Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information, 56483-56488 [2011-23313]

Download as PDF Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices by electronic mail to FR_NOTICE_ QUESTIONS@lsc.gov. ACCESSIBILITY: LSC complies with the American’s with Disabilities Act and Section 504 of the 1973 Rehabilitation Act. Upon request, meeting notices and materials will be made available in alternative formats to accommodate individuals with disabilities. Individuals that need other accommodations due to disability in order to attend the meeting in person or telephonically should contact Katherine Ward at (202) 295–1500 or FR_NOTICE_ QUESTIONS@lsc.gov, at least 2 business days in advance of the meeting. If a request is made without advance notice, LSC will make every effort to accommodate the request but cannot guarantee that all requests can be fulfilled. Dated: September 8, 2011. Victor M. Fortuno, Vice President & General Counsel. [FR Doc. 2011–23520 Filed 9–9–11; 4:15 pm] BILLING CODE 7050–01–P LIBRARY OF CONGRESS Copyright Royalty Board [Docket No. 2011–6 CRB DD 2010] Distribution of 2010 DART Sound Recordings Fund Royalties Copyright Royalty Board, Library of Congress. ACTION: Notice soliciting comments on motion for partial distribution. AGENCY: The Copyright Royalty Judges solicit comments on a motion for partial distribution in connection with 2010 DART Sound Recordings Fund royalties. SUMMARY: Comments are due on or before October 13, 2011. ADDRESSES: Comments may be sent electronically to crb@loc.gov. In the alternative, send an original, five copies, and an electronic copy on a CD either by mail or hand delivery. Please do not use multiple means of transmission. Comments may not be delivered by an overnight delivery service other than the U.S. Postal Service Express Mail. If by mail (including overnight delivery), comments must be addressed to: Copyright Royalty Board, P.O. Box 70977, Washington, DC 20024–0977. If hand delivered by a private party, comments must be brought to the Library of Congress, James Madison Memorial Building, LM–401, 101 Independence Avenue, SE., Washington, DC 20559–6000. If mstockstill on DSK4VPTVN1PROD with NOTICES DATES: VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 delivered by a commercial courier, comments must be delivered to the Congressional Courier Acceptance Site located at 2nd and D Street, NE,. Washington, DC. The envelope must be addressed to: Copyright Royalty Board, Library of Congress, James Madison Memorial Building, LM–403, 101 Independence Avenue, SE., Washington, DC 20559–6000. FOR FURTHER INFORMATION CONTACT: Richard Strasser, Senior Attorney, or Gina Giuffreda, Attorney Advisor, by telephone at (202) 707–7658 or e-mail at crb@loc.gov. SUPPLEMENTARY INFORMATION: On August 23, 2011, the Alliance of Artists and Recording Companies (‘‘AARC’’), on behalf of itself and claimants with which it has reached settlements (the ‘‘Settling Claimants’’) filed with the Judges a Notice of Settlement and Request for Partial Distribution of the 2010 DART Sound Recordings Fund Featured Recording Artists and Copyright Owners Subfunds Royalties (‘‘Notice and Request’’). In the Notice and Request, AARC states that the Settling Claimants have reached a settlement among themselves concerning distribution of the 2010 DART Sound Recordings Fund Royalties. With respect to the Featured Recording Artists Subfund, AARC represents that it has reached settlements with 215 of the 217 other claimants for that subfund and that the nonsettling claimants have ‘‘de minimis record sales of 2,163 and 13, respectively, in a universe of over one billion claimants’ sound recordings sold in 2010.’’ Notice and Request at 2. With respect to the Copyright Owners Subfund, AARC represents that it has reached settlements with 218 of the 225 other claimants. AARC represents that the nonsettling claimants have combined sales of 3,010 ‘‘in a universe of over one billion claimants’ sound recordings sold in 2010.’’ Notice and Request at 2. AARC requests a partial distribution of 98% from each of the subfunds pursuant to Section 801(b)(3)(C) of the Copyright Act. Under that section of the Copyright Act, before ruling on a partial distribution motion the Judges must publish a notice in the Federal Register seeking responses to the motion to ascertain whether any claimant entitled to receive such royalty fees has a reasonable objection to the proposed distribution. Consequently, this Notice seeks comments from interested claimants on whether any reasonable objection exists that would preclude the distribution of 98% of the 2010 DART Sound Recordings Royalty funds (both subfunds) to the Settling PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 56483 Claimants. The Judges must be advised of the existence and extent of all such objections by the end of the comment period. The Judges will not consider any objections with respect to the partial distribution motion that come to their attention after the close of that period. The Notice and Request is posted on the Copyright Royalty Board Web site at https://www.loc.gov/crb. Dated: September 7, 2011. James Scott Sledge, Chief U.S. Copyright Royalty Judge. [FR Doc. 2011–23287 Filed 9–12–11; 8:45 am] BILLING CODE 1410–72–P NUCLEAR REGULATORY COMMISSION [NRC–2011–0206] Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information Nuclear Regulatory Commission. ACTION: Notice of license amendment request, opportunity to comment, opportunity to request a hearing. AGENCY: Comments must be filed by October 13, 2011. A request for a hearing must be filed by November 14, 2011. Any potential party as defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4 who believes access to Sensitive Unclassified NonSafeguards Information is necessary to respond to this notice must request document access by September 23, 2011. ADDRESSES: Please include Docket ID NRC–2011–0206 in the subject line of your comments. For additional instructions on submitting comments and instructions on accessing documents related to this action, see ‘‘Submitting Comments and Accessing Information’’ in the SUPPLEMENTARY INFORMATION section of this document. You may submit comments by any one of the following methods: • Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC–2011–0206. Address questions about NRC dockets to Carol Gallagher, telephone: 301–492–3668; e-mail: Carol.Gallagher@nrc.gov. • Mail comments to: Cindy Bladey, Chief, Rules, Announcements, and DATES: E:\FR\FM\13SEN1.SGM 13SEN1 56484 Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES Directives Branch (RADB), Office of Administration, Mail Stop: TWB–05– B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. • Fax comments to: RADB at 301– 492–3446. SUPPLEMENTARY INFORMATION: Submitting Comments and Accessing Information Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site, https:// www.regulations.gov. