Florida Power & Light Company, St. Lucie Plant, Unit 2 License Amendment Request; Opportunity To Request a Hearing and To Petition for Leave To Intervene, and Commission Order Imposing Procedures for Document Access, 54503-54507 [2011-22405]

Download as PDF srobinson on DSK4SPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices (ADAMS): Publicly available documents created or received at the NRC are available online in the NRC Library at https://www.nrc.gov/reading-rm/ adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of the NRC’s public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC’s PDR reference staff at 1–800–397–4209, 301–415–4737, or by e-mail to pdr.resource@nrc.gov. The Draft Supplement 47 to the GEIS is available electronically under ADAMS Accession Number ML11227A007. • Federal Rulemaking Web Site: Public comments and supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC–2010– 0029. In addition, a copy of the draft supplement to the GEIS is available to local residents near the site at the Richland Public Library, 955 Northgate Drive, Richland, Washington 99352 and at the Kennewick Branch of MidColumbia Libraries, 1620 South Union Street, Kennewick, Washington 99338. All comments received by the NRC, including those made by Federal, State, and local agencies; Native American Tribes; or other interested persons, will be made available electronically at the NRC’s PDR in Rockville, Maryland, and through ADAMS. Comments received after the due date will be considered only if it is practical to do so. The NRC staff will hold public meetings prior to the close of the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comments on the document. Two meetings will be held at the Red Lion Hotel, 802 George Washington Way, Richland, Washington, on Tuesday, September 27, 2011. The first session will convene at 2 p.m. and will continue until 5 p.m., as necessary. The second session will convene at 7 p.m. and will continue until 10 p.m., as necessary. The meetings will be transcribed and will include: (1) A presentation of the contents of the draft plant-specific supplement to the GEIS and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft report. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No comments on the draft supplement to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meeting VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 or in writing. Persons may pre-register to attend or present oral comments at the meeting by contacting Mr. Daniel Doyle, the NRC Environmental Project Manager, at 1–800–368–5642, extension 3748, or by e-mail at Daniel.Doyle@nrc.gov no later than Friday, September 23, 2011. Members of the public may also register to provide oral comments within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Mr. Doyle’s attention no later than September 23, 2011, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Mr. Daniel Doyle, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop O–11F1, Washington, DC 20555–0001. Mr. Doyle may be contacted at the aforementioned telephone number or e-mail address. FOR FURTHER INFORMATION CONTACT: Dated at Rockville, Maryland, this 23rd day of August 2011. For the Nuclear Regulatory Commission. David J. Wrona, Chief, Projects Branch 2, Division of License Renewal, Office of Nuclear Reactor Regulation. [FR Doc. 2011–22415 Filed 8–31–11; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 50–389; NRC–2011–0190] Florida Power & Light Company, St. Lucie Plant, Unit 2 License Amendment Request; Opportunity To Request a Hearing and To Petition for Leave To Intervene, and Commission Order Imposing Procedures for Document Access Nuclear Regulatory Commission. ACTION: Notice of license amendment request, opportunity to request a hearing and to petition for leave to intervene, and Commission order. AGENCY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering issuance of an amendment to Facility Operating License No. NPF–16 issued to Florida Power & Light Company (the licensee) for operation of the St. Lucie Plant, Unit SUMMARY: PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 54503 No. 2, located in St. Lucie County, Florida. Requests for a hearing or leave to intervene must be filed by October 31, 2011. Any potential party as defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4 who believes access to sensitive unclassified nonsafeguards Information (SUNSI) is necessary to respond to this notice must request document access by September 12, 2011. ADDRESSES: You can access publicly available documents related to this action using the following methods: • NRC’s Public Document Room (PDR): The public may examine and have copied, for a fee, publicly available documents at the NRC’s PDR, O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available online in the NRC Library at https://www.nrc.gov/reading-rm/ adams.html. From this page, the public can gain entry into ADAMS, which provides text and image files of the NRC’s public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC’s PDR reference staff at 1–800–397–4209, 301–415–4737, or by e-mail to pdr.resource@nrc.gov. The application for amendment, dated February 25, 2011, contains proprietary information and, accordingly, those portions are being withheld from public disclosure. A redacted version of the application for amendment is available electronically under ADAMS Accession No. ML110730268. • Federal Rulemaking Web Site: Supporting materials related to this action can be found at https:// www.regulations.gov by searching on Docket ID NRC–2011–0190. FOR FURTHER INFORMATION CONTACT: Tracy J. Orf, Project Manager, Plant Licensing Branch II–2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: 301–415–2788; fax