Notice of Application Tendered for Filing With the Commission, Accepted for Filing With the Commission, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, Intent To Waive Solicitation of Additional Study Requests, Intent To Waive Scoping, Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, and Establishing an Expedited Schedule for Processing; Whitman River Dam, Inc., 57724-57725 [2011-23794]
Download as PDF
57724
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13237–003]
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice of Application Tendered for
Filing With the Commission, Accepted
for Filing With the Commission,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, Intent To Waive Solicitation
of Additional Study Requests, Intent
To Waive Scoping, Soliciting
Comments, Terms and Conditions,
Recommendations, and Prescriptions,
and Establishing an Expedited
Schedule for Processing; Whitman
River Dam, Inc.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
Minor License.
b. Project No.: 13237–003.
c. Date Filed: August 29, 2011.
d. Applicant: Whitman River Dam,
Inc.
e. Name of Project: Crocker Dam
Hydro Project.
f. Location: On the Whitman River, in
the Town of Westminster, Worcester
County, Massachusetts. The project
would not occupy lands of the United
States.
g. Filed Pursuant to: 18 CFR 4.61 of
the Commission’s regulations.
h. Applicant Contact: Robert T.
Francis, P.O. Box 145, 10 Tommy
Francis Road, Westminster, MA 01473,
(978) 874–1010, bfrancis@verizon.net.
i. FERC Contact: Jeff Browning, (202)
502–8677, or e-mail at
Jeffrey.Browning@ferc.gov.
j. Deadline for Filing Motions to
Intervene And Protests, Comments,
Terms and Conditions,
Recommendations, and Prescriptions:
60 days from the issuance date of this
notice; reply comments are due 105
days from the issuance date of this
notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The Crocker
Dam Hydro Project would consist of: (1)
The existing 520-foot-long, 38.5-foothigh earthen embankment and masonry
Crocker Pond dam equipped with a 120foot-long arched spillway section
topped with 26-inch-high wooden
flashboards; (2) an existing 110 acre
impoundment with a normal water
surface elevation of 752.66 feet above
mean sea level; (3) an existing 8-footwide, 12-foot-high floodgate located
between the spillway and gate house; (4)
an existing 3-foot-wide, 3-foot-high mud
gate located at the spillway toe adjacent
to the flood gate; (5) an existing gate
house equipped with an existing 42inch-diameter penstock; (6) a new 23foot-long, 42-inch-penstock extension;
(7) a new powerhouse containing one
145-kilowatt turbine generating unit;
and (8) a new 480-volt (V), 40-foot-long
buried transmission line from the
powerhouse to an existing power pole
connected to a new 480–V, 200-footlong above-ground transmission line to
the regional grid interconnection. The
proposed project is estimated to
generate an average of 887,450 kilowatthours annually.
m. Due to the project works already
existing and the limited scope of
proposed rehabilitation of the project
site described above, the applicant’s
close coordination with Federal and
state agencies during the preparation of
the application, and completed studies
during pre-filing consultation, we
intend to waive scoping, shorten the
notice filing period, and expedite the
review process. Based on a review of the
application, resource agency
consultation letters, and comments filed
to date, Commission staff intends to
prepare a single environmental
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
assessment (EA). Commission staff
determined that the issues that need to
be addressed in its EA have been
adequately identified during the prefiling period, which included a public
meeting and site visit, and no new
issues are likely to be identified through
additional scoping. The EA will
consider assessing the potential effects
of project construction and operation on
geology and soils, aquatic, terrestrial,
threatened and endangered species,
recreation and land use, aesthetic, and
cultural and historic resources.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Cooperating Agencies: We are
asking Federal, state, and local agencies
and Indian Tribes with jurisdiction and/
or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in item p below.
Cooperating agencies should note the
Commission’s policy that agencies that
cooperate in the preparation of the
environmental document cannot also
intervene. See 94 FERC ¶ 61,076 (2001).
p. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
E:\FR\FM\16SEN1.SGM
16SEN1
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
q. Procedural Schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate (e.g., if scoping
is waived, the schedule would be
shortened).
