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.
Part 1--Introduction
F-101 General.
(a) This appendix contains procedures and instructions for the
use, preparation, and distribution of the Wide Area WorkFlow
Receiving Report (WAWF RR), the DD Form 250, Material Inspection and
Receiving Report (MIRR) and (DD Form 250 series equivalents) and
commercial shipping/packing lists used to document Government
contract quality assurance.
(b) The use of the DD Form 250 is on an exception basis (see
DFARS 232.7003(a)) because use of the WAWF RR is now required by
most DoD contracts. WAWF provides for electronic preparation and
documentation of acceptance of supplies and services, and electronic
invoicing. In addition WAWF allows the printing of a RR that can be
used as a packing list or when a signed copy is required.
F-102 Applicability.
(a) DFARS 252.232-7003, Electronic Submission of Payment
Requests and Receiving Reports, requires payment requests and
receiving reports using WAWF in nearly all cases.
(b) The provisions of this appendix also apply to supplies or
services acquired by DoD when the clause at DFARS 252.246-7000,
Material Inspection and Receiving Report, is included in the
contract.
(c) When DoD provides quality assurance or acceptance services
for non-DoD activities, prepare a MIRR using the instructions in
this appendix, unless otherwise specified in the contract.
F-103 Use.
(a) The WAWF RR and the DD Form 250 are multipurpose reports
used--
(1) To provide evidence of Government contract quality assurance
at origin or destination;
(2) To provide evidence of acceptance at origin, destination, or
other;
(3) For packing lists;
(4) For receiving;
(5) For shipping;
(6) As a contractor invoice (the WAWF RR or DD Form 250 alone
cannot be used as an invoice, however the option exists to create an
invoice from the Receiving Report or a Combo (Invoice and Receiving
Report) both of which minimize data entry); and
(7) As commercial invoice support.
(b) Do not use the WAWF RR or the DD Form 250 for shipments--
(1) By subcontractors, unless the subcontractor is shipping
directly to the Government; or
(2) Of contract inventory. The WAWF Property Transfer document
should be used for this type of shipment. Training for the
preparation of this document type is available at https://wawftraining.eb.mil, under the Property Transfer and Receipt
section.
(c) The contractor prepares the WAWF RR or the DD Form 250,
except for entries that an authorized Government representative is
required to complete. When using a paper DD Form 250, the contractor
shall furnish sufficient copies of the completed form, as directed
by the Government representative.
(d) Use the DD Form 250-1:
(1) For bulk movements of petroleum products by tanker or barge
to cover--
(i) Origin or destination acceptance of cargo; or
(ii) Shipment or receipt of Government owned products.
(2) To send quality data to the point of acceptance in the case
of origin inspection on FOB destination deliveries or preinspection
at product source. Annotate the forms with the words ``INSPECTED FOR
QUALITY ONLY.''
(e) In addition to the above uses, the WAWF RR provides
additional functionality, not provided by the paper DD Form 250 that
complies with the following requirements:
(1) Item Unique Identification (IUID), when the clause at DFARS
252.211-7003, Item Identification and Valuation, is used in the
contract, reporting of IUID data is required. WAWF captures the IUID
data and forwards the data to the IUID registry after acceptance.
WAWF can be used to report Unique Item Identifiers (UIIs) at the
line item level and also UIIs embedded at the line item level.
(2) Radio Frequency Identification (RFID), when the clause at
DFARS 252.211-7006, Radio Frequency Identification, is used in the
contract, WAWF will capture the RFID information and forward the
data to the receiving location. Using WAWF is the only way a
contractor can comply with the clause to furnish RFID data via an
Advance Shipping Notice (ASN). The RFID information may be added at
time of submission, or via the WAWF Pack Later functionality after
acceptance.
F-104 Application.
(a) WAWF RR and DD Form 250.
(1) Use the WAWF RR or DD Form 250 for delivery of contract
line, subline, exhibit line, or exhibit subline items. Do not use
the WAWF RR or DD Form 250 for those exhibit line or exhibit subline
items on a DD Form 1423, Contract Data Requirements List, which
indicate no DD Form 250 is required.
