Environmental Impacts Statements; Notice of Availability, 55907-55908 [2011-23143]
Download as PDF
Federal Register / Vol. 76, No. 175 / Friday, September 9, 2011 / Notices
Are there changes in the estimates from
the last approval?
Primarily, the decrease in burden is
due to finalizing the MACT standards
for new and existing industrial,
commercial, and institutional boilers
and process heaters at major source
facilities. Therefore our revised estimate
of burden is smaller than that estimated
in the last ICR.
What is the next step in the process for
this ICR?
EPA will consider any comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice
pursuant to 5 CFR 1320.5(a)(1)(iv) to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
person listed under FOR FURTHER
INFORMATION CONTACT.
Dated: September 1, 2011.
Steve Fruh,
Acting Director, Sector Policies and Programs
Division.
[FR Doc. 2011–23138 Filed 9–8–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8998–9]
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/29/2011 Through 09/02/2011
Pursuant to 40 CFR 1506.9
EIS No. 20110292, Draft EIS, FHWA,
TN, Dickson Southwest Bypass
Project, Transportation Improvement
from TN–11 (U.S. 70) West of Dickson
to TN–46 and/or I–40 South of
Dickson, Funding, Dickson County,
TN, Comment Period Ends:
10/24/2011, Contact: Charles J.
O’Neill 615–781–5772.
EIS No. 20110293, Draft EIS, NPS, 00,
Gulf Islands National Seashore
General Management Plan,
Implementation, Escambia, Santa
Rosa and Okaloosa Counties, FL and
Jackson and Harrison Counties, MS,
Comment Period Ends: 11/07/2011,
Contact: Larissa Read 303–969–2472.
VerDate Mar<15>2010
16:58 Sep 08, 2011
Jkt 223001
EIS No. 20110294, Draft EIS, USACE,
LA, I–12 to Bush, Louisiana Proposed
Highway Project, Proposes to
Construct a High-Speed, Four-Lane
Arterial Highway from the Southern
Terminus of the Current Modern
Four-Lane Arterial Portion of
Louisiana Highway (LA) 21 in Bush,
LA, to Interstate 12 (I–12), St.
Tammany Parish, LA, Comment
Period Ends: 10/24/2011, Contact:
James A. Barlow, Jr., PhD 504–862–
2250.
EIS No. 20110295, Draft EIS, BLM, CA,
Bakersfield Resource Management
Plan, To Analyze Alternatives for the
Planning and Management of Public
Lands and Resources Administered by
the BLM, Madera, San Luis Obispo,
Santa Barbara, Ventura, Kings, Tulare,
Eastern Fresno, and Western Kern
Counties, CA, Comment Period Ends:
12/07/2011, Contact: Sue Porter 661–
391–6067.
EIS No. 20110296, Draft EIS, FWS, AL,
Alabama Beach Mouse Project,
General Conservation Plan, Issuance
of Incidental Take Permit,
Implementation, Fort Morgan
Peninsula, Baldwin County, AL,
Comment Period Ends:
10/24/2011, Contact: David Dell 404–
679–7313.
EIS No. 20110297, Final EIS, FWS, AL,
Beach Club West and Gulf Highlands
Condominiums Residential/
Recreational Condominium Project,
Incidental Take Permits for
Construction and Occupancy,
Consider Issuance of U.S. Army COE
Section 10 and 404 Permits, Baldwin
County, AL, Review Period Ends:
10/11/2011, Contact: David Dell 404–
679–7313.
EIS No. 20110298, Draft EIS, NPS, CA,
Golden Gate National Recreation Area
and Muir Woods National Monument,
Draft General Management Plan, City
of San Francisco, Marin, San
Francisco, San Mateo Counties, CA,
Comment Period Ends: 11/07/2011,
Contact: Nancy Horner 415–561–
4937.
EIS No. 20110299, Draft EIS, BLM, WY,
Lander Field Office Planning Area
Project, Draft Resource Management
Plan, To Analyzes Alternatives for the
Planning and Management of Public
Lands and Resources Administered by
the BLM, Portions of Fremont,
Natrona, Carbon, Sweetwater, Hot
Springs, and Teton Counties, WY,
Comment Period Ends: 12/07/2011,
Contact: Chris Carlton 307–775–6227.