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed. You can access publicly available documents related to this document using the following methods: • NRC’s Public Document Room (PDR): The public may examine and have copied, for a fee, publicly available documents at the NRC’s PDR, Room O1– F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available online in the NRC Library at https://www.nrc.gov/reading-rm/ adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of the NRC’s public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC’s PDR reference staff at 1–800–397–4209, 301–415–4737, or by e-mail to pdr.resource@nrc.gov. • Federal Rulemaking Web Site: Public comments and supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC–2011– 0206. Background Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 Commission (the Commission or NRC staff) is publishing this notice. The Act requires the Commission publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This notice includes notices of amendments containing sensitive unclassified non-safeguards information (SUNSI). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration. Under the Commission’s regulations in Title 10 of the Code of Federal Regulations (10 CFR) 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) Involve a significant increase in the probability or consequences of an accident previously evaluated; (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determination. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it PO 00000 Frm 00093 Fmt 4703 Sfmt 4703 will publish in the Federal Register a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. Within 60 days after the date of publication of this notice, any person(s) whose interest may be affected by this action may file a request for a hearing and a petition to intervene with respect to issuance of the amendment to the subject facility operating license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission’s ’’Rules of Practice for Domestic Licensing Proceedings’’ in 10 CFR part 2. Interested person(s) should consult a current copy of 10 CFR 2.309, which is available at the Commission’s PDR, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. NRC regulations are accessible electronically from the NRC Library on the NRC Web site at https://www.nrc.gov/reading-rm/ doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the requestor or petitioner; (2) the nature of the requestor’s/petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the requestor’s/petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor’s/petitioner’s interest. The petition must also set forth the specific contentions which the requestor/ petitioner seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or E:\FR\FM\13SEN1.SGM 13SEN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The petition must include sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the requestor/ petitioner to relief. A requestor/ petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. If a hearing is requested, and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment. All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by telephone at 1–301–415–1677, to request (1) a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on NRC’s public Web site at https:// www.nrc.gov/site-help/e-submittals/ apply-certificates.html. System requirements for accessing the E-Submittal server are detailed in NRC’s ‘‘Guidance for Electronic Submission,’’ which is available on the agency’s public Web site at https://www.nrc.gov/ site-help/e-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software. If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC’s online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then PO 00000 Frm 00094 Fmt 4703 Sfmt 4703 56485 submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public Web site at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the agency’s adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ‘‘Contact Us’’ link located on the NRC Web site at https:// www.nrc.gov/site-help/ e-submittals.html, by e-mail at MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the E:\FR\FM\13SEN1.SGM 13SEN1 mstockstill on DSK4VPTVN1PROD with NOTICES 56486 Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in NRC’s electronic hearing docket which is available to the public at https:// ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Petitions for leave to intervene must be filed no later than 60 days from the date of publication of this notice. Nontimely filings will not be entertained absent a determination by the presiding officer that the petition or request should be granted or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). For further details with respect to this amendment action, see the application for amendment which is available for public inspection at the Commission’s PDR, located at One White Flint North, Room O1–F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly available documents created or received at the NRC are accessible electronically through ADAMS in the NRC Library at https://www.nrc.gov/ reading-rm/adams.html. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the PDR Reference staff at 1–800–397–4209, 301– 415–4737, or by e-mail to pdr.resource@nrc.gov. VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 Carolina Power & Light Company, et al., Docket No. 50–400, Shearon Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North Carolina Date of amendment request: April 28, 2011, as supplemented June 23, 2011. Description of amendment request: This amendment request contains sensitive unclassified non-safeguards information. The proposed amendment will increase the rated thermal power (RTP) level from 2900 megawatts thermal (MWt) to 2948 MWt, and make technical specification changes as necessary to support operation at the uprated power level. The proposed change is an increase in RTF of approximately 1.66 percent. The proposed uprate is characterized as a measurement uncertainty recapture using the Cameron Leading Edge Flow Meter CheckPlus System to improve plant calorimetric heat balance measurement accuracy. Basis for proposed no significant hazards consideration determination: As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed change will increase the Shearon Harris Nuclear Power Plant, Unit No. 1 (HNP) rated thermal power (RTP) from 2900 megawatts thermal (MWt) to 2948 MWt. Nuclear steam supply system and balance-ofplant systems, components and analyses that could be affected by the proposed change in RTP were evaluated using revised design parameters. The evaluations determined that these structures, systems and components are capable of performing their design function at the proposed uprated RTP of 2948 MWt. An evaluation of the accident analyses demonstrated that the applicable analysis acceptance criteria are still met with the proposed changes. Power level is an input assumption to equipment design and accident analyses, but it is not a transient or accident initiator. Accident initiators are not affected by the power uprate, and plant safety barrier challenges are not created by the proposed changes. The radiological consequences of operation at the uprated power conditions have been assessed. The proposed change in RTP does not affect release paths, frequency of release, or the analyzed source term for any accidents previously evaluated in the HNP Final Safety Analysis Report. Structures, systems and components required to mitigate transients are capable of performing their design functions with the proposed changes, and are thus acceptable. Analyses performed to assess the effects of mass and energy releases remain valid. The source term used to assess radiological consequences was reviewed and PO 00000 Frm 00095 Fmt 4703 Sfmt 4703 determined to bound operation at the proposed power level. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. No new accident scenarios, failure mechanisms, or single failures are introduced as a result of any proposed changes. The ultrasonic flow meter has been analyzed, and system failures will not adversely affect any safety-related system or any structures, systems or components required for transient mitigation. Structures, systems and components previously required for transient mitigation are still capable of fulfilling their intended design functions. The proposed changes have no significant adverse affect [effect] on any safety-related structures, systems or components and do not significantly change the performance or integrity of any safety-related system. The proposed changes do not adversely affect any current system interfaces or create any new interfaces that could result in an accident or malfunction of a different kind than previously evaluated. Plant operation at a RTP of 2948 MWt does not create any new accident initiators or precursors. Credible malfunctions are bounded by the current accident analyses of record or recent evaluations demonstrating that applicable criteria are still met with the proposed changes. Therefore, this change does not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed change involve a significant reduction in a margin of safety? Response: No. The margins of safety associated with the power uprate are those pertaining to core thermal power. These include fuel cladding, reactor coolant pressure boundary, and containment barriers. Core analyses demonstrate that power uprate implementation will continue to meet the current nuclear design basis. Impacts to components associated with the reactor coolant system pressure boundary structural integrity, and factors such as pressuretemperature limits, vessel fluence, and pressurized thermal shock were evaluated and determined to be acceptable at the uprate power level. Systems will continue to operate within their design parameters and remain capable of performing their intended safety functions following power uprate implementation. The current HNP safety analyses, including the design basis radiological accident dose calculations, bound the power uprate. Therefore, this change does not involve a significant reduction in a margin of safety. The NRC staff has reviewed the licensee’s analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff E:\FR\FM\13SEN1.SGM 13SEN1 Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing Sensitive Unclassified Non-Safeguards Information (SUNSI). B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party who believes access to SUNSI is necessary to respond to this notice may request such access. A ‘‘potential party’’ is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 10 days after publication will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier. C. The requestor shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555–0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail address for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, respectively.1 The request must include the following information: (1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party’s particularized interest that could be harmed by the action identified in C.(1); and (3) The identity of the individual or entity requesting access to SUNSI and the requestor’s basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention. D. Based on an evaluation of the information submitted under paragraph C.