Environmental Impacts Statements; Notice of Availability, 57739-57740 [2011-23828]
Download as PDF
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
[FRL–9466–4; Docket ID No. EPA–HQ–ORD–
2011–0390]
Draft Toxicological Review of 1,4Dioxane: In Support of Summary
Information on the Integrated Risk
Information System (IRIS)
Environmental Protection
Agency (EPA).
ACTION: Notice of Public Comment
Period; extension.
AGENCY:
EPA announced a 60-day
public comment period on August 31,
2011 (76 FR 54225) for the external
review draft human health assessment
titled, ‘‘Toxicological Review of 1,4Dioxane: In Support of Summary
Information on the Integrated Risk
Information System (IRIS)’’ (EPA/635/
R–11/003). New inhalation studies
regarding the toxicity of 1,4-dioxane are
now included in the 1,4-dioxane
assessment. EPA is extending the public
comment period because of a delay in
the release of the Toxicological Review
to the public. The draft assessment was
prepared by the National Center for
Environmental Assessment (NCEA)
within the EPA Office of Research and
Development (ORD). EPA is releasing
this draft assessment solely for the
purpose of pre-dissemination peer
review under applicable information
quality guidelines. This draft
assessment has not been formally
disseminated by EPA. It does not
represent and should not be construed
to represent any Agency policy or
determination. After public review and
comment, an EPA contractor will
convene an expert panel for
independent external peer review of this
draft assessment. The public comment
period and external peer review meeting
are separate processes that provide
opportunities for all interested parties to
comment on the assessment. The
external peer review meeting will be
scheduled at a later date and announced
in the Federal Register. Public
comments submitted during the public
comment period will be provided to the
external peer reviewers before the panel
meeting and considered by EPA in the
disposition of public comments. Public
comments received after the public
comment period closes will not be
submitted to the external peer reviewers
and will only be considered by EPA if
time permits.
DATES: The public comment period will
be extended to end November 15, 2011.
Comments should be in writing and
must be received by EPA by November
15, 2011.
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
The draft ‘‘Toxicological
Review of 1,4-Dioxane: In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ is
available primarily via the Internet on
the NCEA home page under the Recent
Additions and Publications menus at
https://www.epa.gov/ncea. A limited
number of paper copies are available
from the Information Management Team
(Address: Information Management
Team, National Center for
Environmental Assessment, (Mail Code:
8601P), U.S. Environmental Protection
Agency, 1200 Pennsylvania Avenue,
NW., Washington, DC 20460; telephone:
703–347–8561; facsimile: 703–347–
8691). If you request a paper copy,
please provide your name, mailing
address, and the draft assessment title.
Comments may be submitted
electronically via https://
www.regulations.gov, by e-mail, by mail,
by facsimile, or by hand delivery/
courier. Please follow the detailed
instructions provided in the
SUPPLEMENTARY INFORMATION section of
the previous notice (76 FR 54225).
Additional Information: For
information on the docket, https://
www.regulations.gov, or the public
comment period, please contact the
Office of Environmental Information
(OEI) Docket (Mail Code: 2822T), U.S.
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460; telephone: 202–566–1752;
facsimile: 202–566–1753; or e-mail:
ORD.Docket@epa.gov.
For information on the draft
assessment, please contact Patricia
Gillespie, National Center for
Environmental Assessment [Mail Code:
B–243–01], U.S. Environmental
Protection Agency, National Center for
Environmental Assessment, Office of
Research and Development, U.S.
Environmental Protection Agency,
Research Triangle Park, NC 27711;
telephone: 919–541–1964; facsimile:
919–541–2985; or e-mail:
FRN_Questions@epa.gov.
ADDRESSES:
ENVIRONMENTAL PROTECTION
AGENCY
Dated: September 9, 2011.
Darrell A. Winner,
Acting Director, National Center for
Environmental Assessment.
[FR Doc. 2011–23818 Filed 9–15–11; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
57739
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8999–1]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/05/2011 Through 09/09/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110306, Draft EIS, USFS, CA,
Johnny O’Neil Late Successional
Reserve Habitat Restoration and Fuel
Reduction Project, Proposal to Retain
and Promote the Development of Late
Successional Habitat and Reduce the
Risk of Large, High Severity Wildfire,
Happy Camp and Oak Knoll Ranger
District, Klamath National Forest,
Siskiyou County, CA, Comment
Period Ends: 10/31/2011, Contact:
Timothy Burnett 530–493–1767.