EIS No. 20110300, Final EIS, USFS, OR,
North End Sheep Allotment Project,
Proposes to Authorize Grazing
Domestic Sheep, Walla Walla Range
District of the Umatilla National
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
55907
Forest, Wallowa, Union, and Umatilla
Counties, OR, Review Period Ends:
10/11/2011, Contact: Holly Harris
509–522–6290.
EIS No. 20110301, Draft EIS, USACE,
CA, Phase 3-RD 17 100-Year Levee
Seepage Area Project, To Implement
Landside Levee Improvements, San
Joaquin County, CA, Comment Period
Ends: 10/24/2011, Contact: John
Suazo 916–557–6719.
EIS No. 20110302, Draft EIS, FWS, 00,
Sheldon National Wildlife Refuge
Project, Draft Resource Conservation
Plan, Implementation, Humboldt and
Washoe Counties, NV and Lake
County, OR, Comment Period Ends:
11/07/2011, Contact: Scott McCarthy
503–231–2232.
EIS No. 20110304, Final EIS, NOAA, 00,
Amendment 10 to the Fishery
Management Plan for Spiny Lobster,
Establish Annual Catch Limits and
Accountability Measures for
Caribbean Spiny Lobster, Gulf of
Mexico and South Atlantic Regions,
Review Period Ends: 10/11/2011,
Contact: Roy E. Crabtree, PhD 727–
824–5701.
EIS No. 20110305, Final EIS, BOP, 00,
Criminal Alien Requirement (CAR) 12
Procurement Project, To Award a
Contract to House a Population of
Approximately 1,750 Federal, LowSecurity Adult Male Criminal Alien
in a Contractor Owned and Operated
Facility, Possible Site Selection:
McRae Correctional Facility, McRae,
Georgia, Great Plains Correctional
Facility, Hinton, Oklahoma and Scott
County, Mississippi, Review Period
Ends: 10/11/2011, Contact: Richard A.
Cohn 202–514–6470.
Amended Notices
EIS No. 20110190, Draft EIS, FRA, MS,
Tupelo Railroad Relocation Planning
and Environmental Study, To
Improve Mobility and Safety by
Reducing Roadway Congestion, City
of Tupelo, MS, Comment Period Ends:
09/12/2011, Contact: John Winkle
202–493–6067. Revision to FR Notice
Published 06/24/2011: Extending
Comment Period from 08/08/2011 to
09/12/2011.
EIS No. 20110252, Final EIS, BLM, WY
—Voided—Buckskin Mine Hay Creek
II Project, Coal Lease Application
WYW–172684, Wyoming Powder
River Basin, Campbell County, WY,
Review Period Ends: 09/12/2011,
Contact: Teresa Johnson 307–261–
7600. This FEIS was inadvertently
refilled and published in 08/12/2011
FR. The Correct FEIS #20110237 was
published in 07/29/2011.
EIS No. 20110256, Draft EIS, FRA, CA,
California High-Speed Train (HST):
E:\FR\FM\09SEN1.SGM
09SEN1
55908
Federal Register / Vol. 76, No. 175 / Friday, September 9, 2011 / Notices
Fresno to Bakersfield Section HighSpeed Train, Proposes to Construct,
Operate, and Maintain an ElectricPowered High-Speed Train (HST),
Fresno, Kings, Tulare and Kern
Counties, CA, Comment Period Ends:
10/13/2011, Contact: David
Valenstein 202–493–6368. Revision to
FR Notice 08/12/2011: Extended to
Comment 09/28/2011 to 10/13/2011.
EIS No. 20110271, Final EIS, FHWA,
CO, North 1–25 Corridor, To Identify
and Evaluate Multi-Modal
Transportation Improvement along 61
miles from the Fort CollinsWellington Area, Funding and U.S.
Army COE Section 404 Permit,
Denver, CO, Review Period Ends:
10/03/2011, Contact: Monica Pavli
720–963–3012. Revision to FR Notice
Published 08/19/2011: Extending the
Wait Period from 09/19/2011 to
10/03/2011.
EIS No. 20110277, Draft Supplement,
USFS, CO, San Juan Plan Revision,
Updated Information, San Juan Public
Lands, Draft Land Management Plan
(DLMP), Implementation, San Juan
National Forest, Archuleta, Conejos,
Dolores, Hinsdale, LaPlata, Mineral,
Montezuma, Montrose, Rio Grande,
San Juan and San Miguel Counties,
CO, Comment Period Ends:
11/25/2011, Contact: Shannon
Manfredi 970–385–1229. Revision to
FR Notice Published 08/26/2011:
Extending Comment from 10/11/2011
to 11/25/2011.