(3) the NRC staff will determine within 10 days of receipt of the request whether: (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and (2) The requestor has established a legitimate need for access to SUNSI. E. If the NRC staff determines that the requestor satisfies both D.(1) and D.(2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI. F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requestor no later than 25 days after the requestor is granted access to that information. However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. G. Review of Denials of Access. (1) If the request for access to SUNSI is denied by the NRC staff either after a determination on standing and need for access, or after a determination on trustworthiness and reliability, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial. (2) The requestor may challenge the NRC staff’s adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) the presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an administrative law judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer. H. Review of Grants of Access. A party other than the requestor may challenge an NRC staff determination granting access to SUNSI whose release would harm that party’s interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRC staff of its grant of access. If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.3 I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR Part 2. Attachment 1 to this Order summarizes the general target schedule for processing and resolving requests under these procedures. It is so ordered. 1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC’s ‘‘E–Filing Rule,’’ the initial request to access SUNSI under these procedures should be submitted as described in this paragraph. 2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request. 3 Requestors should note that the filing requirements of the NRC’s E–Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures. proposes to determine that the amendment request involves no significant hazards consideration. Attorney for licensee: David T. Conley, Associate General Counsel II— Legal Department, Progress Energy Service Company, LLC, Post Office Box 1551, Raleigh, North Carolina 27602. NRC Branch Chief: Douglas A. Broaddus. Order Imposing Procedures for Access to Sensitive Unclassified NonSafeguards Information for Contention Preparation; Carolina Power & Light Company, et al., Docket No. 50–400, Shearon Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North Carolina mstockstill on DSK4VPTVN1PROD with NOTICES 56487 VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 E:\FR\FM\13SEN1.SGM 13SEN1 56488 Federal Register / Vol. 76, No. 177 / Tuesday, September 13, 2011 / Notices Dated at Rockville, Maryland, this 7th day of September 2011. For the Nuclear Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. ATTACHMENT 1—General Target Schedule for Processing and Resolving Requests for Access to Sensitive Unclassified Non-Safeguards Information in this Proceeding Day Event/activity 0 .............................. Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests. Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information: supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply). Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access. Deadline for NRC staff reply to motions to reverse NRC staff determination(s). (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI. If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order. Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI. (Answer receipt +7) Petitioner/Intervenor reply to answers. Decision on contention admission. 10 ............................ 60 ............................ 20 ............................ 25 ............................ 30 ............................ 40 ............................ A .............................. A + 3 ....................... A + 28 ..................... A + 53 ..................... A + 60 ..................... >A + 60 ................... [FR Doc. 2011–23313 Filed 9–12–11; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2011–0006] Sunshine Act Meeting Notice Nuclear Regulatory Commission. DATES: Weeks of September 5, 12, 19, 26, and October 3, 10, 17, 2011. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. mstockstill on DSK4VPTVN1PROD with NOTICES AGENCY HOLDING THE MEETINGS: Week of September 5, 2011 Friday, September 9, 2011 11:30 a.m. Affirmation Session (Public Meeting) (Tentative) a. Petitions Requesting Relief Related VerDate Mar<15>2010 19:22 Sep 12, 2011 Jkt 223001 to the March 11, 2011, Earthquake and Tsunami Events in Fukushima, Japan (Tentative) b. Nuclear Innovation North America LLC (South Texas Project, Units 3 and 4), Staff Petition for Review of LBP–11–7 (Tentative) c. U.S. Department of Energy (HighLevel Waste Repository), Review of LBP–10–11, Docket No. 63–001– HLW (Tentative) This meeting will be webcast live at the Web address—https://www.nrc.gov. Week of September 12, 2011 Wednesday, September 14, 2011 9 a.m. Briefing on the Japan Near Term Task Force Report—Short-Term Actions (Public Meeting) (Contact: Rob Taylor, 301–415–3172) This meeting will be webcast live at the Web address—https://www.nrc.gov. PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 Week of September 19, 2011—Tentative There are no meetings scheduled for the week of September 19, 2011. Week of September 26, 2011—Tentative Tuesday, September 27, 2011 9 a.m. Mandatory Hearing—Southern Nuclear Operating Co., et al.; Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, and Limited Work Authorizations (Public Meeting) (Contact: Rochelle Bavol, 301–415– 1651) This meeting will be webcast live at the Web address—https://www.nrc.gov. Week of October 3, 2011—Tentative Thursday, October 6, 2011 9 a.m. Briefing on NRC International Activities (Public Meeting) (Contact: Karen Henderson, 301– 415–0202) E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 76, Number 177 (Tuesday, September 13, 2011)]
[Notices]
[Pages 56483-56488]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23313]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2011-0206]