number: 301–415– 2102; e-mail: tracy.orf@nrc.gov. SUPPLEMENTARY INFORMATION: DATES: I. Introduction The NRC is considering issuance of an amendment to Facility Operating License No. NPF–16 issued to Florida Power & Light Company for Operation of the St. Lucie Plant, Unit No. 2. E:\FR\FM\01SEN1.SGM 01SEN1 54504 Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices The proposed amendment would increase the licensed core power level for St. Lucie, Unit No. 2, from 2700 megawatts thermal (MWt) to 3020 MWt. The increase in core thermal power will be approximately 12 percent, including a 10-percent power uprate and a 1.7percent measurement uncertainty recapture, over the current licensed core thermal power level and is categorized as an extended power uprate. The proposed amendment would modify the renewed facility operating license and the technical specifications to support operation at the increased core thermal power level. Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission’s regulations. The amendment will not be issued prior to a hearing unless the staff makes a determination that the amendment involves no significant hazards considerations. If a request for a hearing is received, the Commission’s staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92. srobinson on DSK4SPTVN1PROD with NOTICES II. Opportunity To Request a Hearing Requirements for hearing requests and petitions for leave to intervene are found in 10 CFR 2.309, ‘‘Hearing requests, petitions to intervene, requirements for standing, and contentions.’’ Interested persons should consult 10 CFR 2.309, which is available at the NRC’s PDR, located at O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852 (or call the PDR at 1–800–397–4209 or 301– 415–4737). The NRC regulations are also accessible online in the NRC’s Library at https://www.nrc.gov/reading-rm/ adams.html. III. Petitions for Leave To Intervene Any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written petition for leave to intervene. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the requestor/petitioner in the proceeding and how that interest may be affected by the results of the proceeding. The petition must provide the name, address, and telephone number of the requestor or petitioner and specifically VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 explain the reasons why the intervention should be permitted with particular reference to the following factors: (1) The nature of the requestor’s/ petitioner’s right under the Act to be made a party to the proceeding; (2) the nature and extent of the requestor’s/ petitioner’s property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor’s/petitioner’s interest. A petition for leave to intervene must also include a specification of the contentions that the petitioner seeks to have litigated in the hearing. For each contention, the requestor/petitioner must provide a specific statement of the issue of law or fact to be raised or controverted, as well as a brief explanation of the basis for the contention. Additionally, the requestor/ petitioner must demonstrate that the issue raised by each contention is within the scope of the proceeding and is material to the findings the NRC must make to support the granting of a license amendment in response to the application. The petition must include a concise statement of the alleged facts or expert opinions which support the position of the requestor/petitioner and on which the requestor/petitioner intends to rely at hearing, together with references to the specific sources and documents on which the requestor/ petitioner intends to rely. Finally, the petition must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact, including references to specific portions of the application for amendment that the requestor/petitioner disputes and the supporting reasons for each dispute, or, if the requestor/petitioner believes that the application for amendment fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the requestor’s/petitioner’s belief. Each contention must be one which, if proven, would entitle the requestor/ petitioner to relief. Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that person’s admitted contentions, including the opportunity to present evidence and to submit a crossexamination plan for cross-examination of witnesses, consistent with NRC regulations, policies, and procedures. The Atomic Safety and Licensing Board (the Licensing Board) will set the time and place for any prehearing PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 conferences and evidentiary hearings, and the appropriate notices will be provided. Non-timely petitions for leave to intervene and contentions, amended petitions, and supplemental petitions will not be entertained absent a determination by the Commission, the Licensing Board or a presiding officer that the petition should be granted and/ or the contentions should be admitted based upon a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). A State, county, municipality, Federally-recognized Indian Tribe, or agencies thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(d)(2). The petition should state the nature and extent of the petitioner’s interest in the proceeding. The petition should be submitted to the Commission by October 31, 2011. The petition must be filed in accordance with the filing instructions in Section IV of this document, and should meet the requirements for petitions for leave to intervene set forth in this section, except that State and Federallyrecognized Indian tribes do not need to address the standing requirements in 10 CFR 2.309(d)(1) if the facility is located within its boundaries. The entities listed above could also seek to participate in a hearing as a nonparty pursuant to 10 CFR 2.315(c). Any person who does not wish, or is not qualified, to become a party to this proceeding may request permission to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written statement of position on the issues, but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to such limits and conditions as may be imposed by the Licensing Board. