Sunshine Act Meeting Notice, 56748-56749 [2011-23641]
Download as PDF
56748
Federal Register / Vol. 76, No. 178 / Wednesday, September 14, 2011 / Notices
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 06, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–23406 Filed 9–13–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–114–000.
Applicants: Mississippi Power
Company.
Description: Mississippi Power
Company submits application for the
approval of the purchase of existing
generation facilities.
Filed Date: 09/02/2011.
Accession Number: 20110906–0202.
Comment Date: 5 p.m. Eastern Time
on Friday, September 23, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4439–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: Amend Standard
LGIA Desert Sunlight Project to be
effective 9/7/2011.
Filed Date: 09/06/2011.
Accession Number: 20110906–5000.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4440–000.
Applicants: KAP Analytics, LLC.
Description: KAP Analytics, LLC
submits tariff filing per 35.12: KAP
Analytics, LLC FERC Electric MBR
Tariff to be effective 10/1/2011.
Item No.
Filed Date: 09/06/2011.
Accession Number: 20110906–5001.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4442–000.
Applicants: Wabash Valley Power
Association, Inc.
Description: Wabash Valley Power
Association, Inc. submits tariff filing per
35.13(a)(2)(iii: Amendment to add
MISO/PJM Riders to be effective 1/1/
2012.
Filed Date: 09/06/2011.
Accession Number: 20110906–5040.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4443–000.
Applicants: AK Electric Supply, LLC.
Description: AK Electric Supply, LLC
submits tariff filing per 35.1: AK Steel
MBR to be effective 9/6/2011.
Filed Date: 09/06/2011.
Accession Number: 20110906–5096.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
Docket Numbers: ER11–4444–000.
Applicants: Magnolia Energy LP.
Description: Magnolia Energy LP
submits tariff filing per 35.15:
Cancellation of Market-Based Rate
Tariff to be effective 9/7/2011.
Filed Date: 09/06/2011.
Accession Number: 20110906–5131.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 27, 2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
Docket No.
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 06, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–23405 Filed 9–13–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
September 8, 2011.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: September 15, 2011,
10 a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, D.C. 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
Note: Items listed on the agenda may be
deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
973RD—Meeting
Regular Meeting
September 15, 2011; 10 a.m.
Company
mstockstill on DSK4VPTVN1PROD with NOTICES
Administrative
A–1
A–2
A–3
A–4
......................
......................
......................
......................
AD02–1–000 ...........................................
AD02–7–000 ...........................................
OMITTED.
AD11–9–000 ...........................................
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Report on Outages and Curtailments During the Southwest Cold Weather Event
of February 1–5, 2011.
Electric
E–1 ......................
E–2 ......................
VerDate Mar<15>2010
RM11–11–000 .........................................
OMITTED.
19:00 Sep 13, 2011
Jkt 223001
PO 00000
Frm 00019
Version 4 Critical Infrastructure Protection Reliability Standards.
Fmt 4703
Sfmt 4703
E:\FR\FM\14SEN1.SGM
14SEN1
Federal Register / Vol. 76, No. 178 / Wednesday, September 14, 2011 / Notices
56749
Item No.
Docket No.
Company
E–3 ......................
E–4 ......................
E–5 ......................
RM08–13–004 .........................................
RM10–6–000 ...........................................
RM10–29–000 .........................................
E–6 ......................
E–7 ......................
E–8 ......................
E–9 ......................
E–10 ....................
E–11 ....................
E–12 ....................
E–13 ....................
E–14 ....................
RM11–16–000 .........................................
RD11–7–000 ...........................................
ER11–3970–000 .....................................
TS11–5–000 ............................................
ER11–3967–000 .....................................
ER11–3064–001 .....................................
ER11–3972–000 .....................................
ER11–3953–000 .....................................
ER11–2224–004 .....................................
ER11–2224–005 .....................................
ER11–2224–009 .....................................
ER11–3949–000 .....................................
ER11–3949–001
ER11–3951–000
ER11–3973–000 .....................................
EL11–12–002 ..........................................
Transmission Relay Loadability Reliability Standard.
Interpretation of Transmission Planning Reliability Standard.
Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard.
Transmission Relay Loadability Reliability Standard.
North American Electric Reliability Corporation.
Midwest Independent Transmission System Operator, Inc.
Bangor Hydro Electric Company.
Southwest Power Pool, Inc.
PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company.
PJM Interconnection, L.L.C.
ISO New England Inc. and New England Power Pool.
New York Independent System Operator, Inc.
E–15 ....................
E–16 ....................
E–17 ....................
New York Independent System Operator, Inc.
California Independent System Operator Corporation.
Idaho Wind Partners 1, LLC.
Gas
G–1 .....................
RM11–4–000 ...........................................
Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies.