Applications and Amendments to Facility Operating Licenses 
Involving Proposed No Significant Hazards Considerations and Containing 
Sensitive Unclassified Non-Safeguards Information and Order Imposing 
Procedures for Access to Sensitive Unclassified Non-Safeguards 
Information

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of license amendment request, opportunity to comment, 
opportunity to request a hearing.

-----------------------------------------------------------------------

DATES: Comments must be filed by October 13, 2011. A request for a 
hearing must be filed by November 14, 2011. Any potential party as 
defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4 who 
believes access to Sensitive Unclassified Non-Safeguards Information is 
necessary to respond to this notice must request document access by 
September 23, 2011.

ADDRESSES: Please include Docket ID NRC-2011-0206 in the subject line 
of your comments. For additional instructions on submitting comments 
and instructions on accessing documents related to this action, see 
``Submitting Comments and Accessing Information'' in the SUPPLEMENTARY 
INFORMATION section of this document. You may submit comments by any 
one of the following methods:
     Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0206. Address questions about NRC dockets to Carol Gallagher, 
telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov.
     Mail comments to: Cindy Bladey, Chief, Rules, 
Announcements, and

[[Page 56484]]

Directives Branch (RADB), Office of Administration, Mail Stop: TWB-05-
B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
     Fax comments to: RADB at 301-492-3446.

SUPPLEMENTARY INFORMATION:

Submitting Comments and Accessing Information

    Comments submitted in writing or in electronic form will be posted 
on the NRC Web site and on the Federal rulemaking Web site, https://www.regulations.gov. Because your comments will not be edited to remove 
any identifying or contact information, the NRC cautions you against 
including any information in your submission that you do not want to be 
publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.
    You can access publicly available documents related to this 
document using the following methods:
     NRC's Public Document Room (PDR): The public may examine 
and have copied, for a fee, publicly available documents at the NRC's 
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, 
Rockville, Maryland 20852.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): Publicly available documents created or received at the NRC 
are available online in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, 
which provides text and image files of the NRC's public documents. If 
you do not have access to ADAMS or if there are problems in accessing 
the documents located in ADAMS, contact the NRC's PDR reference staff 
at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
     Federal Rulemaking Web Site: Public comments and 
supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC-2011-0206.

Background

    Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the U.S. Nuclear Regulatory Commission (the 
Commission or NRC staff) is publishing this notice. The Act requires 
the Commission publish notice of any amendments issued, or proposed to 
be issued and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license upon a 
determination by the Commission that such amendment involves no 
significant hazards consideration, notwithstanding the pendency before 
the Commission of a request for a hearing from any person.
    This notice includes notices of amendments containing sensitive 
unclassified non-safeguards information (SUNSI).