EIS No. 20110307, Draft EIS, BLM, CO,
Colorado River Valley (formerly
known as Glenwood Springs)
Resource Management Plan,
Implementation, Colorado River
Valley Field Office, Portions of Eagle,
Garfield, Mesa, Ritkin, and Routt
Counties, CO, Comment Period Ends:
12/14/2011, Contact: John Russell
970–876–9025.
EIS No. 20110308, Final EIS, USFS, WY,
Livestock Grazing and Vegetation
Management on Five Project Area,
Proposes to Continue to Authorize
Livestock Grazing, Tongue, Medicine
Wheel/Paintrock, and Power River
Districts of the Bighorn National
Forest, Johnson, Sheridan, Big Horn
and Washakie Counties, WY, Review
Period Ends: 10/17/2011, Contact:
Laurie Walters-Clark 307–674–2627.
EIS No. 20110309, Draft EIS, BLM, CO,
Kremmling Resource Management
Plan, To Provide a Framework of
Multiple-Use and Sustained Yield
Management, in North-Central, CO,
Comment Period Ends: 12/14/2011,
Contact: Angela Glenn 303–239–3936.
EIS No. 20110310, Final EIS, FERC, WA,
Boundary Hydroelectric Project,
Application for Hydroelectric License,
FERC Project No. 2144–038 and
E:\FR\FM\16SEN1.SGM
16SEN1
57740
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
Sullivan Creek Project, Application
for Surrender of Hydropower FERC
Project No. 2225–015, Pend Oreille
County, WA, Review Period Ends: 10/
17/2011, Contact: Leonard Tao 1–
866–208–3372.
EIS No. 20110311, Draft EIS, FERC, 00,
New Jersey-New York Expansion
Project, Propose to Modify and
Expand their Existing Natural Gas
Transmission Pipeline Systems in
New Jersey, New York, and
Connecticut, Comment Period Ends:
10/31/2011, Contact: Leonard Tao 1–
866–208–3372.
EIS No. 20110312, Draft EIS, NOAA, IL,
Illinois Coastal Management Program,
To Preserve, Protect, Restore, and
Where Possible, Enhance Coastal
Resources in Illinois, Comment Period
Ends: 10/31/2011, Contact: Diana K.
Olinger 301–563–1149.
EIS No. 20110313, Draft EIS, BR, CA,
Joint Operations Center (JOC)
Relocation Project, Propose to
Construct and Operate the Permanent
JOC as a Replacement Facility for
their Current Operations on EL
Camino Avenue, Sacramento County,
CA, Comment Period Ends: 11/07/
2011, Contact: Doug Kleinsmith 916–
978–5034.
EIS No. 20110314, Draft EIS, DHS, 00,
PROGRAMMATIC—Northern Border
Activities Program, Propose to
Enhance its Program of Security along
the United States’ Northern Border
with Canada, from Maine to
Washington, Comment Period Ends:
10/31/2011, Contact: Jennifer Hass
202–344–1929,
Amended Notices
EIS No. 20110214, Draft Supplement,
USFS, ND, North Billings County
Allotment Management Plan
Revisions, Updated Information,
Proposes to Continue to Permit
Livestock Grazing on 43 Allotments,
Medora Ranger District, Dakota Prairie
Grasslands, Billings County, ND,
Comment Period Ends: 09/21/2011,
Contact: Nickole Dahl 701–227–7800.
EIS No. 20110240, Draft EIS, NPS, AK,
Denali Park Road and Preserve, Draft
Vehicle Management Plan,
Implementation, AK, Comment Period
Ends: 10/31/2011, Contact: Miriam
Valentine 907–733–9102. Revision to
FR Notice Published 07/29/2011:
Extending Comment Period from 09/
30/2011 to 10/31/2011.
EIS No. 20110303, Final EIS, FTA, CA,
Crenshaw Transit Corridor Project,
Proposes to Improve Transit Services,
Funding, Los Angeles County
Metropolitan Transportation
Authority (LACMTA), Los Angeles
County, CA, Review Period Ends: 10/
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
11/2011, Contact: Ray Tellis 213–202–
3956. The above FTA EIS should have
appeared in the 09/09/2011 Federal
Register. The 30-Day Review Period is
Calculated from 09/09/2011.