(2) If the shipped to, marked for, shipped from, mode of
shipment, contract quality assurance and acceptance data are the
same for more than one shipment made on the same day under the same
contract, contractors may prepare one WAWF RR or DD Form 250 to
cover all such shipments.
(3) If the volume of the shipment precludes the use of a single
car, truck, or other vehicle, prepare a separate WAWF RR or DD Form
250 for the contents of each vehicle.
(4) When a shipment is consigned to an Air Force activity and
the shipment includes items of more than one Federal supply class
(FSC) or material management code (MMC), prepare a separate WAWF RR
or DD Form 250 for items of each of the FSCs or MMCs in the
shipment. However, the cognizant Government representative may
authorize a single WAWF RR or DD Form 250, listing each of the FSCs
or MMCs included in the shipment on a separate continuation sheet.
The MMC appears as a suffix to the national stock number applicable
to the item.
(5) Consolidation of Petroleum Shipments on a Single WAWF RR or
DD Form 250.
(i) Contiguous United States. Contractors may consolidate
multiple car or truck load shipments of petroleum made on the same
day, to the same destination, against the same contract line item,
on one WAWF RR or DD Form 250. To permit verification of motor
deliveries, assign each load a load number which can be identified
to the shipment number in Block 2 of the DD Form 250. Include a
shipping document (commercial or Government) with each individual
load showing as a minimum--
(A) The shipper;
(B) Shipping point;
(C) Consignee;
(D) Contract and line item number;
(E) Product identification;
(F) Gross gallons (bulk only);
(G) Loading temperature (bulk only);
(H) American Petroleum Institute gravity (bulk only);
[[Page 58127]]
(I) Identification of carrier's equipment;
(J) Serial number of all seals applied; and
(K) Signature of supplier's representative.
When acceptance is at destination, the receiving activity retains
the shipping document(s) to verify the entries on the consignee copy
of the DD Form 250 forwarded by the contractor (reference F-401,
Table 1) before signing Block 21b.
(ii) Overseas. The same criteria as for contiguous United States
applies, except the consolidation period may be extended, if
acceptable to the receiving activity, shipping activity, Government
finance office, and the authorized Government representative having
cognizance at the contractor's facility. In addition, the contractor
may include more than one contract line item in each WAWF RR or DD
Form 250 if the shipped to, marked for, shipped from, mode of
shipment, contract quality assurance, and acceptance data are the
same for all line items.
(6) Consolidation of Coal Shipments on a Single WAWF RR or DD
250. Contractors may consolidate multiple railcar or truck shipments
of coal made on the same day, to the same destination, against the
same contract line items, on one WAWF RR or DD 250. To permit
verification of truck deliveries, assign each load a load number
which can be identified to the shipment number in Block 2 of the DD
Form 250 and the analytical test report. Include a commercial
shipping document with each individual truck load showing as a
minimum--
(i) The shipper;
(ii) The name or names;
(iii) Location and shipping point of the mine or mines from
which the coal originates;
(iv) The contract number;
(v) The exact size of the coal shipped; and
(vi) A certified weighmaster's certification of weight for the
truckload.
Include a waybill with each rail shipment showing the identical
information. To permit verification of rail deliveries, identify
each railcar number comprising the shipment to the shipment number
in Block 2 of the DD Form 250 and the analytical test report. When
acceptance is at destination, the receiving activity must retain the
shipping document(s) to verify the entries on the consignee copy of
the DD Form 250.
(b) DD Form 250-1.
(1) Use a separate form for each tanker or barge cargo loaded.
(2) The contractor may report more than one barge in the same
tow on a single form if on the same contract and consigned to the
same destination.
(3) When liftings involve more than one contract, prepare
separate forms to cover the portion of cargo loaded on each
contract.
(4) Prepare a separate form for each product or grade of product
loaded.
(5) Use a separate document for each tanker or barge cargo and
each grade of product discharged.
(6) For discharge, the contractor may report more than one barge
in the same tow on a single form if from the same loading source.
