Download as PDF 54766 Federal Register / Vol. 76, No. 171 / Friday, September 2, 2011 / Notices name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14253) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 29, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–22515 Filed 9–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063–000] Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 24, 2011, and supplemented on April 25, 2011, May 3, 2011, July 6, 2011, and August 6, 2011, Amnor Hydro West Inc. (Amnor or applicant) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army Corps of Engineers (Corps). The project would be located on Salmon Bay near Seattle in King County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would include: (1) Three new intake structures and a new powerhouse integral with three of the six gates of the Corps’ lock and dam facility; (2) three new axial turbine/ generator units with a combined capacity of 5 megawatts with a design head of 26 feet; (3) a new tailrace exhaust apron returning flows to Salmon Bay; (4) a new 14.7-kilovolt, 100-foot-long transmission line from the powerhouse south to a proposed substation; and (5) appurtenant facilities. The estimated annual generation of the project would be 17.3 gigawatt-hours. Applicant Contact: Mr. Adam T. Supronik, 42 Pearsall Street, Staten Island, New York 10305; phone: (347) 415–9600. FERC Contact: Patrick Murphy; phone: (202) 502–8755. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14063–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 26, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–22520 Filed 9–1–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at a Hearing Before the Arkansas Public Service Commission The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the hearing noted below. Their attendance is part of the Commission’s ongoing outreach efforts. The Arkansas Public Service Commission will hold an evidentiary hearing involving Entergy Arkansas, Inc. (EAI) in Docket No. 10–011–U beginning at 8:30 a.m. on September 7, 2011. The hearing involves issues surrounding EAI’s membership in the Entergy System Agreement, or any successor agreement and control of its transmission system. The hearing will be held in Hearing Room 1, Arkansas Public Service Commission Building, 1000 Center Street, Little Rock, Arkansas. The discussions may address matters at issue in the following proceedings: erowe on DSK5CLS3C1PROD with NOTICES Docket No. OA07–32 ............................................................................................................................... Docket No. EL00–66 ................................................................................................................................ Docket No. EL01–88 ................................................................................................................................ Docket No. EL07–52 ................................................................................................................................ Docket No. EL08–51 ................................................................................................................................ Docket No. EL08–60 ................................................................................................................................ VerDate Mar<15>2010 15:37 Sep 01, 2011 Jkt 223001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Louisiana Public Service Entergy Services, Inc. Ameren Services Co. v. ices, Inc. E:\FR\FM\02SEN1.SGM 02SEN1 Commission v. Commission v. Commission v. Commission v. Entergy Serv- Federal Register / Vol. 76, No. 171 / Friday, September 2, 2011 / Notices Docket No. EL09–43 ................................................................................................................................ Docket No. EL09–50 ................................................................................................................................ Docket No. EL09–61 ................................................................................................................................ Docket No. EL10–55 ................................................................................................................................ Docket No. EL10–65 ................................................................................................................................ Docket No. EL11–34 ................................................................................................................................ Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. ER05–1065 ........................................................................................................................... ER07–682 ............................................................................................................................. ER07–956 ............................................................................................................................. ER08–1056 ........................................................................................................................... ER09–833 ............................................................................................................................. ER09–1224 ........................................................................................................................... ER10–794 ............................................................................................................................. ER10–1350 ........................................................................................................................... ER10–1676 ........................................................................................................................... ER10–2001 ........................................................................................................................... ER10–2161 ........................................................................................................................... ER10–2748 ........................................................................................................................... ER10–3357 ........................................................................................................................... ER11–2131 ........................................................................................................................... ER11–2132 ........................................................................................................................... ER11–2133 ........................................................................................................................... ER11–2134 ........................................................................................................................... ER11–2135 ........................................................................................................................... ER11–2136 ........................................................................................................................... ER11–2161 ........................................................................................................................... ER11–3156 ........................................................................................................................... ER11–3157 ........................................................................................................................... ER11–3274 ........................................................................................................................... ER11–3728 ........................................................................................................................... Docket No. ER11–3657 ........................................................................................................................... Docket No. ER11–3658 ........................................................................................................................... This hearing is open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Dated: August 29, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–22514 Filed 9–1–11; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8998–8] erowe on DSK5CLS3C1PROD with NOTICES Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly Receipt of Environmental Impact Statements Filed 08/22/2011 Through 08/26/2011 Pursuant to 40 CFR 1506.9. VerDate Mar<15>2010 15:37 Sep 01, 2011 Jkt 223001 Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. EIS No. 20110281, Draft EIS, NPS, IA, Effigy Mounds National Monument, General Management Plan, Implementation, Clayton and Allamakee Counties, IA, Comment Period Ends: 10/24/2011, Contact: Nich Chevance 402–661–1844. EIS No. 20110282, Final EIS, NRCS, UT, Logan Northern Canal Reconstruction Project, To Construct a System that will Safely Restore Delivery of Water, City of Logan, Cache County, UT, Review Period Ends: 10/03/2011, Contact: Bronson Smart 801–524– 4559. EIS No. 20110284, Final EIS, USFS, OR, Deschutes and Ochoco National Forest and the Crooked River National Grassland Travel Management Project, Implementation, Deschutes, Jefferson, Crook, Klamath, Lake, Grant and Wheeler County, OR, Review Period PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 54767 Arkansas Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Louisiana Public Service Commission v. Entergy Services, Inc. Midwest Independent System Transmission Operator, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Services, Inc. Entergy Arkansas, Inc. Entergy Texas, Inc. Entergy Services, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Entergy Gulf States, Louisiana, LLC Entergy Gulf States, Louisiana, LLC Entergy Mississippi, Inc. Entergy New Orleans, Inc. Entergy Texas, Inc. Entergy Texas, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Midwest Independent Transmission System Operator, Inc. Entergy Arkansas, Inc. Entergy Arkansas, Inc. Ends: 10/03/2011, Contact: Mollie Chaudet 541–383–5300. EIS No. 20110285, Final EIS, USACE, CA, San Clemente Shoreline Protection Project, To Provide Shore Protection through Nourishment of the Beach at the San Clemente Pier, San Clemente, CA, Review Period Ends: 10/03/2011, Contact: Thomas W. Keeney 213–452–3875. EIS No. 20110286, Final EIS, BPA, WA, Whistling Ridge Energy Project, Construction and Operation of a 75megawatt (MW) Wind Turbine Facility, City of White Salmon, Skamania County, WA, Review Period Ends: 10/03/2011, Contact: Andrew M. Montano 503–230–4145. EIS No. 20110287, Draft EIS, NRC, WA, Generic—License Renewal of Nuclear Plants, Supplement -47 Regarding Columbia Generating Station (NUREG—1437), Issuance of a Renewed Operating License, Benton County, WA, Comment Period Ends: 11/16/2011, Contact: Daniel Doyle 301–415–3748. EIS No. 20110288, Final EIS, USFS, UT, Oil and Gas Leasing on Lands Administered by the Dixie National Forest, Implementation, Garfield, E:\FR\FM\02SEN1.SGM 02SEN1