Dated: September 13, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–23828 Filed 9–15–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9464–7]
Program Requirement Revisions
Related to the Public Water System
Supervision Programs for the State of
Rhode Island and the State of Vermont
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
Notice is hereby given that
the State of Rhode Island and the State
of Vermont are in the process of revising
their respective approved Public Water
System Supervision (PWSS) programs to
meet the requirements of the Safe
Drinking Water Act (SDWA).
The State of Rhode Island has adopted
drinking water regulations for the
Arsenic Rule (66 FR 6976) promulgated
on January 22, 2001, and the revised
Public Notice Rule (65 FR 26035)
promulgated on May 4, 2000. After
review of the submitted documentation,
EPA has determined that the State of
Rhode Island’s Arsenic Rule and Public
Notice Rule are no less stringent than
the corresponding Federal regulations.
Therefore, EPA intends to approve
Rhode Island’s PWSS program revision
for these rules.
The State of Vermont has adopted
drinking water regulations for the
Interim Enhanced Surface Water
Treatment Rule (63 FR 69477)
promulgated on December 16, 1998, the
Long Term I Enhanced Surface Water
Treatment Rule (67 FR 1812)
promulgated on January 14, 2002, the
Filter Backwash Recycling Rule (66 FR
31085) promulgated on June 8, 2001, the
Arsenic Rule (66 FR 6976) promulgated
on January 22, 2001, the Stage 1
Disinfectant and Disinfection Byproduct
Rule (63 FR 69389) promulgated on
December 16, 1998, and the
Radionuclides Rule (FR 65 76708–
76753) promulgated on December 7,
2000. After review of the submitted
documentation, EPA has determined
that these rules are no less stringent
than the corresponding Federal
SUMMARY:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
regulations. Therefore, EPA intends to
approve Vermont’s PWSS program
revision for these rules.
DATES: All interested parties may
request a public hearing for any of the
above EPA determinations. A request for
a public hearing must be submitted
within thirty (30) days of this Federal
Register publication date to the
Regional Administrator at the address
shown below. Frivolous or insubstantial
requests for a hearing may be denied by
the Regional Administrator.
However, if a substantial request for a
public hearing is made by this date, a
public hearing will be held. If no timely
and appropriate request for a hearing is
received, and the Regional
Administrator does not elect to hold a
hearing on his/her own motion, this
determination shall become final and
effective 30 days after the publication of
this Federal Register Notice.
Any request for a public hearing shall
include the following information: (1)
The name, address, and telephone
number of the individual organization,
or other entity requesting a hearing; (2)
a brief statement of the requesting
person’s interest in the Regional
Administrator’s determination; (3)
information that the requesting person
intends to submit at such hearing; and
(4) the signature of the individual
making the request, or if the request is
made on behalf of an organization or
other entity, the signature of a
responsible official of the organization
or other entity.
ADDRESSES: All documents relating to
this determination are available for
inspection between the hours of 8:30
a.m. and 4 p.m., Monday through
Friday, at the following office(s):
U.S. Environmental Protection Agency,
Office of Ecosystem Protection, 5 Post
Office Square, Suite 100, Boston, MA
02109–3912.
For documents specific to that State:
Rhode Island Department of Public
Health, Division of Drinking Water
Quality, 3 Capitol Hill, Providence, RI
02908–5097.
Vermont Department of Environmental
Conservation, Water Supply Division,
Agency of Natural Resources, 103
South Main Street, Old Pantry
Building, Waterbury, VT 05671–0403.
FOR FURTHER INFORMATION CONTACT:
Stafford Madison, U.S. EPA–New
England, Office of Ecosystem Protection
(telephone 617–918–1622).
Authority: Section 1401 (42 U.S.C. 300f)
and Section 1413 (42 U.S.C. 300g–2) of the
Safe Drinking Water Act, as amended (1996),
and (40 CFR 142.10) of the National Primary
Drinking Water Regulations.
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 76, Number 180 (Friday, September 16, 2011)]
[Notices]
[Pages 57739-57740]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23828]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8999-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/05/2011 Through 09/09/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110306, Draft EIS, USFS, CA, Johnny O'Neil Late Successional
Reserve Habitat Restoration and Fuel Reduction Project, Proposal to
Retain and Promote the Development of Late Successional Habitat and
Reduce the Risk of Large, High Severity Wildfire, Happy Camp and Oak
Knoll Ranger District, Klamath National Forest, Siskiyou County, CA,
Comment Period Ends: 10/31/2011, Contact: Timothy Burnett 530-493-1767.