Part 2--Contract Quality Assurance on Shipments Between Contractors
F-201 Procedures
Follow the procedures at PGI F-201 for evidence of required
Government contract quality assurance at a subcontractor's facility.
Part 3--Preparation of the Wide Area Workflow Receiving Report
(WAWF RR)
F-301 Preparation instructions.
(a) General.
(1) Preparation instructions and training for the WAWF RR are
available at https://wawftraining.eb.mil. The instructions on
preparing a WAWF RR are part of the Vendor Training section.
(2) Prime contractors can direct subcontractors to prepare and
submit documents in WAWF by giving their subcontractors access to
WAWF via the creation of a Commercial and Government Entity (CAGE)
extension to the prime CAGE.
(3) If the contract is in Electronic Document Access (EDA)
(DoD's contract repository), then the WAWF system will automatically
populate all available and applicable contract data.
(i) When source acceptance is required, WAWF will populate the
``Inspect By'' with the ``Admin by'' Department of Defense Activity
Address Code (DoDAAC). The vendor shall change the DoDAAC if
Government Source Inspection (GSI) is performed at other than the
``Admin By.''
(ii) Any fields that have been pre-filled may be changed.
(iii) WAWF will also verify that CAGE codes are valid and active
in the CCR (Central Contractor Registration), and that DoDAACs and
Military Assistance Program Address Codes (MAPACs) are valid in
Defense Automatic Addressing System (DAAS).
(4) WAWF will populate the address information for CAGE codes,
DODAACs, and MAPACs from CCR and DAAS. These sites are the DoD
definitive sources for address information. Any fields that have
been pre-filled may be changed or additional information added.
(5) Do not include classified information in WAWF.
(b) Completion instructions.
(1) Contract no/delivery order No.
(i) Enter the 13-position alpha-numeric basic Procurement
Instrument Identification Number (PIIN) of the contract. When
applicable, enter the four-position alpha-numeric call/order serial
number that is supplementary to the 13-position basic PIIN. This
number is also referred to as the Supplementary Procurement
Instrument Identification Number (SPIIN). Use SPIINs for (also see
Subpart 204.70)--
(A) Delivery orders under indefinite-delivery type contracts;
(B) Orders under basic ordering agreements; and
(C) Calls under blanket purchase agreements.
(ii) Except as indicated in paragraph (b)(1)(iii) of this
appendix, do not enter supplementary numbers used in conjunction
with basic PIINs to identify--
(A) Modifications of contracts and agreements;
(B) Modifications to calls or orders; or
(C) Document numbers representing contracts written between
contractors.
(iii) When shipping instructions are furnished and shipment is
made before receipt of the confirming contract modification (SF 30,
Amendment of Solicitation/Modification of Contract), enter a comment
in the Misc. Info Tab to this effect. This will appear in the
Comments section of the printed WAWF RR.
(iv) For DoD delivery orders on non-DoD contracts, enter the
non-DoD contract number in the contract number field and enter the
DoD contract number and, when applicable, delivery order number in
the delivery order field.
(2) Shipment No.
(i) The shipment number format requires first three data
positions to be alpha, fourth position alpha-numeric and last three
positions numeric, e.g., DFAR001 or DAR0001. Any document used as a
packing list must include the shipment number information.
(A) The prime contractor shall control and assign the shipment
number prefix. The shipment number shall consist of three alphabetic
characters for each ``Shipped From'' address. The shipment number
prefix shall be different for each ``Shipped From'' address and
shall remain constant throughout the life of the contract. The prime
contractor may assign separate prefixes when shipments are made from
different locations within a facility identified by one ``Shipped
From'' address.
(B) Number the first shipment 0001 for shipments made under the
contract or contract and order number from each ``Shipped From''
address, or shipping location within the ``Shipped From'' address.
Consecutively number all subsequent shipments with the identical
shipment number prefix. While shipments should be created
sequentially they can be released and accepted out of sequence.
(1) Use alpha-numeric serial numbers when more than 9,999
numbers are required. Serially assign alpha-numeric numbers with the
alpha in the first position (the letters I and O shall not be used)
followed by the three-position numeric serial number. Use the
following alpha-numeric sequence:
A000 through A999 (10,000 through 10,999)
B000 through B999 (11,000 through 11,999)
Z000 through Z999 (34,000 through 34,999)
(2) When this series is completely used, the shipment number
prefix will have to be changed when the series is completely used.
