Sunshine Act Meeting Notice, 54451 [2011-22546]

Download as PDF Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices Order 216–6 5.09(d) and determined that issuance of the IHA is not likely to result in significant impacts on the human environment. Consequently, NMFS has adopted NSF’s EA and prepared a FONSI for the issuance of the IHA. An Environmental Impact Statement is not required and will not be prepared for the action. Authorization As a result of these determinations, NMFS has issued an IHA to UAGI for the take of marine mammals, by Level B harassment, incidental to conducting a marine seismic survey in the Arctic Ocean, September–October 2011, provided the previously mentioned mitigation, monitoring, and reporting requirements are incorporated. Dated: August 26, 2011. James H. Lecky, Director, Office of Protected Resources, National Marine Fisheries Service. Hearing Room 420, Bethesda Towers, 4330 East West Highway, Bethesda, Maryland. STATUS: Closed to the Public. MATTER TO BE CONSIDERED: PLACE: Compliance Status Report The Commission staff will brief the Commission on the status of compliance matters. For a recorded message containing the latest agenda information, call (301) 504–7948. CONTACT PERSON FOR MORE INFORMATION: Todd A. Stevenson, Office of the Secretary, U.S. Consumer Product Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504–7923. Dated: August 30, 2011. Todd A. Stevenson, Secretary. [FR Doc. 2011–22547 Filed 8–30–11; 4:15 pm] BILLING CODE 6355–01–P [FR Doc. 2011–22434 Filed 8–31–11; 8:45 am] BILLING CODE 3510–22–P DEPARTMENT OF DEFENSE CONSUMER PRODUCT SAFETY COMMISSION Department of the Army; Corps of Engineers Sunshine Act Meeting Notice Notice of Intent To Prepare a Joint Supplemental Environmental Impact Statement and Environmental Impact Report for the Folsom Dam Modification Project, Approach Channel. Wednesday, September 7, 2011, 10–11 a.m. PLACE: Room 420, Bethesda Towers, 4330 East West Highway, Bethesda, Maryland. STATUS: Commission Meeting—Open to the public. MATTERS TO BE CONSIDERED: Briefing Matter: Proposed Safety Standard for Play Yards. A live webcast of the Meeting can be viewed at https://www.cpsc.gov/webcast. For a recorded message containing the latest agenda information, call (301) 504–7948. CONTACT PERSON FOR MORE INFORMATION: Todd A. Stevenson, Office of the Secretary, U.S. Consumer Product Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504–7923. TIME AND DATE: Dated: August 30, 2011. Todd A. Stevenson, Secretary. [FR Doc. 2011–22546 Filed 8–30–11; 4:15 pm] srobinson on DSK4SPTVN1PROD with NOTICES BILLING CODE 6355–01–P CONSUMER PRODUCT SAFETY COMMISSION Sunshine Act Meeting Notice Wednesday, September 7, 2011; 2–4 p.m. TIME AND DATE: VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 Department of the Army, U.S. Army Corps of Engineers; DoD. ACTION: Notice of intent. AGENCY: The action being taken is the preparation of a joint supplemental environmental impact statement/ environmental impact report (EIS/EIR) for the Folsom Dam Modification, Approach Channel Project. The EIS/EIR will be prepared in accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The U.S. Army Corps of Engineers (USACE) will serve as lead agency for compliance with NEPA, and the State of California Central Valley Flood Protection Board (CVFPB) will serve as lead agency for compliance with CEQA. The Folsom Dam Modification Project, Approach Channel will evaluate alternatives, including a locally preferred plan, for providing dam safety and flood damage reduction at Folsom Dam located downstream from the confluence of the North and South Forks of the American River near the city of Folsom, California. DATES: Written comments regarding the scope of the environmental analysis SUMMARY: PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 54451 should be received by November 4, 2011. ADDRESSES: Written comments concerning this study and requests to be included on the Folsom Dam Modification Project, Approach Channel mailing list should be submitted to Ms. Nancy Sandburg, U.S. Army Corps of Engineers, Sacramento District, Attn: Planning Division (CESPK–PD–RA), 1325 J Street, Sacramento, California 95814. FOR FURTHER INFORMATION CONTACT: Ms. Nancy Sandburg via telephone at (916) 557–7134, e-mail: Nancy.H.Sandburg@usace.army.mil or regular mail at (see ADDRESSES). SUPPLEMENTARY INFORMATION: 1. Proposed Action. USACE is preparing an EIS/EIR to analyze the environmental impacts associated with a range of alternatives for providing dam safety and flood damage reduction associated with Phase 4 of the action for the Folsom Dam Modification Project, Approach Channel. This project addresses design alternatives for an Approach Channel that is tiered from the 2007 Folsom Dam Safety and Flood Damage Reduction—Joint Federal Project EIS/EIR NEPA analyses to complete construction of a control structure and spillway at Folsom Dam on the American River system. 2. Alternatives. The EIS/EIR will address construction alternatives that are intended to improve dam safety and provide flood risk management within the project area. Alternatives analyzed during the investigation may include, but are not limited to, a combination of one or more of the following design measures to complete the new control structure and spillway: installation of a temporary cofferdam or cutoff walls, construction of a spur dike, blasting to remove bedrock material, dredging, terrestrial deposition of dredge material, and temporary modification of existing terrestrial sites for haul routes and staging areas. 3. Scoping Process. a. A public scoping meeting will be held to present an overview of the Folsom Dam Modification Project, Approach Channel and the EIS/EIR process, and to afford all interested parties with an opportunity to provide comments regarding the scope of analysis and potential alternatives. The public scoping meeting will be held in at the Folsom Community Center at 52 Natoma Street in Folsom, CA on October 20, 2011. Presentation will begin at 6 p.m. b. Potentially significant issues to be analyzed in depth in the EIS/EIR include project specific and cumulative E:\FR\FM\01SEN1.SGM 01SEN1

Agencies

[Federal Register Volume 76, Number 170 (Thursday, September 1, 2011)]
[Notices]
[Page 54451]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22546]


=======================================================================
-----------------------------------------------------------------------

CONSUMER PRODUCT SAFETY COMMISSION


Sunshine Act Meeting Notice

TIME AND DATE: Wednesday, September 7, 2011, 10-11 a.m.

PLACE: Room 420, Bethesda Towers, 4330 East West Highway, Bethesda, 
Maryland.

STATUS: Commission Meeting--Open to the public.

Matters To Be Considered:
    Briefing Matter: Proposed Safety Standard for Play Yards.
    A live webcast of the Meeting can be viewed at https://www.cpsc.gov/webcast.
    For a recorded message containing the latest agenda information, 
call (301) 504-7948.

CONTACT PERSON FOR MORE INFORMATION: Todd A. Stevenson, Office of the 
Secretary, U.S. Consumer Product Safety Commission, 4330 East West 
Highway, Bethesda, MD 20814, (301) 504-7923.

    Dated: August 30, 2011.
Todd A. Stevenson,
Secretary.
[FR Doc. 2011-22546 Filed 8-30-11; 4:15 pm]
BILLING CODE 6355-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.