Milestone
Notice of the availability of
the EA.
Target date
February 2012.
Dated: September 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–23794 Filed 9–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–115–000.
Applicants: Black River Generation,
LLC, ReEnergy Black River LLC.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedition and Certain Waivers of Black
River Generation, LLC and ReEnergy
Black River LLC.
Filed Date: 09/07/2011.
Accession Number: 20110907–5102.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Take notice that the Commission
received the following electric rate
filings:
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
Docket Numbers: ER11–3163–001.
Applicants: Kansas Energy LLC.
Description: Kansas Energy LLC
submits tariff filing per 35: Notice of
Non-Material Change in Status and
Tariff Amendment to be effective 11/7/
2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5036.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–3880–001.
Applicants: Vermont Transco, LLC.
Description: Vermont Transco, LLC
submits tariff filing per 35: Vermont
Transco 1991 Transmission Agreement
Compliance Filing to be effective 7/1/
2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5044.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4200–001.
Applicants: New York Independent
System Operator, Inc.
Description: Motion of New York
Independent System Operator, Inc. in
Opposition to Amendment and, in the
Alternative, Answer; and Motion
Seeking Waiver of Tariff Requirements
Regarding Black Start Service.
Filed Date: 09/02/2011.
Accession Number: 20110902–5152.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 13, 2011.
Docket Numbers: ER11–4445–000.
Applicants: Black Hills Power, Inc.
Description: Black Hills Power, Inc.
submits tariff filing per 35.15:
Cancellation (Complete Tariff ID) to be
effective 9/6/2011.
Filed Date: 09/06/2011.
Accession Number: 20110906–5136.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4446–000.
Applicants: Northern States Power
Company, a Wisconsin.
Description: Northern States Power
Company, a Wisconsin corporation
submits tariff filing per 35:
20110906_Compliance Filing to be
effective 8/11/2010.
Filed Date: 09/06/2011.
Accession Number: 20110906–5156.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4447–000.
Applicants: Mac Trading, Inc.
Description: Mac Trading, Inc.
submits tariff filing per 35.1: Rate
Schedule FERC No. 1 to be effective 9/
7/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5044.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4448–000.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
57725
Applicants: AEP Texas Central
Company.
Description: AEP Texas Central
Company submits tariff filing per
35.13(a)(2)(iii: 20110907 TCC–South
Texas Electric Coop Amended &
Restated IA to be effective 8/18/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5049.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4449–000.
Applicants: Starion Energy Inc.
Description: Starion Energy Inc.
submits tariff filing per 35.1: MarketBased Rate Tariff Baseline to be effective
9/7/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5068.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4450–000.
Applicants: Starion Energy NY, Inc.
Description: Starion Energy NY, Inc.
submits tariff filing per 35.1: MarketBased Rate Tariff Baseline to be effective
9/7/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5073.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4451–000.
Applicants: Santanna Energy
Services.
Description: Santanna Energy Services
submits tariff filing per 35.12: Market
Based Rates Tariff to be effective 9/30/
2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5074.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4452–000.
Applicants: Buy Energy Direct LLC.
Description: Buy Energy Direct LLC
submits tariff filing per 35.1: BASE LINE
FILLING to be effective 9/7/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5076.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4453–000.
Applicants: Santanna Energy
Services.
Description: Santanna Energy Services
submits tariff filing per 35.12: Market
Based Rates Tariff to be effective 9/30/
2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5081.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4454–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc
submits the Average System Cost Rate
Filing for FY 2012–2013 under ER11–
4454.
