Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Pacific Gas and Electric Company, 57732 [2011-23738]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
57732
Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices
Oregon. The existing McKay dam was
built and operated by the U.S. Bureau of
Reclamation (Reclamation). The project
would occupy land within the McKay
Creek National Wildlife Refuge. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would utilize
flows at the existing McKay reservoir,
and would consist of the following new
features: (1) A 48-inch diameter, 250foot-long steel-reinforced plastic pipe
penstock; (2) a 40-foot by 30-foot
concrete powerhouse containing a 3megawatt turbine/generator; (3) an
approximately 2,000-foot-long, 12.5kilovolt transmission line
interconnecting to a local utility line;
and (4) appurtenant facilities. The
estimated annual generation of the
project would be 7.4 gigawatt-hours.
Applicant Contact: Carl Spetzler,
McKay Dam Hydropower, LLC, 745
Emerson Street, Palo Alto, CA 94301,
phone (650) 475–4467.
FERC Contact: Patrick Murphy,
phone: (202) 502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
VerDate Mar<15>2010
16:26 Sep 15, 2011
Jkt 223001
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14205–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–23739 Filed 9–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–13221–001]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Pacific Gas and Electric
Company
On September 1, 2011, Pacific Gas
and Electric Company filed an
application for a successive preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Mokelumne
Pumped Storage Project to be located on
the North Fork Mokelumne River, Bear
River, and Cole Creek, in Amador and
Calaveras Counties, California. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) Using the existing
Lower Bear River reservoir, with a
surface area of 746 acres, storage
capacity of 49,079 acre-feet, and normal
water surface elevation of 5,822 feet
mean sea level (msl), as the upper
reservoir, with the possibility of a dam
raise to increase capacity; (2) a 16,000foot-long power tunnel including intake
structure and penstock; (3) the existing
Salt Springs reservoir, with a surface
area of 960 acres, storage capacity of
141,817 acre-feet, and a normal water
surface elevation of 3,959 feet msl, as
the lower reservoir; (4) a powerhouse
with a total installed capacity from 300
to 1,200 megawatts; and (5) a 230- or
500-kilovolt overhead transmission line.
The annual electrical production would
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
be between 396 and 1,584 gigawatthours.
Besides the proposed use of the
existing Lower Bear River Reservoir as
the upper reservoir, PG&E also plans to
continue studying two alternatives: (1)
The existing Upper Bear River reservoir;
and (2) a new reservoir on Cole Creek.
Applicant Contact: Mr. Randy
Livingstone, Pacific Gas and Electric
Company, 245 Market Street, MC N11E–
1137, San Francisco, CA 94105–1702,
Phone (415) 973–6950, and Ms. Annette
Faraglia, Pacific Gas and Electric
Company, 77 Beale Street, MC B30A–
2479, San Francisco, CA 94105–1814,
phone (415) 973–7145.
FERC Contact: Jim Fargo; phone: (202)
502–6095.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13221–001) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–23738 Filed 9–15–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 76, Number 180 (Friday, September 16, 2011)]
[Notices]
[Page 57732]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23738]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-13221-001]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
Pacific Gas and Electric Company
On September 1, 2011, Pacific Gas and Electric Company filed an
application for a successive preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA), proposing to study the feasibility
of the Mokelumne Pumped Storage Project to be located on the North Fork
Mokelumne River, Bear River, and Cole Creek, in Amador and Calaveras
Counties, California. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) Using the
existing Lower Bear River reservoir, with a surface area of 746 acres,
storage capacity of 49,079 acre-feet, and normal water surface
elevation of 5,822 feet mean sea level (msl), as the upper reservoir,
with the possibility of a dam raise to increase capacity; (2) a 16,000-
foot-long power tunnel including intake structure and penstock; (3) the
existing Salt Springs reservoir, with a surface area of 960 acres,
storage capacity of 141,817 acre-feet, and a normal water surface
elevation of 3,959 feet msl, as the lower reservoir; (4) a powerhouse
with a total installed capacity from 300 to 1,200 megawatts; and (5) a
230- or 500-kilovolt overhead transmission line. The annual electrical
production would be between 396 and 1,584 gigawatt-hours.
Besides the proposed use of the existing Lower Bear River Reservoir
as the upper reservoir, PG&E also plans to continue studying two
alternatives: (1) The existing Upper Bear River reservoir; and (2) a
new reservoir on Cole Creek.
Applicant Contact: Mr. Randy Livingstone, Pacific Gas and Electric
Company, 245 Market Street, MC N11E-1137, San Francisco, CA 94105-1702,
Phone (415) 973-6950, and Ms. Annette Faraglia, Pacific Gas and
Electric Company, 77 Beale Street, MC B30A-2479, San Francisco, CA
94105-1814, phone (415) 973-7145.
FERC Contact: Jim Fargo; phone: (202) 502-6095.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13221-001) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: September 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-23738 Filed 9-15-11; 8:45 am]
BILLING CODE 6717-01-P