Federal Register / Vol. 76, No. 171 / Friday, September 2, 2011 / Notices
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
p. Procedural schedule: The
application will be processed according
to the following procedural schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Notice of the availability of
the EA.
Target date
January 2012.
Dated: August 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–22518 Filed 9–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2277–023]
erowe on DSK5CLS3C1PROD with NOTICES
Union Electric Company (dba Ameren
Missouri); Notice of Application Ready
for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2277–023.
c. Date filed: June 24, 2008.
d. Applicant: Union Electric Company
(dba Ameren Missouri).
e. Name of Project: Taum Sauk
Pumped Storage Project.
f. Location: On the East Fork of the
Black River in Reynolds County,
Missouri. The project does not occupy
federal lands.
VerDate Mar<15>2010
15:37 Sep 01, 2011
Jkt 223001
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Michael O.
Lobbig, P.E., Managing Supervisor,
Hydro Licensing, Ameren Missouri,
3700 S. Lindbergh Blvd, St. Louis, MO
63127; telephone 314–957–3427; e-mail
at mlobbig@ameren.com.
i. FERC Contact: Janet Hutzel, 202–
502–8675, janet.hutzel@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Taum Sauk Pumped
Storage Project consists of: (1) A lower
reservoir impounded by a concrete
gravity dam downstream of the
confluence of the East Fork Black River
and Taum Sauk Creek; (2) an upper
reservoir on the top of Proffit Mountain
impounded by a rebuilt rollercompacted concrete dam; (3) vertical
shaft, rock and concrete-lined tunnel
sections, and a penstock conduit; (4) a
pump-generating plant with two
reversible pump units and two motor
generators with a total installed capacity
PO 00000
Frm 00023
Fmt 4703
Sfmt 9990
of 408 megawatts; (5) an excavated
tailrace and open channel to the lower
reservoir; (6) a 138-kilovolt switchyard/
substation; (7) a gravel and
sedimentation trap (bin wall) on the
East Fork of the Black River; and (8)
associated ancillary equipment.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at http:
//www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: August 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–22521 Filed 9–1–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 76, Number 171 (Friday, September 2, 2011)]
[Notices]
[Page 54752]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22521]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2277-023]
Union Electric Company (dba Ameren Missouri); Notice of
Application Ready for Environmental Analysis and Soliciting Comments,
Recommendations, Terms and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2277-023.
c. Date filed: June 24, 2008.
d. Applicant: Union Electric Company (dba Ameren Missouri).
e. Name of Project: Taum Sauk Pumped Storage Project.
f. Location: On the East Fork of the Black River in Reynolds
County, Missouri. The project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Michael O. Lobbig, P.E., Managing Supervisor,
Hydro Licensing, Ameren Missouri, 3700 S. Lindbergh Blvd, St. Louis, MO
63127; telephone 314-957-3427; e-mail at mlobbig@ameren.com.
i. FERC Contact: Janet Hutzel, 202-502-8675, janet.hutzel@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The existing Taum Sauk Pumped Storage Project consists of: (1) A
lower reservoir impounded by a concrete gravity dam downstream of the
confluence of the East Fork Black River and Taum Sauk Creek; (2) an
upper reservoir on the top of Proffit Mountain impounded by a rebuilt
roller-compacted concrete dam; (3) vertical shaft, rock and concrete-
lined tunnel sections, and a penstock conduit; (4) a pump-generating
plant with two reversible pump units and two motor generators with a
total installed capacity of 408 megawatts; (5) an excavated tailrace
and open channel to the lower reservoir; (6) a 138-kilovolt switchyard/
substation; (7) a gravel and sedimentation trap (bin wall) on the East
Fork of the Black River; and (8) associated ancillary equipment.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
You may also register online at http: //www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: August 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-22521 Filed 9-1-11; 8:45 am]