WAWF will not allow duplicate shipment numbers to be created against
a contract or contract and delivery order.
(ii) Reassign the shipment number of the initial shipment where
a ``Replacement Shipment'' is involved (see paragraph (b)(16)(iv)(F)
of this appendix).
(iii) The prime contractor shall control deliveries and on the
final shipment of the contract shall end the shipment number with a
``Z.'' Where the final shipment is from other than the prime
contractor's plant, the prime contractor may elect either to--
(A) Direct the subcontractor making the final shipment to end
that shipment number with a ``Z''; or
[[Page 58128]]
(B) Upon determination that all subcontractors have completed
their shipments, to correct the DD Form 250 (see F-304) covering the
final shipment made from the prime contractor's plant by addition of
a ``Z'' to that shipment number.
(iv) Contractors follow the procedures in F-305 to use
commercial invoices.
(3) Date shipped. Enter the date the shipment is released to the
carrier or the date the services are completed. If the shipment will
be released after the date of contract quality assurance and/or
acceptance, enter the estimated date of release. When the date is
estimated, enter an ``E'' or select an ``E'' from the drop down menu
in the ``Estimated'' block after the date. Do not delay submission
of the WAWF RR for lack of entry of the actual shipping date.
Correction of the WAWF RR is not required to show the actual
shipping date (see F-303). Once the document is submitted the
shipment date cannot be changed.
(4) B/L TCN. When applicable, enter--
(i) The commercial or Government bill of lading number after
``B/L;'' WAWF provides the capability to separately and correctly
identify the Government Bill of Lading (GBL) from a Commercial Bill
of Lading (CBL). An authorized user will select whether the entered
bill of lading number is either a GBL number or a CBL number.
(ii) The transportation control number must be a 17 alpha/
numeric digit min/max field, and WAWF provides the capability to
enter two secondary transportation tracking numbers.
(5) Line haul mode. Select the Line Haul Mode of Shipment code
from a drop down menu in WAWF.
(6) Inspection and acceptance point. Enter an ``S'' for Origin
or ``D'' for Destination. In addition to ``S'' and ``D,'' WAWF
allows acceptance at Other (O). For purposes of conforming to
contract, ``O'' is equivalent to ``D''. In WAWF, destination
acceptance is performed by the ``Ship to'' DODAAC organization and
``Other'' permits the acceptance of destination documents at a
location other than the ``Ship to.'' The goods or services will be
shipped to one location and the paperwork will be routed to another
location for the actual acceptance.
(7) Prime contractor/code. Enter the prime CAGE code to which
the contract was awarded.
(8) Administered by/code. Enter the DoDAAC code of the contract
administration office cited in the contract.
(9) Shipped from/code.
(i) Enter the CAGE or DoDAAC code of the ``Shipped From''
location. If it is the same as the CAGE code leave blank.
(ii) For performance of services line items which do not require
delivery of items upon completion of services, enter the code of the
location at which the services were performed. As mentioned in (i)
above, if identical to the prime CAGE code leave blank.
(10) FOB. Enter an ``S'' for Origin or ``D'' for Destination as
specified in the contract. Enter an alphabetic ``O'' if the ``FOB''
point cited in the contract is other than origin or destination.
(11) Payment will be made by/code. Enter the DoDAAC code of the
payment office cited in the contract.
(12) Shipped to/code. Enter the DoDAAC, MAPAC, or CAGE code from
the contract or shipping instructions.
(13) Marked for/code. Enter the code from the contract or
shipping instructions. Only valid DoDAACs, MAPACs, or CAGE codes can
be entered. Vendors should use the WAWF ``Mark for Rep'' and ``Mark
for Secondary'' fields for textual marking information specified in
the contract.
(14) Item No. Enter the item number used in the contract. Use a
valid 4 or 6 character line item number under the Uniform Contract
Line Item Numbering System (see 204.71). Line item numbers with 6
characters with numbers in the final two positions are not
deliverable or billable.