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission by October 31, 2011. If a hearing is requested, the Commission will make a final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. If the final determination is that the amendment E:\FR\FM\01SEN1.SGM 01SEN1 Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices srobinson on DSK4SPTVN1PROD with NOTICES request involves a significant hazards consideration, then any hearing held would take place before the issuance of any amendment. IV. Electronic Submissions (E-Filing) All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The EFiling process requires participants to submit and serve all adjudicatory documents over the Internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the participant should contact the Office of the Secretary by e-mail at hearing. docket@nrc.gov, or by telephone at 301– 415–1677, to request (1) A digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on the NRC’s public Web site at https://www. nrc.gov/site-help/e-submittals/applycertificates.html. System requirements for accessing the E-Submittal server are detailed in the NRC’s ‘‘Guidance for Electronic Submission,’’ which is available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software. VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC’s online, Web-based submission form. In order to serve documents through the Electronic Information Exchange System, users will be required to install a Web browser plug-in from the NRC Web site. Further information on the Web-based submission form, including the installation of the Web browser plug-in, is available on the NRC’s public Web site at https://www.nrc.gov/site-help/esubmittals.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format in accordance with NRC guidance available on the NRC public Web site at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the agency’s adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ‘‘Contact Us’’ link located on the NRC Web site at https:// www.nrc.gov/site-help/e-submittals. html, by e-mail at MSHD.Resource@nrc. gov, or by a toll-free call at 1–866–672– 7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 54505 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First-class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in the NRC’s electronic hearing docket which is available to the public at https://ehd1. nrc.gov/EHD/, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. Petitions for leave to intervene must be filed no later than 60 days from September 1, 2011. Non-timely filings will not be entertained absent a determination by the presiding officer that the petition or request should be granted or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). Attorney for licensee: M.S. Ross, Attorney, Florida Power & Light, P.O. Box 14000, Juno Beach, Florida 33408– 0420. E:\FR\FM\01SEN1.SGM 01SEN1 54506 Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices Order Imposing Procedures for Access to Sensitive Unclassified NonSafeguards Information for Contention Preparation A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing sensitive unclassified non-safeguards information (SUNSI). B. Within 10 days after publication of this notice of hearing and opportunity to petition for leave to intervene, any potential party as defined in 10 CFR 2.4 who believes access to SUNSI is necessary to respond to this notice may request such access. A ‘‘potential party’’ is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI submitted later than 10 days after publication will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier. C. The requestor shall submit a letter requesting permission to access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Associate General Counsel for Hearings, Enforcement and Administration, Office of the General Counsel, Washington, DC 20555–0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail address for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and OGC mailcenter@nrc.gov, respectively.1 The request must include the following information: (1) A description of the licensing action with a citation to this Federal Register notice; (2) The name and address of the potential party and a description of the potential party’s particularized interest that could be harmed by the action identified in C.(1); and (3) The identity of the individual or entity requesting access to SUNSI and the requestor’s basis for the need for the srobinson on DSK4SPTVN1PROD with NOTICES 1 While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC’s ‘‘E-Filing Rule,’’ the initial request to access SUNSI under these procedures should be submitted as described in this paragraph. VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly-available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention. D. Based on an evaluation of the information submitted under paragraph C.(3) the NRC staff will determine within 10 days of receipt of the request whether: (1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and (2) The requestor has established a legitimate need for access to SUNSI. E. If the NRC staff determines that the requestor satisfies both D.(1) and D.(2) above, the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order 2 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI. F. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI must be filed by the requestor no later than 25 days after the requestor is granted access to that information. However, if more than 25 days remain between the date the petitioner is granted access to the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. G. Review of Denials of Access. (1) If the request for access to SUNSI is denied by the NRC staff either after a determination on standing and need for access, or after a determination on trustworthiness and reliability, the NRC staff shall immediately notify the 2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request. PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 requestor in writing, briefly stating the reason or reasons for the denial. (2) The requestor may challenge the NRC staff’s adverse determination by filing a challenge within 5 days of receipt of that determination with: (a) The presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if he or she is unavailable, another administrative judge, or an administrative law judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer. H. Review of Grants of Access. A party other than the requestor may challenge an NRC staff determination granting access to SUNSI whose release would harm that party’s interest independent of the proceeding. Such a challenge must be filed with the Chief Administrative Judge within 5 days of the notification by the NRC staff of its grant of access. If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311.3 I. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR part 2. Attachment 1 to this Order summarizes the general target schedule for processing and resolving requests under these procedures. It Is So Ordered. Dated at Rockville, Maryland, this 26th day of August 2011. For the Nuclear Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. 3 Requestors should note that the filing requirements of the NRC’s E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as applicable), but not to the initial SUNSI request submitted to the NRC staff under these procedures. E:\FR\FM\01SEN1.SGM 01SEN1 Federal Register / Vol. 76, No. 170 / Thursday, September 1, 2011 / Notices 54507 ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING Day Event/Activity 0 ......................... Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests. Deadline for submitting requests for access to sensitive unclassified non-safeguards information (SUNSI) with information: Supporting the standing of a potential party identified by name and address; describing the need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 requestor/petitioner reply). Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff’s grant of access. Deadline for NRC staff reply to motions to reverse NRC staff determination(s). (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for SUNSI. If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order. Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later deadline. (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI. (Answer receipt +7) Petitioner/Intervenor reply to answers. Decision on contention admission. 10 ....................... 60 ....................... 20 ....................... 25 ....................... 30 ....................... 40 ....................... A ........................ A + 3 .................. A + 28 ................ A + 53 ................ A + 60 ................ >A + 60 .............. cannot be given except for comments received on or before this date. [FR Doc. 2011–22405 Filed 8–31–11; 8:45 am] BILLING CODE 7590–01–P Submitting Comments and Accessing Information Please include Docket ID NRC–2011–0201 in the subject line of your comments. For additional instructions on submitting comments and instructions on accessing documents related to this action, see ‘‘Submitting Comments and Accessing Information’’ in the SUPPLEMENTARY INFORMATION section of this document. You may submit comments by any one of the following methods: • Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC–2011–0201. Address questions about NRC dockets to Carol Gallagher, telephone: 301–492–3668; e-mail: Carol.Gallagher@nrc.gov. • Mail comments to: Cindy Bladey, Chief, Rules, Announcements, and Directives Branch (RADB), Office of Administration, Mail Stop: TWB–05– B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. • Fax comments to: RADB at 301– 492–3446. Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site, https:// www.regulations.gov. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed. You can access publicly available documents related to this document using the following methods: • NRC’s Public Document Room (PDR): The public may examine and have copied, for a fee, publicly available documents at the NRC’s PDR, O1–F21, ADDRESSES: NUCLEAR REGULATORY COMMISSION [NRC–2011–0204] Proposed Generic Communication; Draft NRC Generic Letter 2011–XX: Seismic Risk Evaluations for Operating Reactors Nuclear Regulatory Commission. ACTION: Notice of opportunity for public comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is issuing this generic letter to inform addressees that the NRC requests addressees to evaluate their facilities to determine the current level of seismic risk and to submit the requested information to facilitate the NRC’s determination if there is a need for additional regulatory action. DATES: Comment period expires October 31, 2011. Comments submitted after this date will be considered if it is practical to do so, but assurance of consideration srobinson on DSK4SPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 16:16 Aug 31, 2011 Jkt 223001 SUPPLEMENTARY INFORMATION: PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1