Notice of Consideration of Issuance of Amendments to Facility Operating 
Licenses, Proposed No Significant Hazards Consideration Determination, 
and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve no significant hazards consideration. Under 
the Commission's regulations in Title 10 of the Code of Federal 
Regulations (10 CFR) 50.92, this means that operation of the facility 
in accordance with the proposed amendment would not (1) Involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; (2) create the possibility of a new or different 
kind of accident from any accident previously evaluated; or (3) involve 
a significant reduction in a margin of safety. The basis for this 
proposed determination for each amendment request is shown below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Within 60 days after the date of publication of this notice, any 
person(s) whose interest may be affected by this action may file a 
request for a hearing and a petition to intervene with respect to 
issuance of the amendment to the subject facility operating license. 
Requests for a hearing and a petition for leave to intervene shall be 
filed in accordance with the Commission's ''Rules of Practice for 
Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s) 
should consult a current copy of 10 CFR 2.309, which is available at 
the Commission's PDR, located at One White Flint North, Room O1-F21, 
11555 Rockville Pike (first floor), Rockville, Maryland 20852. NRC 
regulations are accessible electronically from the NRC Library on the 
NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If 
a request for a hearing or petition for leave to intervene is filed 
within 60 days, the Commission or a presiding officer designated by the 
Commission or by the Chief Administrative Judge of the Atomic Safety 
and Licensing Board Panel, will rule on the request and/or petition; 
and the Secretary or the Chief Administrative Judge of the Atomic 
Safety and Licensing Board will issue a notice of a hearing or an 
appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address, and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also set forth the specific contentions which the requestor/petitioner 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or

[[Page 56485]]

fact to be raised or controverted. In addition, the requestor/
petitioner shall provide a brief explanation of the bases for the 
contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing. 
The requestor/petitioner must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
requestor/petitioner intends to rely to establish those facts or expert 
opinion. The petition must include sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact. Contentions shall be limited to matters within the scope of 
the amendment under consideration. The contention must be one which, if 
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, and the Commission has not made a final 
determination on the issue of no significant hazards consideration, the 
Commission will make a final determination on the issue of no 
significant hazards consideration. The final determination will serve 
to decide when the hearing is held. If the final determination is that 
the amendment request involves no significant hazards consideration, 
the Commission may issue the amendment and make it immediately 
effective, notwithstanding the request for a hearing. Any hearing held 
would take place after issuance of the amendment. If the final 
determination is that the amendment request involves a significant 
hazards consideration, any hearing held would take place before the 
issuance of any amendment.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by 
telephone at 1-301-415-1677, to request (1) a digital identification 
(ID) certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and (2) advise 
the Secretary that the participant will be submitting a request or 
petition for hearing (even in instances in which the participant, or 
its counsel or representative, already holds an NRC-issued digital ID 
certificate). Based upon this information, the Secretary will establish 
an electronic docket for the hearing in this proceeding if the 
Secretary has not already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
https://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format (PDF) in accordance with NRC guidance 
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the

[[Page 56486]]

document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from the date of publication of this notice. Non-timely filings 
will not be entertained absent a determination by the presiding officer 
that the petition or request should be granted or the contentions 
should be admitted, based on a balancing of the factors specified in 10 
CFR 2.309(c)(1)(i)-(viii).
    For further details with respect to this amendment action, see the 
application for amendment which is available for public inspection at 
the Commission's PDR, located at One White Flint North, Room O1-F21, 
11555 Rockville Pike (first floor), Rockville, Maryland 20852. Publicly 
available documents created or received at the NRC are accessible 
electronically through ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS or if there 
are problems in accessing the documents located in ADAMS, contact the 
PDR Reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to 
pdr.resource@nrc.gov.