(15) Stock/part number/description.
(i) Enter the following for each line item:
(A) The national stock number (NSN) or noncatalog number. If the
contract contains NSNs as well as other identification (e.g., part
numbers) the contractor should place the NSN information in the
Stock Part Number field and the remaining numbers in the line item
description field. The data entered in the NSN field must reflect
the NSN of the material item being shipped and should be a valid
NSN, 13 positions in length. In the ``Type'' drop-down field, select
the corresponding type for the data entered. If no National Stock
Number (NSN) or other valid ``Type'' is available, the word ``NONE''
may be entered for the Stock/Part Number, with a corresponding
``Type'' of any value other than NSN selected from the drop-down
box.
(B) In the description field, if required by the contract for
control purposes, enter: The make, model, serial number, lot, batch,
hazard indicator, or similar description.
(C) The Military Standard Requisitioning and Issue Procedures
(MILSTRIP) must be placed on the MILSTRIP Tab, not in the line item
description field. Enter the MILSTRIP data for each CLIN when
MILSTRIP data is identified in the contract.
(ii) For service line items, select SV for ``SERVICE'' in the
type field followed by as short a description as is possible in the
description field. Some examples of service line items are
maintenance, repair, alteration, rehabilitation, engineering,
research, development, training, and testing. The ``Ship To'' code
and the ``Unit'' will have to be filled out. The ``Shipped To'' code
is the destination Service Acceptor Code for WAWF. If source
inspected and accepted enter the service performance location as the
``Ship To'' code.
(iii) For all contracts administered by the Defense Contract
Management Agency, with the exception of fast pay procedures, enter
the gross weight of the shipment.
(iv) In the description field enter the following as appropriate
(entries may be extended through Block 20).
(A) Enter in capital letters any special handling instructions/
limits for material environmental control, such as temperature,
humidity, aging, freezing, shock, etc.
(B) When a shipment is chargeable to Navy appropriation 17X4911,
enter the appropriation, bureau control number (BCN), and
authorization accounting activity (AAA) number (e.g., 17X4911-14003-
104).
(C) When the Navy transaction type code (TC), ``2T'' or ``7T''
is included in the appropriation data, enter ``TC 2T'' or ``TC 7T.''
(D) When an NSN is required by but not cited in a contract and
has not been furnished by the Government, the contractor may make
shipment without the NSN at the direction of the contracting
officer. Enter the authority for such shipment.
(E) When Government furnished property (GFP) is included with or
incorporated into the line item, enter the letters ``GFP.''
(F) On shipments of Government furnished aeronautical equipment
(GFAE) under Air Force contracts, enter the assignment AERNO control
number, e.g., ``AERNO 60-6354.''
(G) For items shipped with missing components, enter and
complete the following:
``Item(s) shipped short of the following component(s): NSN or
comparable identification --------, Quantity --------, Estimated
Value --------, Authority --------''
(H) When shipment is made of components which were short on a
prior shipment, enter and complete the following:
``These components were listed as shortages on shipment number
--------, date shipped --------''
(I) When shipments involve drums, cylinders, reels, containers,
skids, etc., designated as returnable under contract provisions,
enter and complete the following:
``Return to --------, Quantity --------, Item --------,
Ownership (Government/contractor).''
(J) Enter the total number of shipping containers, the type of
containers, and the container number(s) assigned for the shipment.
(K) On foreign military sales (FMS) shipments, enter the special
markings, and FMS case identifier from the contract. Also enter the
gross weight.
(L) When test/evaluation results are a condition of acceptance
and are not available prior to shipment, the following note shall be
entered if the shipment is approved by the contracting officer:
``Note: Acceptance and payment are contingent upon receipt of
approved test/evaluation results.''
The contracting officer will advise--
(1) The consignee of the results (approval/disapproval); and
(2) The contractor to withhold invoicing pending attachment of
the approved test/evaluation results.
(M) For clothing and textile contracts containing a bailment
clause, enter the words ``GFP UNIT VALUE.''