Agencies

[Federal Register Volume 76, Number 170 (Thursday, September 1, 2011)]
[Notices]
[Pages 54503-54507]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22405]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-389; NRC-2011-0190]


Florida Power & Light Company, St. Lucie Plant, Unit 2 License 
Amendment Request; Opportunity To Request a Hearing and To Petition for 
Leave To Intervene, and Commission Order Imposing Procedures for 
Document Access

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of license amendment request, opportunity to request a 
hearing and to petition for leave to intervene, and Commission order.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) 
is considering issuance of an amendment to Facility Operating License 
No. NPF-16 issued to Florida Power & Light Company (the licensee) for 
operation of the St. Lucie Plant, Unit No. 2, located in St. Lucie 
County, Florida.

DATES: Requests for a hearing or leave to intervene must be filed by 
October 31, 2011. Any potential party as defined in Title 10 of the 
Code of Federal Regulations (10 CFR) 2.4 who believes access to 
sensitive unclassified non-safeguards Information (SUNSI) is necessary 
to respond to this notice must request document access by September 12, 
2011.

ADDRESSES: You can access publicly available documents related to this 
action using the following methods:
     NRC's Public Document Room (PDR): The public may examine 
and have copied, for a fee, publicly available documents at the NRC's 
PDR, O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland 20852.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): Publicly available documents created or received at the NRC 
are available online in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS, 
which provides text and image files of the NRC's public documents. If 
you do not have access to ADAMS or if there are problems in accessing 
the documents located in ADAMS, contact the NRC's PDR reference staff 
at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. 
The application for amendment, dated February 25, 2011, contains 
proprietary information and, accordingly, those portions are being 
withheld from public disclosure. A redacted version of the application 
for amendment is available electronically under ADAMS Accession No. 
ML110730268.
     Federal Rulemaking Web Site: Supporting materials related 
to this action can be found at https://www.regulations.gov by searching 
on Docket ID NRC-2011-0190.

FOR FURTHER INFORMATION CONTACT: Tracy J. Orf, Project Manager, Plant 
Licensing Branch II-2, Division of Operating Reactor Licensing, Office 
of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555. Telephone: 301-415-2788; fax number: 301-415-
2102; e-mail: tracy.orf@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is considering issuance of an amendment to Facility 
Operating License No. NPF-16 issued to Florida Power & Light Company 
for Operation of the St. Lucie Plant, Unit No. 2.

[[Page 54504]]

    The proposed amendment would increase the licensed core power level 
for St. Lucie, Unit No. 2, from 2700 megawatts thermal (MWt) to 3020 
MWt. The increase in core thermal power will be approximately 12 
percent, including a 10-percent power uprate and a 1.7-percent 
measurement uncertainty recapture, over the current licensed core 
thermal power level and is categorized as an extended power uprate. The 
proposed amendment would modify the renewed facility operating license 
and the technical specifications to support operation at the increased 
core thermal power level.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    The amendment will not be issued prior to a hearing unless the 
staff makes a determination that the amendment involves no significant 
hazards considerations. If a request for a hearing is received, the 
Commission's staff may issue the amendment after it completes its 
technical review and prior to the completion of any required hearing if 
it publishes a further notice for public comment of its proposed 
finding of no significant hazards consideration in accordance with 10 
CFR 50.91 and 50.92.

II. Opportunity To Request a Hearing

    Requirements for hearing requests and petitions for leave to 
intervene are found in 10 CFR 2.309, ``Hearing requests, petitions to 
intervene, requirements for standing, and contentions.'' Interested 
persons should consult 10 CFR 2.309, which is available at the NRC's 
PDR, located at O1-F21, One White Flint North, 11555 Rockville Pike, 
Rockville, Maryland 20852 (or call the PDR at 1-800-397-4209 or 301-
415-4737). The NRC regulations are also accessible online in the NRC's 
Library at https://www.nrc.gov/reading-rm/adams.html.

