Sunshine Act Meeting Notice, 54451 [2011-22546]
Download as PDF
Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices
Order 216–6 5.09(d) and determined
that issuance of the IHA is not likely to
result in significant impacts on the
human environment. Consequently,
NMFS has adopted NSF’s EA and
prepared a FONSI for the issuance of the
IHA. An Environmental Impact
Statement is not required and will not
be prepared for the action.
Authorization
As a result of these determinations,
NMFS has issued an IHA to UAGI for
the take of marine mammals, by Level
B harassment, incidental to conducting
a marine seismic survey in the Arctic
Ocean, September–October 2011,
provided the previously mentioned
mitigation, monitoring, and reporting
requirements are incorporated.
Dated: August 26, 2011.
James H. Lecky,
Director, Office of Protected Resources,
National Marine Fisheries Service.
Hearing Room 420, Bethesda
Towers, 4330 East West Highway,
Bethesda, Maryland.
STATUS: Closed to the Public.
MATTER TO BE CONSIDERED:
PLACE:
Compliance Status Report
The Commission staff will brief the
Commission on the status of compliance
matters.
For a recorded message containing the
latest agenda information, call (301)
504–7948.
CONTACT PERSON FOR MORE INFORMATION:
Todd A. Stevenson, Office of the
Secretary, U.S. Consumer Product
Safety Commission, 4330 East West
Highway, Bethesda, MD 20814, (301)
504–7923.
Dated: August 30, 2011.
Todd A. Stevenson,
Secretary.
[FR Doc. 2011–22547 Filed 8–30–11; 4:15 pm]
BILLING CODE 6355–01–P
[FR Doc. 2011–22434 Filed 8–31–11; 8:45 am]
BILLING CODE 3510–22–P
DEPARTMENT OF DEFENSE
CONSUMER PRODUCT SAFETY
COMMISSION
Department of the Army; Corps of
Engineers
Sunshine Act Meeting Notice
Notice of Intent To Prepare a Joint
Supplemental Environmental Impact
Statement and Environmental Impact
Report for the Folsom Dam
Modification Project, Approach
Channel.
Wednesday, September
7, 2011, 10–11 a.m.
PLACE: Room 420, Bethesda Towers,
4330 East West Highway, Bethesda,
Maryland.
STATUS: Commission Meeting—Open to
the public.
MATTERS TO BE CONSIDERED:
Briefing Matter: Proposed Safety
Standard for Play Yards.
A live webcast of the Meeting can be
viewed at https://www.cpsc.gov/webcast.
For a recorded message containing the
latest agenda information, call (301)
504–7948.
CONTACT PERSON FOR MORE INFORMATION:
Todd A. Stevenson, Office of the
Secretary, U.S. Consumer Product
Safety Commission, 4330 East West
Highway, Bethesda, MD 20814, (301)
504–7923.
TIME AND DATE:
Dated: August 30, 2011.
Todd A. Stevenson,
Secretary.
[FR Doc. 2011–22546 Filed 8–30–11; 4:15 pm]
srobinson on DSK4SPTVN1PROD with NOTICES
BILLING CODE 6355–01–P
CONSUMER PRODUCT SAFETY
COMMISSION
Sunshine Act Meeting Notice
Wednesday, September
7, 2011; 2–4 p.m.
TIME AND DATE:
VerDate Mar<15>2010
16:16 Aug 31, 2011
Jkt 223001
Department of the Army, U.S.
Army Corps of Engineers; DoD.
ACTION: Notice of intent.
AGENCY:
The action being taken is the
preparation of a joint supplemental
environmental impact statement/
environmental impact report (EIS/EIR)
for the Folsom Dam Modification,
Approach Channel Project. The EIS/EIR
will be prepared in accordance with the
National Environmental Policy Act
(NEPA) and the California
Environmental Quality Act (CEQA). The
U.S. Army Corps of Engineers (USACE)
will serve as lead agency for compliance
with NEPA, and the State of California
Central Valley Flood Protection Board
(CVFPB) will serve as lead agency for
compliance with CEQA. The Folsom
Dam Modification Project, Approach
Channel will evaluate alternatives,
including a locally preferred plan, for
providing dam safety and flood damage
reduction at Folsom Dam located
downstream from the confluence of the
North and South Forks of the American
River near the city of Folsom, California.