(N) When the initial unit incorporating an approved value
engineering change proposal (VECP) is shipped, enter the following
statement:
This is the initial unit delivered which incorporates VECP No. ----
----, Contract Modification No. --------, dated --------
(16) Quantity shipped/received.
(i) Enter the quantity shipped, using the unit of measure in the
contract for payment. When a second unit of measure is used for
[[Page 58129]]
purposes other than payment, enter the appropriate quantity in the
description field.
(ii) On the final shipment of a line item of a contract
containing a clause permitting a variation of quantity and an
underrun condition exists, the prime contractor shall choose the
Ship Advice Code ``Z''. Where the final shipment is from other than
the prime contractor's plant and an underrun condition exists, the
prime contractor may elect to direct the subcontractor making the
final shipment to choose the Ship Advice Code ``Z'';
(iii) When the Government is performing destination acceptance
the acceptor should enter actual quantity received in apparent good
condition in the ``Qty. Accepted'' field of the Acceptor Line Item
Tab.
(17) Unit of measure. Enter the abbreviation of the unit measure
as indicated in the contract for payment. Where a second unit of
measure is indicated in the contract for purposes other than payment
or used for shipping purposes, enter the second unit of measure in
the description field. Authorized abbreviations are listed in MIL-
STD-129, Marking for Shipping and Storage and in the WAWF Unit of
Measure Table Link. For example, LB for pound, SH for sheet.
(18) Unit price. The contractor may, at its option, enter unit
prices on all WAWF RR copies, except as a minimum:
(i) The contractor shall enter unit prices for each item of
property fabricated or acquired for the Government and delivered to
a contractor as Government furnished property (GFP). Get the unit
price from Section B of the contract. If the unit price is not
available, use an estimate. The estimated price should be the
contractor's estimate of what the items will cost the Government.
When the price is estimated, enter ``Estimated Unit Price'' in the
description field. However, if the contract has Item Unique
Identification (IUID) requirements and the receiving report is being
processed in WAWF the unit price represents the acquisition cost
that will be passed to the IUID registry. Therefore, the unit price
is required (see the clause at DFARS 252.211-7003, Item
Identification and Valuation). When delivering GFP via WAWF to
another contractor, WAWF will initiate a property transfer if the
vendor who is initiating the WAWF RR is also registered as a vendor
property shipper in WAWF and the vendor receiving the property is
also a vendor property receiver in WAWF.
(ii) For clothing and textile contracts containing a bailment
clause, enter the cited Government furnished property unit value as
``GFP UNIT VALUE'' in the description field.
(19) Amount. WAWF will calculate and populate the amount by
multiplying the unit price times the quantity.
(20) Contract Quality Assurance (CQA).
(i) The words ``conform to contract'' contained in the text
above the signature block in the WAWF RR Header Tab relate to
quality and to the quantity of the items on the report. Enter notes
taking exception in Misc. Info Tab comment field or on attached
supporting documents with an appropriate block cross-reference.
(ii) When a shipment is authorized under an alternative release
procedure, contractors will execute the alternative release
procedure in WAWF by including the appropriate indicator in the
electronic transaction rather than through inclusion or attachment
of the text of the certificate. The alternative release procedure
only provides for release of shipment; Government acceptance must
still be indicated by a Government official's signature on the WAWF
RR.
(iii) When contract terms provide for use of Certificate of
Conformance and shipment is made under these terms, contractors will
execute Certificates in WAWF by including the appropriate indicator
in the electronic transaction rather than through inclusion or
attachment of the text of the certificate. Government acceptance
must still be indicated by a Government official's signature on the
WAWF RR.
(iv) Origin.
(A) The authorized Government representative must:--
(1) Place an ``X'' in the appropriate CQA and/or acceptance
box(es) to show origin CQA and/or acceptance; and
(2) Sign and date.
WAWF will enter the typed, stamped, or printed name, title,
email address, and commercial telephone number.
(B) When fast pay procedures apply, the contractor or
subcontractor shall select ``FAST PAY'' when creating the WAWF RR.
When CQA is required, the authorized Government representative shall
execute the block as required by paragraph (A).
