Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 54766 [2011-22520]

Download as PDF 54766 Federal Register / Vol. 76, No. 171 / Friday, September 2, 2011 / Notices name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14253) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 29, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–22515 Filed 9–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063–000] Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 24, 2011, and supplemented on April 25, 2011, May 3, 2011, July 6, 2011, and August 6, 2011, Amnor Hydro West Inc. (Amnor or applicant) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army Corps of Engineers (Corps). The project would be located on Salmon Bay near Seattle in King County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would include: (1) Three new intake structures and a new powerhouse integral with three of the six gates of the Corps’ lock and dam facility; (2) three new axial turbine/ generator units with a combined capacity of 5 megawatts with a design head of 26 feet; (3) a new tailrace exhaust apron returning flows to Salmon Bay; (4) a new 14.7-kilovolt, 100-foot-long transmission line from the powerhouse south to a proposed substation; and (5) appurtenant facilities. The estimated annual generation of the project would be 17.3 gigawatt-hours. Applicant Contact: Mr. Adam T. Supronik, 42 Pearsall Street, Staten Island, New York 10305; phone: (347) 415–9600. FERC Contact: Patrick Murphy; phone: (202) 502–8755. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14063–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 26, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–22520 Filed 9–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at a Hearing Before the Arkansas Public Service Commission The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the hearing noted below. Their attendance is part of the Commission’s ongoing outreach efforts. The Arkansas Public Service Commission will hold an evidentiary hearing involving Entergy Arkansas, Inc. (EAI) in Docket No. 10–011–U beginning at 8:30 a.m. on September 7, 2011. The hearing involves issues surrounding EAI’s membership in the Entergy System Agreement, or any successor agreement and control of its transmission system. The hearing will be held in Hearing Room 1, Arkansas Public Service Commission Building, 1000 Center Street, Little Rock, Arkansas. The discussions may address matters at issue in the following proceedings: erowe on DSK5CLS3C1PROD with NOTICES Docket No. OA07–32 ............................................................................................................................... Docket No. EL00–66 ................................................................................................................................ Docket No. EL01–88 ................................................................................................................................ Docket No. EL07–52 ................................................................................................................................ Docket No. EL08–51 ................................................................................................................................ Docket No. EL08–60 ................................................................................................................................ VerDate Mar<15>2010 15:37 Sep 01, 2011 Jkt 223001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Ameren Services Co. v. ices, Inc. E:\FR\FM\02SEN1.SGM 02SEN1 Commission v. Commission v. Commission v. Commission v. Entergy Serv-

Agencies

[Federal Register Volume 76, Number 171 (Friday, September 2, 2011)]
[Notices]
[Page 54766]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22520]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14063-000]


Amnor Hydro West Inc.; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On January 24, 2011, and supplemented on April 25, 2011, May 3, 
2011, July 6, 2011, and August 6, 2011, Amnor Hydro West Inc. (Amnor or 
applicant) filed an application for a preliminary permit, pursuant to 
section 4(f) of the Federal Power Act (FPA), proposing to study the 
feasibility of constructing the Hiram M. Chittenden Lock and Dam 
Hydroelectric Project (Hiram Dam Project or project) located at the 
Hiram M. Chittenden Lock and Dam facility owned and operated by the 
U.S. Army Corps of Engineers (Corps). The project would be located on 
Salmon Bay near Seattle in King County, Washington. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would include: (1) Three new intake structures 
and a new powerhouse integral with three of the six gates of the Corps' 
lock and dam facility; (2) three new axial turbine/generator units with 
a combined capacity of 5 megawatts with a design head of 26 feet; (3) a 
new tailrace exhaust apron returning flows to Salmon Bay; (4) a new 
14.7-kilovolt, 100-foot-long transmission line from the powerhouse 
south to a proposed substation; and (5) appurtenant facilities. The 
estimated annual generation of the project would be 17.3 gigawatt-
hours.
    Applicant Contact: Mr. Adam T. Supronik, 42 Pearsall Street, Staten 
Island, New York 10305; phone: (347) 415-9600.
    FERC Contact: Patrick Murphy; phone: (202) 502-8755.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14063-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: August 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-22520 Filed 9-1-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.