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 76, Number 180 (Friday, September 16, 2011)]
[Notices]
[Pages 57724-57725]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23794]
[[Page 57724]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13237-003]
Notice of Application Tendered for Filing With the Commission,
Accepted for Filing With the Commission, Soliciting Motions To
Intervene and Protests, Ready for Environmental Analysis, Intent To
Waive Solicitation of Additional Study Requests, Intent To Waive
Scoping, Soliciting Comments, Terms and Conditions, Recommendations,
and Prescriptions, and Establishing an Expedited Schedule for
Processing; Whitman River Dam, Inc.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Minor License.
b. Project No.: 13237-003.
c. Date Filed: August 29, 2011.
d. Applicant: Whitman River Dam, Inc.
e. Name of Project: Crocker Dam Hydro Project.
f. Location: On the Whitman River, in the Town of Westminster,
Worcester County, Massachusetts. The project would not occupy lands of
the United States.
g. Filed Pursuant to: 18 CFR 4.61 of the Commission's regulations.
h. Applicant Contact: Robert T. Francis, P.O. Box 145, 10 Tommy
Francis Road, Westminster, MA 01473, (978) 874-1010,
bfrancis@verizon.net.
i. FERC Contact: Jeff Browning, (202) 502-8677, or e-mail at
Jeffrey.Browning@ferc.gov.
j. Deadline for Filing Motions to Intervene And Protests, Comments,
Terms and Conditions, Recommendations, and Prescriptions: 60 days from
the issuance date of this notice; reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. Project Description: The Crocker Dam Hydro Project would consist
of: (1) The existing 520-foot-long, 38.5-foot-high earthen embankment
and masonry Crocker Pond dam equipped with a 120-foot-long arched
spillway section topped with 26-inch-high wooden flashboards; (2) an
existing 110 acre impoundment with a normal water surface elevation of
752.66 feet above mean sea level; (3) an existing 8-foot-wide, 12-foot-
high floodgate located between the spillway and gate house; (4) an
existing 3-foot-wide, 3-foot-high mud gate located at the spillway toe
adjacent to the flood gate; (5) an existing gate house equipped with an
existing 42-inch-diameter penstock; (6) a new 23-foot-long, 42-inch-
penstock extension; (7) a new powerhouse containing one 145-kilowatt
turbine generating unit; and (8) a new 480-volt (V), 40-foot-long
buried transmission line from the powerhouse to an existing power pole
connected to a new 480-V, 200-foot-long above-ground transmission line
to the regional grid interconnection. The proposed project is estimated
to generate an average of 887,450 kilowatt-hours annually.
m. Due to the project works already existing and the limited scope
of proposed rehabilitation of the project site described above, the
applicant's close coordination with Federal and state agencies during
the preparation of the application, and completed studies during pre-
filing consultation, we intend to waive scoping, shorten the notice
filing period, and expedite the review process. Based on a review of
the application, resource agency consultation letters, and comments
filed to date, Commission staff intends to prepare a single
environmental assessment (EA). Commission staff determined that the
issues that need to be addressed in its EA have been adequately
identified during the pre-filing period, which included a public
meeting and site visit, and no new issues are likely to be identified
through additional scoping. The EA will consider assessing the
potential effects of project construction and operation on geology and
soils, aquatic, terrestrial, threatened and endangered species,
recreation and land use, aesthetic, and cultural and historic
resources.
n. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCONlineSupport@ferc.gov.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
o. Cooperating Agencies: We are asking Federal, state, and local
agencies and Indian Tribes with jurisdiction and/or special expertise
with respect to environmental issues to cooperate with us in the
preparation of the environmental document. Agencies who would like to
request cooperating status should follow the instructions for filing
comments described in item p below.
Cooperating agencies should note the Commission's policy that
agencies that cooperate in the preparation of the environmental
document cannot also intervene. See 94 FERC ] 61,076 (2001).
p. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,''
``REPLY COMMENTS,''
[[Page 57725]]
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
q. Procedural Schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate (e.g., if scoping is waived, the schedule
would be shortened).
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of the availability of the EA.... February 2012.
------------------------------------------------------------------------
Dated: September 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-23794 Filed 9-15-11; 8:45 am]