(v) Destination. When CQA and acceptance or acceptance is at
destination, the authorized Government representative must--
(A) Place an ``X'' in the appropriate box(es); and
(B) Sign and date.
WAWF will enter the typed, stamped, or printed name, title,
email address, and commercial telephone number.
(21) Contractor use only. MISC. INFO. Self explanatory.
F-302 Mode/method of shipment codes.
------------------------------------------------------------------------
Code Description
------------------------------------------------------------------------
A Motor, truckload.
B Motor, less than truckload.
C Van (unpacked, uncrated personal or
Government property).
D Driveaway, truckaway, towaway.
E Bus.
F Air Mobility Command (Channel and Special
Assignment Airlift Mission).
G Surface parcel post.
H Air parcel post.
I Government trucks, for shipment outside
local delivery area.
J Air, small package carrier.
K Rail, carload.\1\
L Rail, less than carload.\1\
M Surface, freight forwarder.
N LOGAIR.
O Organic military air (including aircraft
of foreign governments).
P Through Government Bill of Lading (TGBL).
Q Commercial air freight (includes regular
and expedited service provided by major
airlines; charters and air taxis).
R European Distribution System or Pacific
Distribution System.
S Scheduled Truck Service (STS) (applies to
contract carriage, guaranteed traffic
routings and/or scheduled service).
T Air freight forwarder.
U QUICKTRANS.
V SEAVAN.
W Water, river, lake, coastal (commercial).
X Bearer, walk-thru (customer pickup of
material).
Y Military Intratheater Airlift Service.
Z Military Sealift Command (MSC) (controlled
contract or arranged space).
2 Government watercraft, barge, lighter.
3 Roll-on Roll-off (RORO) service.
4 Armed Forces Courier Service (ARFCOS).
5 Surface, small package carrier.
6 Military official mail (MOM).
7 Express mail.
8 Pipeline.
9 Local delivery by Government or commercial
truck (includes on base transfers;
deliveries between air, water, or motor
terminals; and adjacent activities).
Local delivery areas are identified in
commercial carriers' tariffs which are
filed and approved by regulatory
authorities.
------------------------------------------------------------------------
\1\ Includes trailer/container-on-flat-car (excluding SEAVAN).
F-303 Consolidated shipments.
When individual shipments are held at the contractor's plant for
authorized transportation consolidation to a single bill of lading,
the contractor may prepare the WAWF RR at the time of CQA or
acceptance prior to the time of actual shipment.
F-304 Correction instructions.
Functionality for correcting a WAWF RR is being developed.
Preparation instructions and training for corrections will be
available at https://wawftraining.eb.mil once the functionality is
deployed. The instructions will be part of the vendor training.
F-305 Invoice instructions.
Contractors shall submit payment requests and receiving reports
in electronic form, unless an exception in DFARS 232.7002 applies.
Contractor submission of the material inspection and receiving
information required by this appendix by using the WAWF electronic
form (see paragraph (b) of the clause at DFARS 252.232-7003)
fulfills the requirement for a DD Form 250 MIRR. Contractors should
ensure the packaging documentation includes a Government signed
receiving report when the contract requires origin inspection and
acceptance. Contractors must include a signed document indicating
material receipt and acceptance has occurred in the container with
the exception of material shipments that are approved for
Alternative Release Procedures (ARP).
[[Page 58130]]
F-306 Packing list instructions.
Contractors may also use a WAWF processed RR as a packing list.
WAWF provides options to print the RR. These printed RRs may also be
used if a signed copy is required.
(a) WAWF provides a print capability for its RR. The WAWF
printed RR can be identified by its distinctive format and by the
text ``Please look in WAWF for signed copy'' underneath the
``RECEIVING REPORT'' title at the top of each printed page. This
printed copy can be used as a packing list. If needed, the signature
can be verified by reviewing the signed RR in WAWF.
(b) Contractors can also print a RR from their systems (not
WAWF). If such a signed copy is required by the contractor, the
contractor will print the WAWF RR only after a signature is applied
by the Government Inspector or Acceptor in WAWF. Copies printed will
be annotated with ``\\original signed in WAWF\\'' in lieu of the
inspector/acceptor's signature.