III. Petitions for Leave To Intervene

    Any person whose interest may be affected by this proceeding and 
who wishes to participate as a party in the proceeding must file a 
written petition for leave to intervene. As required by 10 CFR 2.309, a 
petition for leave to intervene shall set forth with particularity the 
interest of the requestor/petitioner in the proceeding and how that 
interest may be affected by the results of the proceeding. The petition 
must provide the name, address, and telephone number of the requestor 
or petitioner and specifically explain the reasons why the intervention 
should be permitted with particular reference to the following factors: 
(1) The nature of the requestor's/petitioner's right under the Act to 
be made a party to the proceeding; (2) the nature and extent of the 
requestor's/petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any decision or order which 
may be entered in the proceeding on the requestor's/petitioner's 
interest.
    A petition for leave to intervene must also include a specification 
of the contentions that the petitioner seeks to have litigated in the 
hearing. For each contention, the requestor/petitioner must provide a 
specific statement of the issue of law or fact to be raised or 
controverted, as well as a brief explanation of the basis for the 
contention. Additionally, the requestor/petitioner must demonstrate 
that the issue raised by each contention is within the scope of the 
proceeding and is material to the findings the NRC must make to support 
the granting of a license amendment in response to the application. The 
petition must include a concise statement of the alleged facts or 
expert opinions which support the position of the requestor/petitioner 
and on which the requestor/petitioner intends to rely at hearing, 
together with references to the specific sources and documents on which 
the requestor/petitioner intends to rely. Finally, the petition must 
provide sufficient information to show that a genuine dispute exists 
with the applicant on a material issue of law or fact, including 
references to specific portions of the application for amendment that 
the requestor/petitioner disputes and the supporting reasons for each 
dispute, or, if the requestor/petitioner believes that the application 
for amendment fails to contain information on a relevant matter as 
required by law, the identification of each failure and the supporting 
reasons for the requestor's/petitioner's belief. Each contention must 
be one which, if proven, would entitle the requestor/petitioner to 
relief.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing with respect to resolution of that person's admitted 
contentions, including the opportunity to present evidence and to 
submit a cross-examination plan for cross-examination of witnesses, 
consistent with NRC regulations, policies, and procedures. The Atomic 
Safety and Licensing Board (the Licensing Board) will set the time and 
place for any prehearing conferences and evidentiary hearings, and the 
appropriate notices will be provided.
    Non-timely petitions for leave to intervene and contentions, 
amended petitions, and supplemental petitions will not be entertained 
absent a determination by the Commission, the Licensing Board or a 
presiding officer that the petition should be granted and/or the 
contentions should be admitted based upon a balancing of the factors 
specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A State, county, municipality, Federally-recognized Indian Tribe, 
or agencies thereof, may submit a petition to the Commission to 
participate as a party under 10 CFR 2.309(d)(2). The petition should 
state the nature and extent of the petitioner's interest in the 
proceeding. The petition should be submitted to the Commission by 
October 31, 2011. The petition must be filed in accordance with the 
filing instructions in Section IV of this document, and should meet the 
requirements for petitions for leave to intervene set forth in this 
section, except that State and Federally-recognized Indian tribes do 
not need to address the standing requirements in 10 CFR 2.309(d)(1) if 
the facility is located within its boundaries. The entities listed 
above could also seek to participate in a hearing as a nonparty 
pursuant to 10 CFR 2.315(c).
    Any person who does not wish, or is not qualified, to become a 
party to this proceeding may request permission to make a limited 
appearance pursuant to the provisions of 10 CFR 2.315(a). A person 
making a limited appearance may make an oral or written statement of 
position on the issues, but may not otherwise participate in the 
proceeding. A limited appearance may be made at any session of the 
hearing or at any prehearing conference, subject to such limits and 
conditions as may be imposed by the Licensing Board. Persons desiring 
to make a limited appearance are requested to inform the Secretary of 
the Commission by October 31, 2011.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment

[[Page 54505]]

request involves a significant hazards consideration, then any hearing 
held would take place before the issuance of any amendment.

IV. Electronic Submissions (E-Filing)

    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007). The E-Filing process requires participants to submit 
and serve all adjudicatory documents over the Internet, or in some 
cases to mail copies on electronic storage media. Participants may not 
submit paper copies of their filings unless they seek an exemption in 
accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by e-mail at 
hearing.docket@nrc.gov, or by telephone at 301-415-1677, to request (1) 
A digital identification (ID) certificate, which allows the participant 
(or its counsel or representative) to digitally sign documents and 
access the E-Submittal server for any proceeding in which it is 
participating; and (2) advise the Secretary that the participant will 
be submitting a request or petition for hearing (even in instances in 
which the participant, or its counsel or representative, already holds 
an NRC-issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in the NRC's ``Guidance for 
Electronic Submission,'' which is available on the NRC's public Web 
site at https://www.nrc.gov/site-help/e-submittals.html. Participants 
may attempt to use other software not listed on the Web site, but 
should note that the NRC's E-Filing system does not support unlisted 
software, and the NRC Meta System Help Desk will not be able to offer 
assistance in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene. Submissions should be in 
Portable Document Format in accordance with NRC guidance available on 
the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the 
documents are submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
E-Filing system also distributes an e-mail notice that provides access 
to the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at 
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The 
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., 
Eastern Time, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First-class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 
20852, Attention: Rulemaking and Adjudications Staff. Participants 
filing a document in this manner are responsible for serving the 
document on all other participants. Filing is considered complete by 
first-class mail as of the time of deposit in the mail, or by courier, 
express mail, or expedited delivery service upon depositing the 
document with the provider of the service. A presiding officer, having 
granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the 
Commission, or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    Petitions for leave to intervene must be filed no later than 60 
days from September 1, 2011. Non-timely filings will not be entertained 
absent a determination by the presiding officer that the petition or 
request should be granted or the contentions should be admitted, based 
on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-
(viii).
    Attorney for licensee: M.S. Ross, Attorney, Florida Power & Light, 
P.O. Box 14000, Juno Beach, Florida 33408-0420.

