Sunshine Act Meeting Notice, 56429-56430 [2011-23442]
Download as PDF
Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices
Federal Energy Regulatory
Commission’s (Commission)
Regulations 1 and Rule 501.1.3.4 of the
Rules of Procedure of the North
American Electric Reliability
Corporation (NERC) 2 the City of
Holland, Michigan Board of Public
Works (Holland BPW) filed an appeal
with the Commission of the August 12,
2011 decision of the NERC Board of
Trustees Compliance Committee
denying Holland BPW’s appeal of the
decision of ReliabilityFirst Corporation
to register Holland BPW as a
Transmission Owner and Transmission
Operator on the NERC Compliance
Registry.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 3, 2011.
Dated: September 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–23315 Filed 9–12–11; 8:45 am]
BILLING CODE 6717–01–P
56429
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: September 15, 2011, 10
a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note —Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400. For a recorded message
listing items struck from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
973RD—MEETING; REGULAR MEETING
[September 15, 2011, 10 a.m.]
Item No.
Docket No.
Company
Administrative
A–1
A–2
A–3
A–4
......
......
......
......
AD02–1–000
AD02–7–000
OMITTED
AD11–9–000
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Report on Outages and Curtailments During the Southwest Cold Weather Event of February 1–5, 2011.
mstockstill on DSK4VPTVN1PROD with NOTICES
Electric
E–1 ......
E–2 ......
E–3 ......
E–4 ......
E–5 ......
E–6 ......
E–7 ......
E–8 ......
E–9 ......
E–10 ....
E–11 ....
E–12 ....
E–13 ....
1 18
RM11–11–000
OMITTED
RM08–13–004
RM10–6–000
RM10–29–000
RM11–16–000
RD11–7–000
ER11–3970–000
TS11–5–000
ER11–3967–000
ER11–3064–001
ER11–3972–000
ER11–3953–000
Version 4 Critical Infrastructure Protection Reliability Standards.
Transmission Relay Loadability Reliability Standard.
Interpretation of Transmission Planning Reliability Standard.
Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard.
Transmission Relay Loadability Reliability Standard.
North American Electric Reliability Corporation.
Midwest Independent Transmission System Operator, Inc.
Bangor Hydro Electric Company.
Southwest Power Pool, Inc.
PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company.
PJM Interconnection, L.L.C.
ISO New England Inc. and New England Power Pool.
CFR 39.2 (2010).
VerDate Mar<15>2010
19:22 Sep 12, 2011
2 Rules of Procedure of the North American
Electric Reliability Corporation, rule 501.1.3.4
(effective April 12, 2011) (stating a decision of the
Jkt 223001
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
NERC Board of Trustees Compliance Committee
may be appealed to the applicable governmental
authority within 21 days of the date of the decision.
E:\FR\FM\13SEN1.SGM
13SEN1
56430
Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices
973RD—MEETING; REGULAR MEETING—Continued
[September 15, 2011, 10 a.m.]
Item No.
Docket No.
E–14 ....
ER11–2224–004, ER11–
2224–005, ER11–2224–
009
ER11–3949–000, ER11–
3949–001, ER11–3951–
000
ER11–3973–000
EL11–12–002
E–15 ....
E–16 ....
E–17 ....
Company
New York Independent System Operator, Inc.
New York Independent System Operator, Inc.
California Independent System Operator Corporation.
Idaho Wind Partners 1, LLC.
Gas
G–1 ......
RM11–4–000
Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies.
Hydro
H–1 ......
H–2 ......
H–3 ......
P–2698–050, P–2686–062
P–13681–002
DI10–9–001
Duke Energy Carolinas, LLC.
Grand Coulee Project Hydroelectric Authority.
Woodland Pulp LLC.
Certificates
C–1 ......
C–2 ......
CP11–30–000
CP11–41–000
CP10–510–000
Tennessee Gas Pipeline Company.
Dominion Transmission, Inc.
El Paso Natural Gas Company.
mstockstill on DSK4VPTVN1PROD with NOTICES
September 8, 2011.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
A free webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to https://www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The event will
contain a link to its webcast. The
Capitol Connection provides technical
support for the free webcasts. It also
offers access to this event via television
in the DC area and via phone bridge for
a fee. If you have any questions, visit
https://www.CapitolConnection.org or
contact Danelle Springer or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
Boulder Canyon Project
Western Area Power Administration
[FR Doc. 2011–23442 Filed 9–9–11; 11:15 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:22 Sep 12, 2011
Jkt 223001
Western Area Power
Administration, DOE.
ACTION: Notice of base charge and rates.
AGENCY:
In this notice, the Deputy
Secretary of Energy approves the Fiscal
Year (FY) 2012 Base Charge and Rates
(Rates) for Boulder Canyon Project
(BCP) electric service provided by the
Western Area Power Administration
(Western). The Rates will provide
sufficient revenue to pay all annual
costs, including interest expense, and
repay investments within the allowable
period.
DATES: The Rates will be effective the
first day of the first full billing period
beginning on or after October 1, 2011.
These Rates will stay in effect through
September 30, 2012, or until superseded
by other rates.