EIS No. 20110281, Draft EIS, NPS, IA,
Effigy Mounds National Monument,
General Management Plan,
Implementation, Clayton and
Allamakee Counties, IA, Comment
Period Ends: 10/31/2011, Contact:
Nick Chevance 402–661–1844.
Revision of FR Notice Published
09/02/2011: Correction to Comment
Period from 10/24/2011 to
10/31/2011.
Dated: September 6, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–23143 Filed 9–8–11; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6560–50–P
VerDate Mar<15>2010
16:58 Sep 08, 2011
Jkt 223001
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9461–5]
Underground Injection Control
Program; Hazardous Waste Injection
Restrictions; Petition for Exemption—
Class I Hazardous Waste Injection;
Great Lakes Chemical Corporation, El
Dorado, AR
Environmental Protection
Agency (EPA).
ACTION: Notice of a final decision on a
no migration petition reissuance.
AGENCY:
Notice is hereby given that a
reissuance of an exemption to the land
disposal restrictions, under the 1984
Hazardous and Solid Waste
Amendments to the Resource
Conservation and Recovery Act, has
been granted to Great Lakes Chemical
Corporation for two Class I injection
wells located at El Dorado, Arkansas.
The company has adequately
demonstrated to the satisfaction of the
Environmental Protection Agency by the
petition and supporting documentation
that, to a reasonable degree of certainty,
there will be no migration of hazardous
constituents from the injection zone for
as long as the waste remains hazardous.
This final decision allows the continued
underground injection by Great Lakes,
of the specific restricted hazardous
wastes identified in this exemption, into
Class I hazardous waste injection wells
No. WDW–5 and WDW–6 at the El
Dorado, Arkansas facility until
December 31, 2017, unless EPA moves
to terminate this exemption. Additional
conditions included in this final
decision may be reviewed by contacting
the Region 6 Ground Water/UIC Section.
A public notice was issued July 7, 2011.
The public comment period closed on
August 22, 2011. No comments were
received. This decision constitutes final
Agency action and there is no
Administrative appeal. This decision
may be reviewed/appealed in
compliance with the Administrative
Procedure Act.
DATES: This action is effective as of
August 31, 2011.
ADDRESSES: Copies of the petition and
all pertinent information relating thereto
are on file at the following location:
Environmental Protection Agency,
Region 6, Water Quality Protection
Division, Source Water Protection
Branch (6WQ–S), 1445 Ross Avenue,
Dallas, Texas 75202–2733.
FOR FURTHER INFORMATION CONTACT:
Philip Dellinger, Chief Ground Water/
UIC Section, EPA—Region 6, telephone
(214) 665–7150.
SUMMARY:
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Dated: August 31, 2011.
Troy Hill,
Acting Division Director, Water Quality
Protection Division.
[FR Doc. 2011–23146 Filed 9–8–11; 8:45 am]
BILLING CODE 6560–50–P
FARM CREDIT SYSTEM INSURANCE
CORPORATION
Farm Credit System Insurance
Corporation Board; Regular Meeting
Notice is hereby given of the
regular meeting of the Farm Credit
System Insurance Corporation Board
(Board).
SUMMARY:
The meeting of the Board
will be held at the offices of the Farm
Credit Administration in McLean,
Virginia, on September 8, 2011, from 1
p.m. until such time as the Board
concludes its business.
DATE AND TIME:
Dale
L. Aultman, Secretary to the Farm
Credit System Insurance Corporation
Board, (703) 883–4009, TTY (703) 883–
4056.
FOR FURTHER INFORMATION CONTACT:
Farm Credit System
Insurance Corporation, 1501 Farm
Credit Drive, McLean, Virginia 22102.
ADDRESSES:
Parts of
this meeting of the Board will be open
to the public (limited space available)
and parts will be closed to the public.