Agencies

[Federal Register Volume 76, Number 171 (Friday, September 2, 2011)]
[Notices]
[Pages 54766-54767]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22514]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of FERC Staff Attendance at a Hearing Before the Arkansas 
Public Service Commission

    The Federal Energy Regulatory Commission hereby gives notice that 
members of its staff may attend the hearing noted below. Their 
attendance is part of the Commission's ongoing outreach efforts.
    The Arkansas Public Service Commission will hold an evidentiary 
hearing involving Entergy Arkansas, Inc. (EAI) in Docket No. 10-011-U 
beginning at 8:30 a.m. on September 7, 2011. The hearing involves 
issues surrounding EAI's membership in the Entergy System Agreement, or 
any successor agreement and control of its transmission system.
    The hearing will be held in Hearing Room 1, Arkansas Public Service 
Commission Building, 1000 Center Street, Little Rock, Arkansas.
    The discussions may address matters at issue in the following 
proceedings:

----------------------------------------------------------------------------------------------------------------
 
----------------------------------------------------------------------------------------------------------------
Docket No. OA07-32..........................  Entergy Services, Inc.
Docket No. EL00-66..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL01-88..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL07-52..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL08-51..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL08-60..........................  Ameren Services Co. v. Entergy Services, Inc.

[[Page 54767]]

 
Docket No. EL09-43..........................  Arkansas Public Service Commission v. Entergy Services, Inc.
Docket No. EL09-50..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL09-61..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL10-55..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL10-65..........................  Louisiana Public Service Commission v. Entergy Services, Inc.
Docket No. EL11-34..........................  Midwest Independent System Transmission Operator, Inc.
Docket No. ER05-1065........................  Entergy Services, Inc.
Docket No. ER07-682.........................  Entergy Services, Inc.
Docket No. ER07-956.........................  Entergy Services, Inc.
Docket No. ER08-1056........................  Entergy Services, Inc.
Docket No. ER09-833.........................  Entergy Services, Inc.
Docket No. ER09-1224........................  Entergy Services, Inc.
Docket No. ER10-794.........................  Entergy Services, Inc.
Docket No. ER10-1350........................  Entergy Services, Inc.
Docket No. ER10-1676........................  Entergy Services, Inc.
Docket No. ER10-2001........................  Entergy Arkansas, Inc.
Docket No. ER10-2161........................  Entergy Texas, Inc.
Docket No. ER10-2748........................  Entergy Services, Inc.
Docket No. ER10-3357........................  Entergy Arkansas, Inc.
Docket No. ER11-2131........................  Entergy Arkansas, Inc.
Docket No. ER11-2132........................  Entergy Gulf States, Louisiana, LLC
Docket No. ER11-2133........................  Entergy Gulf States, Louisiana, LLC
Docket No. ER11-2134........................  Entergy Mississippi, Inc.
Docket No. ER11-2135........................  Entergy New Orleans, Inc.
Docket No. ER11-2136........................  Entergy Texas, Inc.
Docket No. ER11-2161........................  Entergy Texas, Inc.
Docket No. ER11-3156........................  Entergy Arkansas, Inc.
Docket No. ER11-3157........................  Entergy Arkansas, Inc.
Docket No. ER11-3274........................  Entergy Arkansas, Inc.
Docket No. ER11-3728........................  Midwest Independent Transmission System Operator, Inc.
Docket No. ER11-3657........................  Entergy Arkansas, Inc.
Docket No. ER11-3658........................  Entergy Arkansas, Inc.
----------------------------------------------------------------------------------------------------------------

    This hearing is open to the public.
    For more information, contact Patrick Clarey, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov.

    Dated: August 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-22514 Filed 9-1-11; 8:45 am]