Northland Power Mississippi River LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 54765 [2011-22509]
Download as PDF
Federal Register / Vol. 76, No. 171 / Friday, September 2, 2011 / Notices
and validate an eRegistration account
using the eRegistration link. Select the
eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 24, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–22503 Filed 9–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13982–000]
erowe on DSK5CLS3C1PROD with NOTICES
Northland Power Mississippi River
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On January 3, 2011, Northland Power
Mississippi River LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of hydropower on
the Mississippi River, near the town of
Point a La Hache, in Plaquemines
Parish, Louisiana. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed NPI 014 hydrokinetic
project would consist of the following:
(1) Up to 400 TREK generating units
installed in a matrix on the bottom of
the river; (2) the total capacity of the
installation would be up to 100,000
VerDate Mar<15>2010
15:37 Sep 01, 2011
Jkt 223001
kilowatts; (3) shielded underwater
cables would convey each matrix power
to a substation; and (4) a transmission
line would interconnect with the power
grid. The proposed project would have
an average annual generation of 876.0
gigawatt-hours (GWh), which would be
sold to a local utility.
Applicant Contact: Tim Richardson,
30 St. Clair Avenue West 17th Floor,
Toronto, Ontario, Canada; phone (416)
820–9521.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13982–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: August 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–22509 Filed 9–1–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
54765
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14253–000]
Lock+ Hydro Friends Fund IV; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 10, 2011, the Lock+ Hydro
Friends Fund IV filed an application for
a preliminary permit under section 4(f)
of the Federal Power Act proposing to
study the feasibility of the proposed
USACE LD 17 Project No. 14253, to be
located at the existing Mississippi River
Lock and Dam No. 17 on the Mississippi
River, near the City of New Boston, in
Mercer County, Illinois. The Mississippi
River Lock and Dam No. 17 is owned by
the United States government and
operated by the Army Corps of
Engineers.
The proposed project would consist
of: (1) Three new 109-foot-wide by 40foot-high steel lock frame modules each
containing ten 650-kilowatt hydropower
turbines having a total combined
generating capacity of 19.5 megawatts;
(2) one new 109-foot-wide and one new
220-foot-wide tailrace extending 75–150
feet downstream; (3) a new 25-foot by
50-foot switchyard; (4) a new intake
structure of undetermined size; (5) a
new 6-mile-long, 69-kilovolt
transmission line; and (6) appurtenant
facilities. The project would have an
estimated annual generation of 119,655
megawatt-hours.
Applicant Contact: Mr. Wayne F.
Krouse, 5090 Richmond Avenue, #390,
Houston, TX 77056; (877) 556–6566,
extension 709.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 76, Number 171 (Friday, September 2, 2011)]
[Notices]
[Page 54765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22509]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13982-000]
Northland Power Mississippi River LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On January 3, 2011, Northland Power Mississippi River LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of hydropower on the Mississippi
River, near the town of Point a La Hache, in Plaquemines Parish,
Louisiana. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed NPI 014 hydrokinetic project would consist of the
following: (1) Up to 400 TREK generating units installed in a matrix on
the bottom of the river; (2) the total capacity of the installation
would be up to 100,000 kilowatts; (3) shielded underwater cables would
convey each matrix power to a substation; and (4) a transmission line
would interconnect with the power grid. The proposed project would have
an average annual generation of 876.0 gigawatt-hours (GWh), which would
be sold to a local utility.
Applicant Contact: Tim Richardson, 30 St. Clair Avenue West 17th
Floor, Toronto, Ontario, Canada; phone (416) 820-9521.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13982-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: August 18, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-22509 Filed 9-1-11; 8:45 am]
BILLING CODE 6717-01-P