In order to increase the accessibility to
Board meetings, persons requiring
assistance should make arrangements in
advance. The matters to be considered
at the meeting are:
SUPPLEMENTARY INFORMATION:
Closed Session
• FCSIC Report on System
Performance
Open Session
A. Approval of Minutes
• June 21, 2011
B. Business Reports
• FCSIC Quarterly Financial Reports
• Report on Insured and Other
Obligations
• Quarterly Report on Annual
Performance Plan
C. New Business
• Annual Performance Plan FY 2012–
2013
• Proposed 2012 and 2013 Budgets
• Insurance Fund Progress Review
and Setting of Premium Range Guidance
for 2012
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 76, Number 175 (Friday, September 9, 2011)]
[Notices]
[Pages 55907-55908]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-23143]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8998-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 08/29/2011 Through 09/02/2011
Pursuant to 40 CFR 1506.9
EIS No. 20110292, Draft EIS, FHWA, TN, Dickson Southwest Bypass
Project, Transportation Improvement from TN-11 (U.S. 70) West of
Dickson to TN-46 and/or I-40 South of Dickson, Funding, Dickson County,
TN, Comment Period Ends: 10/24/2011, Contact: Charles J. O'Neill 615-
781-5772.
EIS No. 20110293, Draft EIS, NPS, 00, Gulf Islands National Seashore
General Management Plan, Implementation, Escambia, Santa Rosa and
Okaloosa Counties, FL and Jackson and Harrison Counties, MS, Comment
Period Ends: 11/07/2011, Contact: Larissa Read 303-969-2472.
EIS No. 20110294, Draft EIS, USACE, LA, I-12 to Bush, Louisiana
Proposed Highway Project, Proposes to Construct a High-Speed, Four-Lane
Arterial Highway from the Southern Terminus of the Current Modern Four-
Lane Arterial Portion of Louisiana Highway (LA) 21 in Bush, LA, to
Interstate 12 (I-12), St. Tammany Parish, LA, Comment Period Ends: 10/
24/2011, Contact: James A. Barlow, Jr., PhD 504-862-2250.
EIS No. 20110295, Draft EIS, BLM, CA, Bakersfield Resource Management
Plan, To Analyze Alternatives for the Planning and Management of Public
Lands and Resources Administered by the BLM, Madera, San Luis Obispo,
Santa Barbara, Ventura, Kings, Tulare, Eastern Fresno, and Western Kern
Counties, CA, Comment Period Ends: 12/07/2011, Contact: Sue Porter 661-
391-6067.
EIS No. 20110296, Draft EIS, FWS, AL, Alabama Beach Mouse Project,
General Conservation Plan, Issuance of Incidental Take Permit,
Implementation, Fort Morgan Peninsula, Baldwin County, AL, Comment
Period Ends: 10/24/2011, Contact: David Dell 404-679-7313.
EIS No. 20110297, Final EIS, FWS, AL, Beach Club West and Gulf
Highlands Condominiums Residential/Recreational Condominium Project,
Incidental Take Permits for Construction and Occupancy, Consider
Issuance of U.S. Army COE Section 10 and 404 Permits, Baldwin County,
AL, Review Period Ends: 10/11/2011, Contact: David Dell 404-679-7313.
EIS No. 20110298, Draft EIS, NPS, CA, Golden Gate National Recreation
Area and Muir Woods National Monument, Draft General Management Plan,
City of San Francisco, Marin, San Francisco, San Mateo Counties, CA,
Comment Period Ends: 11/07/2011, Contact: Nancy Horner 415-561-4937.
EIS No. 20110299, Draft EIS, BLM, WY, Lander Field Office Planning Area
Project, Draft Resource Management Plan, To Analyzes Alternatives for
the Planning and Management of Public Lands and Resources Administered
by the BLM, Portions of Fremont, Natrona, Carbon, Sweetwater, Hot
Springs, and Teton Counties, WY, Comment Period Ends: 12/07/2011,
Contact: Chris Carlton 307-775-6227.
EIS No. 20110300, Final EIS, USFS, OR, North End Sheep Allotment
Project, Proposes to Authorize Grazing Domestic Sheep, Walla Walla
Range District of the Umatilla National Forest, Wallowa, Union, and
Umatilla Counties, OR, Review Period Ends: 10/11/2011, Contact: Holly
Harris 509-522-6290.
EIS No. 20110301, Draft EIS, USACE, CA, Phase 3-RD 17 100-Year Levee
Seepage Area Project, To Implement Landside Levee Improvements, San
Joaquin County, CA, Comment Period Ends: 10/24/2011, Contact: John
Suazo 916-557-6719.
