Take Notice That the Commission Has Received the Following Natural Gas Pipeline Rate and Refund Report Filings:, 57726-57727 [2011-23749]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
57726
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
Filed Date: 09/07/2011.
Accession Number: 20110907–0203.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4455–000.
Applicants: Thornwood Management
Company, LLC.
Description: Thornwood Management
Company LLC submits a notice of
cancellation under ER11–4455.
Filed Date: 09/07/2011.
Accession Number: 20110907–0202.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4456–000.
Applicants: PJM Interconnection,
LLC, American Electric Power Service
Corporation.
Description: PJM Interconnection,
LLC submits tariff filing per
35.13(a)(2)(iii: AEPSC submits SA No.
1336—28th Revised ILDSA among
AEPSC & Buckeye to be effective 3/8/
2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5112.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4457–000.
Applicants: PSEG Energy Resources &
Trade LLC.
Description: PSEG Energy Resources &
Trade LLC submits tariff filing per 35:
Compliance Filing Pursuant to Section
205 of the Federal Power Act to be
effective 9/7/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5116.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4458–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
G645 Amended GIA to be effective 9/8/
2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5133.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4459–000.
Applicants: El Paso Electric Company.
Description: El Paso Electric Company
submits tariff filing per 35.13(a)(2)(iii:
Revisions to OATT Attachment M to be
effective 11/1/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5142.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4460–000.
Applicants: Rocky Mountain Reserve
Group.
Description: Rocky Mountain Reserve
Group submits tariff filing per 35.1:
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
20110907_RMRG Bylaws to be effective
11/6/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5147.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4461–000.
Applicants: Black Hills Power, Inc.
Description: Black Hills Power, Inc.
submits tariff filing per 35.1: JOATT
Baseline to be effective 9/30/2010.
Filed Date: 09/07/2011.
Accession Number: 20110907–5148.
Comment Date: 5 p.m. Eastern Time
on Wednesday, September 28, 2011.
Docket Numbers: ER11–4462–000.
Applicants: NEPM II, LLC.
Description: NEPM II, LLC submits
tariff filing per 35.12: NEPM II, LLC
MBR Tariff to be effective 11/1/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5000.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4463–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: SGIA WDT SERV
SCE–Photon Solar 9000–9001 9th St
Rancho Roof Top Solar Project to be
effective 9/9/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5001.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4464–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: SGIA WDT SERV
SCE–Photon Solar 8449 Miliken Rancho
Roof Top Solar Project to be effective 9/
9/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5002.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4465–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: SGIA WDT SERV
SCE–Photon Solar Ellipse Foothill
Ranch Roof Top Solar Project to be
effective 9/9/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5003.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4466–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
per 35.13(a)(2)(iii: SGIA WDT SERV
SCE–Photon Solar 6201–6251 Knott
Buena Park Roof Top Solar Project to be
effective 9/9/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5004.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
Docket Numbers: ER11–4467–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits tariff filing per 35.13(a)(2)(iii:
Market Rule 1 Appendix A Clean-up
Filing to be effective 9/8/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5042.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 29, 2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 8, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–23748 Filed 9–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Take Notice That the Commission Has
Received the Following Natural Gas
Pipeline Rate and Refund Report
Filings:
Filings Instituting Proceedings
Docket Numbers: RP11–2558–000.
Applicants: Big Sandy Pipeline, LLC.
Description: Big Sandy Pipeline, LLC
submits tariff filing per 154.204: 2011–
09–01 Negotiated Rate Agreements—
EQT Energy to be effective 9/1/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5021.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 20, 2011.
E:\FR\FM\16SEN1.SGM
16SEN1
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP11–2442–001.
Applicants: Central Kentucky
Transmission Company.
Description: Central Kentucky
Transmission Company submits tariff
filing per 154.205(b): ACA Errata 2011
to be effective 10/1/2011.
Filed Date: 09/01/2011.
Accession Number: 20110901–5201.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 13, 2011.
Docket Numbers: RP11–2469–001.
Applicants: Eastern Shore Natural Gas
Company.
Description: Eastern Shore Natural
Gas Company submits tariff filing per
154.205(b): 2011 ACA Revised to be
effective 10/1/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5146.
Comment Date: 5 p.m. Eastern Time
on Monday, September 19, 2011.
Docket Numbers: RP11–2470–001.
Applicants: Transcontinental Gas
Pipe Line Company, LLC
Description: Transcontinental Gas
Pipe Line Company, LLC submits tariff
filing per 154.205(b): Pascagoula
Expansion Non-Conforming
Superseding Service Agreement to be
effective 9/30/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907–5129.
Comment Date: 5 p.m. Eastern Time
on Monday, September 19, 2011.
Docket Numbers: RP11–2308–002.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Algonquin Gas
Transmission, LLC submits tariff filing
per 154.203: Winter Operations
Compliance Filing to be effective 9/1/
2011.
Filed Date: 09/08/2011.