DATES: Written comments regarding the
scope of the environmental analysis
SUMMARY:
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
54451
should be received by November 4,
2011.
ADDRESSES: Written comments
concerning this study and requests to be
included on the Folsom Dam
Modification Project, Approach Channel
mailing list should be submitted to Ms.
Nancy Sandburg, U.S. Army Corps of
Engineers, Sacramento District, Attn:
Planning Division (CESPK–PD–RA),
1325 J Street, Sacramento, California
95814.
FOR FURTHER INFORMATION CONTACT: Ms.
Nancy Sandburg via telephone at (916)
557–7134, e-mail:
Nancy.H.Sandburg@usace.army.mil or
regular mail at (see ADDRESSES).
SUPPLEMENTARY INFORMATION:
1. Proposed Action. USACE is
preparing an EIS/EIR to analyze the
environmental impacts associated with
a range of alternatives for providing dam
safety and flood damage reduction
associated with Phase 4 of the action for
the Folsom Dam Modification Project,
Approach Channel. This project
addresses design alternatives for an
Approach Channel that is tiered from
the 2007 Folsom Dam Safety and Flood
Damage Reduction—Joint Federal
Project EIS/EIR NEPA analyses to
complete construction of a control
structure and spillway at Folsom Dam
on the American River system.
2. Alternatives. The EIS/EIR will
address construction alternatives that
are intended to improve dam safety and
provide flood risk management within
the project area. Alternatives analyzed
during the investigation may include,
but are not limited to, a combination of
one or more of the following design
measures to complete the new control
structure and spillway: installation of a
temporary cofferdam or cutoff walls,
construction of a spur dike, blasting to
remove bedrock material, dredging,
terrestrial deposition of dredge material,
and temporary modification of existing
terrestrial sites for haul routes and
staging areas.
3. Scoping Process.
a. A public scoping meeting will be
held to present an overview of the
Folsom Dam Modification Project,
Approach Channel and the EIS/EIR
process, and to afford all interested
parties with an opportunity to provide
comments regarding the scope of
analysis and potential alternatives. The
public scoping meeting will be held in
at the Folsom Community Center at 52
Natoma Street in Folsom, CA on
October 20, 2011. Presentation will
begin at 6 p.m.
b. Potentially significant issues to be
analyzed in depth in the EIS/EIR
include project specific and cumulative
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 76, Number 170 (Thursday, September 1, 2011)]
[Notices]
[Page 54451]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22546]
=======================================================================
-----------------------------------------------------------------------
CONSUMER PRODUCT SAFETY COMMISSION
Sunshine Act Meeting Notice
TIME AND DATE: Wednesday, September 7, 2011, 10-11 a.m.
PLACE: Room 420, Bethesda Towers, 4330 East West Highway, Bethesda,
Maryland.
STATUS: Commission Meeting--Open to the public.
Matters To Be Considered:
Briefing Matter: Proposed Safety Standard for Play Yards.
A live webcast of the Meeting can be viewed at https://www.cpsc.gov/webcast.
For a recorded message containing the latest agenda information,
call (301) 504-7948.
CONTACT PERSON FOR MORE INFORMATION: Todd A. Stevenson, Office of the
Secretary, U.S. Consumer Product Safety Commission, 4330 East West
Highway, Bethesda, MD 20814, (301) 504-7923.
Dated: August 30, 2011.
Todd A. Stevenson,
Secretary.
[FR Doc. 2011-22546 Filed 8-30-11; 4:15 pm]
BILLING CODE 6355-01-P