FOR FURTHER INFORMATION CONTACT: Mr.
Jack Murray, Rates Manager, Desert
Southwest Customer Service Region,
Western Area Power Administration,
P.O. Box 6457, Phoenix, AZ 85005–
6457, (602) 605–2442, e-mail
jmurray@wapa.gov .
SUPPLEMENTARY INFORMATION: Hoover
Dam, authorized by the Boulder Canyon
Project Act (45 Stat. 1057, December 21,
1928), sits on the Colorado River along
the Arizona and Nevada border. Hoover
Power Plant has nineteen (19)
SUMMARY:
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
generating units (two for plant use) and
an installed capacity of 2,078,800 kW
(4,800 kW for plant use). High-voltage
transmission lines and substations make
it possible for consumers in southern
Nevada, Arizona, and southern
California to receive power from the
Project. BCP electric service rates are
adjusted annually using an existing rate
formula established on April 19, 1996.
Rate Schedule BCP–F8, Rate Order
No. WAPA–150, effective October 1,
2010, through September 30, 2015,
allows for an annual recalculation of the
rates.1 This notice sets forth the
recalculated rates for FY 2012. Under
Rate Schedule BCP–F8, the existing
composite rate effective on October 1,
2010, was 19.73 mills per kilowatthour
(mills/kWh). The base charge was
$75,182,522, the energy rate was 9.86
mills/kWh, and the capacity rate was
$1.90 per kilowattmonth (kW-month).
The re-calculated rates for BCP
electric service, effective October 1,
2011, will result in an overall composite
rate of 21.11 mills/kWh. The proposed
rates were calculated using the FY 2011
Final Master Schedule. This results in
an increase of approximately 6.99
percent when compared with the
existing BCP electric service composite
rate. The increase is due to an increase
in the annual revenue requirement. The
1 FERC confirmed and approved Rate Order No.
WAPA–150 on December 9, 2010, in Docket No.
EF10–7–000, See United States Department of
Energy, Western Area Power Administration,
Boulder Canyon Project, 133 FERC ¶ 62,229
(December 9, 2010).
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 76, Number 177 (Tuesday, September 13, 2011)]
[Notices]
[Pages 56429-56430]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: September 15, 2011, 10 a.m.
PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note --Items listed on the agenda may be deleted without
further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400. For a recorded message listing items struck
from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
973rd--Meeting; Regular Meeting
[September 15, 2011, 10 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1.................... AD02-1-000 Agency Business Matters.
A-2.................... AD02-7-000 Customer Matters, Reliability, Security
and Market Operations.
A-3.................... OMITTED ........................................
A-4.................... AD11-9-000 Report on Outages and Curtailments
During the Southwest Cold Weather Event
of February 1-5, 2011.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1.................... RM11-11-000 Version 4 Critical Infrastructure
Protection Reliability Standards.
E-2.................... OMITTED ........................................
E-3.................... RM08-13-004 Transmission Relay Loadability
Reliability Standard.
E-4.................... RM10-6-000 Interpretation of Transmission Planning
Reliability Standard.
E-5.................... RM10-29-000 Electric Reliability Organization
Interpretation of Transmission
Operations Reliability Standard.
E-6.................... RM11-16-000 Transmission Relay Loadability
Reliability Standard.
E-7.................... RD11-7-000 North American Electric Reliability
Corporation.
E-8.................... ER11-3970-000 Midwest Independent Transmission System
Operator, Inc.
E-9.................... TS11-5-000 Bangor Hydro Electric Company.
E-10................... ER11-3967-000 Southwest Power Pool, Inc.
E-11................... ER11-3064-001 PJM Interconnection, L.L.C. and Trans-
Allegheny Interstate Line Company.
E-12................... ER11-3972-000 PJM Interconnection, L.L.C.
E-13................... ER11-3953-000 ISO New England Inc. and New England
Power Pool.
[[Page 56430]]
E-14................... ER11-2224-004, ER11-2224-005, ER11-2224-009 New York Independent System Operator,
Inc.
E-15................... ER11-3949-000, ER11-3949-001, ER11-3951-000 New York Independent System Operator,
Inc.
E-16................... ER11-3973-000 California Independent System Operator
Corporation.
E-17................... EL11-12-002 Idaho Wind Partners 1, LLC.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1.................... RM11-4-000 Storage Reporting Requirements of
Interstate and Intrastate Natural Gas
Companies.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1.................... P-2698-050, P-2686-062 Duke Energy Carolinas, LLC.
H-2.................... P-13681-002 Grand Coulee Project Hydroelectric
Authority.
H-3.................... DI10-9-001 Woodland Pulp LLC.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1.................... CP11-30-000 Tennessee Gas Pipeline Company.
CP11-41-000 Dominion Transmission, Inc.
C-2.................... CP10-510-000 El Paso Natural Gas Company.
----------------------------------------------------------------------------------------------------------------
September 8, 2011.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to https://www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its webcast. The Capitol Connection provides technical
support for the free webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://www.CapitolConnection.org or contact
Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2011-23442 Filed 9-9-11; 11:15 am]
BILLING CODE 6717-01-P