EIS No. 20110302, Draft EIS, FWS, 00, Sheldon National Wildlife Refuge
Project, Draft Resource Conservation Plan, Implementation, Humboldt and
Washoe Counties, NV and Lake County, OR, Comment Period Ends: 11/07/
2011, Contact: Scott McCarthy 503-231-2232.
EIS No. 20110304, Final EIS, NOAA, 00, Amendment 10 to the Fishery
Management Plan for Spiny Lobster, Establish Annual Catch Limits and
Accountability Measures for Caribbean Spiny Lobster, Gulf of Mexico and
South Atlantic Regions, Review Period Ends: 10/11/2011, Contact: Roy E.
Crabtree, PhD 727-824-5701.
EIS No. 20110305, Final EIS, BOP, 00, Criminal Alien Requirement (CAR)
12 Procurement Project, To Award a Contract to House a Population of
Approximately 1,750 Federal, Low-Security Adult Male Criminal Alien in
a Contractor Owned and Operated Facility, Possible Site Selection:
McRae Correctional Facility, McRae, Georgia, Great Plains Correctional
Facility, Hinton, Oklahoma and Scott County, Mississippi, Review Period
Ends: 10/11/2011, Contact: Richard A. Cohn 202-514-6470.
Amended Notices
EIS No. 20110190, Draft EIS, FRA, MS, Tupelo Railroad Relocation
Planning and Environmental Study, To Improve Mobility and Safety by
Reducing Roadway Congestion, City of Tupelo, MS, Comment Period Ends:
09/12/2011, Contact: John Winkle 202-493-6067. Revision to FR Notice
Published 06/24/2011: Extending Comment Period from 08/08/2011 to 09/
12/2011.
EIS No. 20110252, Final EIS, BLM, WY --Voided--Buckskin Mine Hay Creek
II Project, Coal Lease Application WYW-172684, Wyoming Powder River
Basin, Campbell County, WY, Review Period Ends: 09/12/2011, Contact:
Teresa Johnson 307-261-7600. This FEIS was inadvertently refilled and
published in 08/12/2011 FR. The Correct FEIS 20110237 was
published in 07/29/2011.
EIS No. 20110256, Draft EIS, FRA, CA, California High-Speed Train
(HST):
[[Page 55908]]
Fresno to Bakersfield Section High-Speed Train, Proposes to Construct,
Operate, and Maintain an Electric-Powered High-Speed Train (HST),
Fresno, Kings, Tulare and Kern Counties, CA, Comment Period Ends: 10/
13/2011, Contact: David Valenstein 202-493-6368. Revision to FR Notice
08/12/2011: Extended to Comment 09/28/2011 to 10/13/2011.
EIS No. 20110271, Final EIS, FHWA, CO, North 1-25 Corridor, To Identify
and Evaluate Multi-Modal Transportation Improvement along 61 miles from
the Fort Collins-Wellington Area, Funding and U.S. Army COE Section 404
Permit, Denver, CO, Review Period Ends: 10/03/2011, Contact: Monica
Pavli 720-963-3012. Revision to FR Notice Published 08/19/2011:
Extending the Wait Period from 09/19/2011 to 10/03/2011.
EIS No. 20110277, Draft Supplement, USFS, CO, San Juan Plan Revision,
Updated Information, San Juan Public Lands, Draft Land Management Plan
(DLMP), Implementation, San Juan National Forest, Archuleta, Conejos,
Dolores, Hinsdale, LaPlata, Mineral, Montezuma, Montrose, Rio Grande,
San Juan and San Miguel Counties, CO, Comment Period Ends: 11/25/2011,
Contact: Shannon Manfredi 970-385-1229. Revision to FR Notice Published
08/26/2011: Extending Comment from 10/11/2011 to 11/25/2011.
EIS No. 20110281, Draft EIS, NPS, IA, Effigy Mounds National Monument,
General Management Plan, Implementation, Clayton and Allamakee
Counties, IA, Comment Period Ends: 10/31/2011, Contact: Nick Chevance
402-661-1844. Revision of FR Notice Published 09/02/2011: Correction to
Comment Period from 10/24/2011 to 10/31/2011.
Dated: September 6, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-23143 Filed 9-8-11; 8:45 am]
BILLING CODE 6560-50-P