EIS No. 20110307, Draft EIS, BLM, CO, Colorado River Valley (formerly
known as Glenwood Springs) Resource Management Plan, Implementation,
Colorado River Valley Field Office, Portions of Eagle, Garfield, Mesa,
Ritkin, and Routt Counties, CO, Comment Period Ends: 12/14/2011,
Contact: John Russell 970-876-9025.
EIS No. 20110308, Final EIS, USFS, WY, Livestock Grazing and Vegetation
Management on Five Project Area, Proposes to Continue to Authorize
Livestock Grazing, Tongue, Medicine Wheel/Paintrock, and Power River
Districts of the Bighorn National Forest, Johnson, Sheridan, Big Horn
and Washakie Counties, WY, Review Period Ends: 10/17/2011, Contact:
Laurie Walters-Clark 307-674-2627.
EIS No. 20110309, Draft EIS, BLM, CO, Kremmling Resource Management
Plan, To Provide a Framework of Multiple-Use and Sustained Yield
Management, in North-Central, CO, Comment Period Ends: 12/14/2011,
Contact: Angela Glenn 303-239-3936.
EIS No. 20110310, Final EIS, FERC, WA, Boundary Hydroelectric Project,
Application for Hydroelectric License, FERC Project No. 2144-038 and
[[Page 57740]]
Sullivan Creek Project, Application for Surrender of Hydropower FERC
Project No. 2225-015, Pend Oreille County, WA, Review Period Ends: 10/
17/2011, Contact: Leonard Tao 1-866-208-3372.
EIS No. 20110311, Draft EIS, FERC, 00, New Jersey-New York Expansion
Project, Propose to Modify and Expand their Existing Natural Gas
Transmission Pipeline Systems in New Jersey, New York, and Connecticut,
Comment Period Ends: 10/31/2011, Contact: Leonard Tao 1-866-208-3372.
EIS No. 20110312, Draft EIS, NOAA, IL, Illinois Coastal Management
Program, To Preserve, Protect, Restore, and Where Possible, Enhance
Coastal Resources in Illinois, Comment Period Ends: 10/31/2011,
Contact: Diana K. Olinger 301-563-1149.
EIS No. 20110313, Draft EIS, BR, CA, Joint Operations Center (JOC)
Relocation Project, Propose to Construct and Operate the Permanent JOC
as a Replacement Facility for their Current Operations on EL Camino
Avenue, Sacramento County, CA, Comment Period Ends: 11/07/2011,
Contact: Doug Kleinsmith 916-978-5034.
EIS No. 20110314, Draft EIS, DHS, 00, PROGRAMMATIC--Northern Border
Activities Program, Propose to Enhance its Program of Security along
the United States' Northern Border with Canada, from Maine to
Washington, Comment Period Ends: 10/31/2011, Contact: Jennifer Hass
202-344-1929,
Amended Notices
EIS No. 20110214, Draft Supplement, USFS, ND, North Billings County
Allotment Management Plan Revisions, Updated Information, Proposes to
Continue to Permit Livestock Grazing on 43 Allotments, Medora Ranger
District, Dakota Prairie Grasslands, Billings County, ND, Comment
Period Ends: 09/21/2011, Contact: Nickole Dahl 701-227-7800.
EIS No. 20110240, Draft EIS, NPS, AK, Denali Park Road and Preserve,
Draft Vehicle Management Plan, Implementation, AK, Comment Period Ends:
10/31/2011, Contact: Miriam Valentine 907-733-9102. Revision to FR
Notice Published 07/29/2011: Extending Comment Period from 09/30/2011
to 10/31/2011.
EIS No. 20110303, Final EIS, FTA, CA, Crenshaw Transit Corridor
Project, Proposes to Improve Transit Services, Funding, Los Angeles
County Metropolitan Transportation Authority (LACMTA), Los Angeles
County, CA, Review Period Ends: 10/11/2011, Contact: Ray Tellis 213-
202-3956. The above FTA EIS should have appeared in the 09/09/2011
Federal Register. The 30-Day Review Period is Calculated from 09/09/
2011.
Dated: September 13, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-23828 Filed 9-15-11; 8:45 am]
BILLING CODE 6560-50-P