Carolina Power & Light Company, et al., Docket No. 50-400, Shearon 
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North 
Carolina

    Date of amendment request: April 28, 2011, as supplemented June 23, 
2011.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information. The proposed 
amendment will increase the rated thermal power (RTP) level from 2900 
megawatts thermal (MWt) to 2948 MWt, and make technical specification 
changes as necessary to support operation at the uprated power level. 
The proposed change is an increase in RTF of approximately 1.66 
percent. The proposed uprate is characterized as a measurement 
uncertainty recapture using the Cameron Leading Edge Flow Meter 
CheckPlus System to improve plant calorimetric heat balance measurement 
accuracy.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed change will increase the Shearon Harris Nuclear 
Power Plant, Unit No. 1 (HNP) rated thermal power (RTP) from 2900 
megawatts thermal (MWt) to 2948 MWt. Nuclear steam supply system and 
balance-of-plant systems, components and analyses that could be 
affected by the proposed change in RTP were evaluated using revised 
design parameters. The evaluations determined that these structures, 
systems and components are capable of performing their design 
function at the proposed uprated RTP of 2948 MWt. An evaluation of 
the accident analyses demonstrated that the applicable analysis 
acceptance criteria are still met with the proposed changes. Power 
level is an input assumption to equipment design and accident 
analyses, but it is not a transient or accident initiator. Accident 
initiators are not affected by the power uprate, and plant safety 
barrier challenges are not created by the proposed changes.
    The radiological consequences of operation at the uprated power 
conditions have been assessed. The proposed change in RTP does not 
affect release paths, frequency of release, or the analyzed source 
term for any accidents previously evaluated in the HNP Final Safety 
Analysis Report. Structures, systems and components required to 
mitigate transients are capable of performing their design functions 
with the proposed changes, and are thus acceptable. Analyses 
performed to assess the effects of mass and energy releases remain 
valid. The source term used to assess radiological consequences was 
reviewed and determined to bound operation at the proposed power 
level.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    No new accident scenarios, failure mechanisms, or single 
failures are introduced as a result of any proposed changes. The 
ultrasonic flow meter has been analyzed, and system failures will 
not adversely affect any safety-related system or any structures, 
systems or components required for transient mitigation. Structures, 
systems and components previously required for transient mitigation 
are still capable of fulfilling their intended design functions. The 
proposed changes have no significant adverse affect [effect] on any 
safety-related structures, systems or components and do not 
significantly change the performance or integrity of any safety-
related system.
    The proposed changes do not adversely affect any current system 
interfaces or create any new interfaces that could result in an 
accident or malfunction of a different kind than previously 
evaluated. Plant operation at a RTP of 2948 MWt does not create any 
new accident initiators or precursors. Credible malfunctions are 
bounded by the current accident analyses of record or recent 
evaluations demonstrating that applicable criteria are still met 
with the proposed changes.
    Therefore, this change does not create the possibility of a new 
or different kind of accident from any accident previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The margins of safety associated with the power uprate are those 
pertaining to core thermal power. These include fuel cladding, 
reactor coolant pressure boundary, and containment barriers. Core 
analyses demonstrate that power uprate implementation will continue 
to meet the current nuclear design basis. Impacts to components 
associated with the reactor coolant system pressure boundary 
structural integrity, and factors such as pressure-temperature 
limits, vessel fluence, and pressurized thermal shock were evaluated 
and determined to be acceptable at the uprate power level.
    Systems will continue to operate within their design parameters 
and remain capable of performing their intended safety functions 
following power uprate implementation. The current HNP safety 
analyses, including the design basis radiological accident dose 
calculations, bound the power uprate.
    Therefore, this change does not involve a significant reduction 
in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff

[[Page 56487]]

proposes to determine that the amendment request involves no 
significant hazards consideration.
    Attorney for licensee: David T. Conley, Associate General Counsel 
II--Legal Department, Progress Energy Service Company, LLC, Post Office 
Box 1551, Raleigh, North Carolina 27602.
    NRC Branch Chief: Douglas A. Broaddus.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation; Carolina Power & 
Light Company, et al., Docket No. 50-400, Shearon Harris Nuclear Power 
Plant, Unit 1, Wake and Chatham Counties, North Carolina

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing Sensitive 
Unclassified Non-Safeguards Information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party who 
believes access to SUNSI is necessary to respond to this notice may 
request such access. A ``potential party'' is any person who intends to 
participate as a party by demonstrating standing and filing an 
admissible contention under 10 CFR 2.309. Requests for access to SUNSI 
submitted later than 10 days after publication will not be considered 
absent a showing of good cause for the late filing, addressing why the 
request could not have been filed earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) the presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR Part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It is so ordered.