F-307 Receiving instructions.
If CQA and acceptance or acceptance of supplies is required upon
arrival at destination, see F-301(b)(20)(v) for instructions.
Part 4--Preparation of the DD Form 250 and DD Form 250C
F-401 Preparation instructions.
(a) General.
(1) Dates must use nine spaces consisting of the four digits of
the year, three-position alphabetic month abbreviation, and two
digits for the day. For example, 2000AUG07, 2000SEP24.
(2) Addresses must consist of the name, street address/P.O. box,
city, state, and ZIP code.
(3) Enter to the right of and on the same line as the word
``Code'' in Blocks 9 through 12 and in Block 14--
(i) The Commercial and Government Entity Handbook (H4/H8) code;
(ii) The DoD activity address code (DoDAAC) as it appears in the
DoD Activity Address Directory (DoDAAD), DoD 4000.25-6-M; or
(iii) The Military Assistance Program Address Directory (MAPAD)
code.
(4) Enter the DoDAAC, CAGE (H4/H8), or MAPAD code in Block 13.
(5) The data entered in the blocks at the top of the DD Form
250c must be identical to the comparable entries in Blocks 1, 2, 3,
and 6 of the DD Form 250.
(6) Enter overflow data from the DD Form 250 in Block 16 or in
the body of the DD Form 250c with an appropriate cross-reference. Do
not number or distribute additional DD Form 250c sheets, solely for
continuation of Block 23 data as part of the MIRR.
(7) Do not include classified information in the MIRR. MIRRs
must not be classified.
(b) Completion instructions.
(1) Block 1--Procurement instrument identification (Contract)
NO. See paragraph F-301(b)(1).
(2) Block 2--Shipment no. See F-301(b)(2), Shipment no. When the
series is completely used, change the shipment number prefix and
start with 0001.
(3) Block 3--Date shipped. Enter the date the shipment is
released to the carrier or the date the services are completed. If
the shipment will be released after the date of CQA and/or
acceptance, enter the estimated date of release. When the date is
estimated, enter an ``E'' after the date. Do not delay distribution
of the MIRR for entry of the actual shipping date. Reissuance of the
MIRR is not required to show the actual shipping date (see F-403).
(4) Block 4--B/L TCN. When applicable, enter--
(i) The commercial or Government bill of lading number after
``B/L;''
(ii) The transportation control number after ``TCN'' (when a TCN
is assigned for each line item on the DD Form 250 under Block 16
instructions, insert ``See Block 16''); and
(iii) The initial (line haul) mode of shipment code in the lower
right corner of the block (see F-402).
(5) Block 5--Discount terms.
(i) The contractor may enter the discount in terms of
percentages on all copies of the MIRR.
(ii) Use the procedures in F-406 when the MIRR is used as an
invoice.
(6) Block 6--Invoice no./date.
(i) The contractor may enter the invoice number and actual or
estimated date of invoice submission on all copies of the MIRR. When
the date is estimated, enter an ``E'' after the date. Do not correct
MIRRs other than invoice copies to reflect the actual date of
invoice submission.
(ii) Use the procedures in F-406 when the MIRR is used as an
invoice.
(7) Block 7--Page/of. Consecutively number the pages of the
MIRR. On each page enter the total number of pages of the MIRR.
(8) Block 8--Acceptance point. Enter an ``S'' for Origin or
``D'' for destination.
(9) Block 9--Prime contractor/code. Enter the code and address.
(10) Block 10--Administered by/code. Enter the code and address
of the contract administration office cited in the contract.
(11) Block 11--Shipped from/code/fob.
(i) Enter the code and address of the ``Shipped From'' location.
If identical to Block 9, enter ``See Block 9.''
(ii) For performance of services line items which do not require
delivery of items upon completion of services, enter the code and
address of the location at which the services were performed. If the
DD Form 250 covers performance at multiple locations, or if
identical to Block 9, enter ``See Block 9.''
(iii) Enter on the same line and to the right of ``FOB'' an
``S'' for Origin or ``D'' for Destination as specified in the
contract. Enter an al