Hydro
H–1 .....................
H–2 .....................
H–3 .....................
P–2698–050 ............................................
P–2686–062
P–13681–002 ..........................................
DI10–9–001 .............................................
Duke Energy Carolinas, LLC.
Grand Coulee Project Hydroelectric Authority.
Woodland Pulp LLC.
Certificates
C–1 .....................
mstockstill on DSK4VPTVN1PROD with NOTICES
C–2 .....................
CP11–30–000 .........................................
CP11–41–000 .........................................
CP10–510–000 .......................................
A free webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to https://www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The event will
contain a link to its webcast. The
Capitol Connection provides technical
support for the free webcasts. It also
offers access to this event via television
in the DC area and via phone bridge for
a fee. If you have any questions, visit
https://www.CapitolConnection.org or
contact Danelle Springer or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
VerDate Mar<15>2010
19:00 Sep 13, 2011
Jkt 223001
Tennessee Gas Pipeline Company.
Dominion Transmission, Inc.
El Paso Natural Gas Company.
not be telecast through the Capitol
Connection service.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–23641 Filed 9–12–11; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–51–000]
Northern Laramie Range Alliance;
Notice of Petition for Declaratory Order
Take notice that on July 12, 2011,
Northern Laramie Range Alliance filed a
Petition for Declaratory Order,
requesting the Federal Energy
Regulatory Commission (Commission)
issue an order declaring that two Form
556 self certifications filed under the
names Pioneer Wind Park I and Pioneer
Wind Park II are void and without
effect.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\14SEN1.SGM
14SEN1
Agencies
[Federal Register Volume 76, Number 178 (Wednesday, September 14, 2011)]
[Notices]
[Pages 56748-56749]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23641]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
September 8, 2011.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: September 15, 2011, 10 a.m.
PLACE: Room 2C, 888 First Street, NE., Washington, D.C. 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
Note: Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
973RD--Meeting
Regular Meeting
September 15, 2011; 10 a.m.
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1........................... AD02-1-000................... Agency Business Matters.
A-2........................... AD02-7-000................... Customer Matters, Reliability, Security and
Market Operations.
A-3........................... OMITTED......................
A-4........................... AD11-9-000................... Report on Outages and Curtailments During the
Southwest Cold Weather Event of February 1-5,
2011.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1........................... RM11-11-000.................. Version 4 Critical Infrastructure Protection
Reliability Standards.
E-2........................... OMITTED......................
[[Page 56749]]
E-3........................... RM08-13-004.................. Transmission Relay Loadability Reliability
Standard.
E-4........................... RM10-6-000................... Interpretation of Transmission Planning
Reliability Standard.
E-5........................... RM10-29-000.................. Electric Reliability Organization Interpretation
of Transmission Operations Reliability Standard.
E-6........................... RM11-16-000.................. Transmission Relay Loadability Reliability
Standard.
E-7........................... RD11-7-000................... North American Electric Reliability Corporation.
E-8........................... ER11-3970-000................ Midwest Independent Transmission System Operator,
Inc.
E-9........................... TS11-5-000................... Bangor Hydro Electric Company.
E-10.......................... ER11-3967-000................ Southwest Power Pool, Inc.
E-11.......................... ER11-3064-001................ PJM Interconnection, L.L.C. and Trans-Allegheny
Interstate Line Company.
E-12.......................... ER11-3972-000................ PJM Interconnection, L.L.C.
E-13.......................... ER11-3953-000................ ISO New England Inc. and New England Power Pool.
E-14.......................... ER11-2224-004................ New York Independent System Operator, Inc.
ER11-2224-005................
ER11-2224-009................
E-15.......................... ER11-3949-000................ New York Independent System Operator, Inc.
ER11-3949-001................
ER11-3951-000................
E-16.......................... ER11-3973-000................ California Independent System Operator
Corporation.
E-17.......................... EL11-12-002.................. Idaho Wind Partners 1, LLC.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1........................... RM11-4-000................... Storage Reporting Requirements of Interstate and
Intrastate Natural Gas Companies.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1........................... P-2698-050................... Duke Energy Carolinas, LLC.
P-2686-062...................
H-2........................... P-13681-002.................. Grand Coulee Project Hydroelectric Authority.
H-3........................... DI10-9-001................... Woodland Pulp LLC.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1........................... CP11-30-000.................. Tennessee Gas Pipeline Company.
CP11-41-000.................. Dominion Transmission, Inc.
C-2........................... CP10-510-000................. El Paso Natural Gas Company.
----------------------------------------------------------------------------------------------------------------
A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to https://www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its webcast. The Capitol Connection provides technical
support for the free webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://www.CapitolConnection.org or contact
Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-23641 Filed 9-12-11; 4:15 pm]
BILLING CODE 6717-01-P