[[Page 56488]]


    Dated at Rockville, Maryland, this 7th day of September 2011.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

ATTACHMENT 1--General Target Schedule for Processing and Resolving 
Requests for Access to Sensitive Unclassified Non-Safeguards 
Information in this Proceeding

------------------------------------------------------------------------
                Day                            Event/activity
------------------------------------------------------------------------
0.................................  Publication of Federal Register
                                     notice of hearing and opportunity
                                     to petition for leave to intervene,
                                     including order with instructions
                                     for access requests.
10................................  Deadline for submitting requests for
                                     access to Sensitive Unclassified
                                     Non-Safeguards Information (SUNSI)
                                     with information: supporting the
                                     standing of a potential party
                                     identified by name and address;
                                     describing the need for the
                                     information in order for the
                                     potential party to participate
                                     meaningfully in an adjudicatory
                                     proceeding.
60................................  Deadline for submitting petition for
                                     intervention containing: (i)
                                     Demonstration of standing; (ii) all
                                     contentions whose formulation does
                                     not require access to SUNSI (+25
                                     Answers to petition for
                                     intervention; +7 requestor/
                                     petitioner reply).
20................................  Nuclear Regulatory Commission (NRC)
                                     staff informs the requestor of the
                                     staff's determination whether the
                                     request for access provides a
                                     reasonable basis to believe
                                     standing can be established and
                                     shows need for SUNSI. (NRC staff
                                     also informs any party to the
                                     proceeding whose interest
                                     independent of the proceeding would
                                     be harmed by the release of the
                                     information.) If NRC staff makes
                                     the finding of need for SUNSI and
                                     likelihood of standing, NRC staff
                                     begins document processing
                                     (preparation of redactions or
                                     review of redacted documents).
25................................  If NRC staff finds no ``need'' or no
                                     likelihood of standing, the
                                     deadline for requestor/petitioner
                                     to file a motion seeking a ruling
                                     to reverse the NRC staff's denial
                                     of access; NRC staff files copy of
                                     access determination with the
                                     presiding officer (or Chief
                                     Administrative Judge or other
                                     designated officer, as
                                     appropriate). If NRC staff finds
                                     ``need'' for SUNSI, the deadline
                                     for any party to the proceeding
                                     whose interest independent of the
                                     proceeding would be harmed by the
                                     release of the information to file
                                     a motion seeking a ruling to
                                     reverse the NRC staff's grant of
                                     access.
30................................  Deadline for NRC staff reply to
                                     motions to reverse NRC staff
                                     determination(s).
40................................  (Receipt +30) If NRC staff finds
                                     standing and need for SUNSI,
                                     deadline for NRC staff to complete
                                     information processing and file
                                     motion for Protective Order and
                                     draft Non-Disclosure Affidavit.
                                     Deadline for applicant/licensee to
                                     file Non-Disclosure Agreement for
                                     SUNSI.
A.................................  If access granted: Issuance of
                                     presiding officer or other
                                     designated officer decision on
                                     motion for protective order for
                                     access to sensitive information
                                     (including schedule for providing
                                     access and submission of
                                     contentions) or decision reversing
                                     a final adverse determination by
                                     the NRC staff.
A + 3.............................  Deadline for filing executed Non-
                                     Disclosure Affidavits. Access
                                     provided to SUNSI consistent with
                                     decision issuing the protective
                                     order.
A + 28............................  Deadline for submission of
                                     contentions whose development
                                     depends upon access to SUNSI.
                                     However, if more than 25 days
                                     remain between the petitioner's
                                     receipt of (or access to) the
                                     information and the deadline for
                                     filing all other contentions (as
                                     established in the notice of
                                     hearing or opportunity for
                                     hearing), the petitioner may file
                                     its SUNSI contentions by that later
                                     deadline.
A + 53............................  (Contention receipt +25) Answers to
                                     contentions whose development
                                     depends upon access to SUNSI.
A + 60............................  (Answer receipt +7) Petitioner/
                                     Intervenor reply to answers.
>A + 60...........................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2011-23313 Filed 9-12-11; 8:45 am]
BILLING CODE 7590-01-P