Accession Number: 20110908–5043.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 20, 2011.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: September 8, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–23749 Filed 9–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos., 13010–002 Mississippi 8
Hydro, LLC and 14272–000 FFP Project 98,
LLC]
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On September 1, 2011, Mississippi 8
Hydro, LLC (Mississippi 8) and FFP
Project 98, LLC (FFP) filed preliminary
permit applications pursuant to section
4(f) of the Federal Power Act (FPA)
proposing to study the feasibility of the
Mississippi River Lock and Dam No. 8
Hydroelectric Project (Lock and Dam #8
Project or project), to be located on the
Mississippi River, near the town of
Vernon, in Houston County, Wisconsin,
at the U.S. Army Corps of Engineers’
(Corps) Mississippi River Lock and Dam
No. 8. The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
Mississippi 8’s proposed Lock and
Dam #8 Project No. 13010 would consist
of: (1) A new 30-foot-long by 40-footwide powerhouse; (2) 20 very low head
(VLH) type hydraulic turbines rated for
500 kilowatts (kW) each to produce a
combined total installed capacity of 5
megawatts (MW); (3) a design flow of
706 cubic feet per second (cfs) and an
operating range from a minimum of 300
cfs up to a maximum of 725 cfs, at 4.6
feet of net head; (4) a tailrace, which
would include a submerged dike to
redirect flow as it exits the tailrace; (5)
a project storage yard; (6) a concrete
intake structure; (7) a substation
containing step-up transformers, circuit
breakers, and disconnect switches; (8) a
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
57727
new power pole to re-route an existing
69-kilovolt (kV) transmission line to the
substation; and (9) a 500-volt (V) power
line to conduct electricity from the
turbines to the control house. The
estimated annual generation of the
project would be 35.6 gigawatt-hours
(GWh). The project would utilize
released flows from Lock and Dam #8 as
directed by the Corps.
Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics LLC, 371
Upper Terrace, Suite 2, Bend, OR 97702;
phone: (541) 330–8779.
FFP is exploring two concepts for its
proposed Lock and Dam #8 Project No.
14272. Concept A would consist of: (1)
Four horizontal bulb turbine generators,
with a combined generation capacity of
14.4 MW, placed in a newly proposed
240-foot by 275-foot powerhouse
located on the west bank of the river; (2)
a 40-foot by 55-foot control building
located on the west end of the dam; (3)
a 320-foot-long transmission line
extending south from a newly proposed
60-foot by 50-foot substation located
adjacent to the control building, to an
existing transmission line located south
of the project; (4) a new 370-foot by 880foot tailrace channel connecting the
powerhouse to the river downstream; (5)
a new 350-foot by 950-foot approach
channel located upstream of the
powerhouse; and (6) use of an existing
access road for access to the project.
Concept B would integrate 40
inclined access bulb turbine generators
rated at 0.37 MW each into the gate bays
of the existing moveable dam section to
produce a combined total installed
capacity of 14.8 MW. Concept B would
involve construction of the control
building, transmission line, and use of
the existing access road, but would not
include the construction of a new
powerhouse, approach channel, or
tailrace. The estimated average annual
generation of concept A would be 85
GWh, and the estimated average annual
generation of concept B would be 80
GWh.
Applicant Contact: Mr. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114; (978) 283–2822.
FERC Contact: Lesley Kordella;
phone: (202) 502–6406.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 76, Number 180 (Friday, September 16, 2011)]
[Notices]
[Pages 57726-57727]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23749]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Take Notice That the Commission Has Received the Following
Natural Gas Pipeline Rate and Refund Report Filings:
Filings Instituting Proceedings
Docket Numbers: RP11-2558-000.
Applicants: Big Sandy Pipeline, LLC.
Description: Big Sandy Pipeline, LLC submits tariff filing per
154.204: 2011-09-01 Negotiated Rate Agreements--EQT Energy to be
effective 9/1/2011.
Filed Date: 09/08/2011.
Accession Number: 20110908-5021.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 20, 2011.
[[Page 57727]]
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP11-2442-001.
Applicants: Central Kentucky Transmission Company.
Description: Central Kentucky Transmission Company submits tariff
filing per 154.205(b): ACA Errata 2011 to be effective 10/1/2011.
Filed Date: 09/01/2011.
Accession Number: 20110901-5201.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 13, 2011.
Docket Numbers: RP11-2469-001.
Applicants: Eastern Shore Natural Gas Company.
Description: Eastern Shore Natural Gas Company submits tariff
filing per 154.205(b): 2011 ACA Revised to be effective 10/1/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907-5146.
Comment Date: 5 p.m. Eastern Time on Monday, September 19, 2011.
Docket Numbers: RP11-2470-001.
Applicants: Transcontinental Gas Pipe Line Company, LLC
Description: Transcontinental Gas Pipe Line Company, LLC submits
tariff filing per 154.205(b): Pascagoula Expansion Non-Conforming
Superseding Service Agreement to be effective 9/30/2011.
Filed Date: 09/07/2011.
Accession Number: 20110907-5129.
Comment Date: 5 p.m. Eastern Time on Monday, September 19, 2011.
Docket Numbers: RP11-2308-002.
Applicants: Algonquin Gas Transmission, LLC.
Description: Algonquin Gas Transmission, LLC submits tariff filing
per 154.203: Winter Operations Compliance Filing to be effective 9/1/
2011.
Filed Date: 09/08/2011.
Accession Number: 20110908-5043.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 20, 2011.
Any person desiring to protest in any the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5 p.m. Eastern time on the specified comment
date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated: September 8, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-23749 Filed 9-15-11; 8:45 am]