[[Page 54506]]

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation

    A. This Order contains instructions regarding how potential parties 
to this proceeding may request access to documents containing sensitive 
unclassified non-safeguards information (SUNSI).
    B. Within 10 days after publication of this notice of hearing and 
opportunity to petition for leave to intervene, any potential party as 
defined in 10 CFR 2.4 who believes access to SUNSI is necessary to 
respond to this notice may request such access. A ``potential party'' 
is any person who intends to participate as a party by demonstrating 
standing and filing an admissible contention under 10 CFR 2.309. 
Requests for access to SUNSI submitted later than 10 days after 
publication will not be considered absent a showing of good cause for 
the late filing, addressing why the request could not have been filed 
earlier.
    C. The requestor shall submit a letter requesting permission to 
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and provide a copy to the Associate General 
Counsel for Hearings, Enforcement and Administration, Office of the 
General Counsel, Washington, DC 20555-0001. The expedited delivery or 
courier mail address for both offices is: U.S. Nuclear Regulatory 
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The e-mail 
address for the Office of the Secretary and the Office of the General 
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov, 
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------

    \1\ While a request for hearing or petition to intervene in this 
proceeding must comply with the filing requirements of the NRC's 
``E-Filing Rule,'' the initial request to access SUNSI under these 
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------

    (1) A description of the licensing action with a citation to this 
Federal Register notice;
    (2) The name and address of the potential party and a description 
of the potential party's particularized interest that could be harmed 
by the action identified in C.(1); and
    (3) The identity of the individual or entity requesting access to 
SUNSI and the requestor's basis for the need for the information in 
order to meaningfully participate in this adjudicatory proceeding. In 
particular, the request must explain why publicly-available versions of 
the information requested would not be sufficient to provide the basis 
and specificity for a proffered contention.
    D. Based on an evaluation of the information submitted under 
paragraph C.(3) the NRC staff will determine within 10 days of receipt 
of the request whether:
    (1) There is a reasonable basis to believe the petitioner is likely 
to establish standing to participate in this NRC proceeding; and
    (2) The requestor has established a legitimate need for access to 
SUNSI.
    E. If the NRC staff determines that the requestor satisfies both 
D.(1) and D.(2) above, the NRC staff will notify the requestor in 
writing that access to SUNSI has been granted. The written notification 
will contain instructions on how the requestor may obtain copies of the 
requested documents, and any other conditions that may apply to access 
to those documents. These conditions may include, but are not limited 
to, the signing of a Non-Disclosure Agreement or Affidavit, or 
Protective Order \2\ setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI by each individual who 
will be granted access to SUNSI.
---------------------------------------------------------------------------

    \2\ Any motion for Protective Order or draft Non-Disclosure 
Affidavit or Agreement for SUNSI must be filed with the presiding 
officer or the Chief Administrative Judge if the presiding officer 
has not yet been designated, within 30 days of the deadline for the 
receipt of the written access request.
---------------------------------------------------------------------------

    F. Filing of Contentions. Any contentions in these proceedings that 
are based upon the information received as a result of the request made 
for SUNSI must be filed by the requestor no later than 25 days after 
the requestor is granted access to that information. However, if more 
than 25 days remain between the date the petitioner is granted access 
to the information and the deadline for filing all other contentions 
(as established in the notice of hearing or opportunity for hearing), 
the petitioner may file its SUNSI contentions by that later deadline.
    G. Review of Denials of Access.
    (1) If the request for access to SUNSI is denied by the NRC staff 
either after a determination on standing and need for access, or after 
a determination on trustworthiness and reliability, the NRC staff shall 
immediately notify the requestor in writing, briefly stating the reason 
or reasons for the denial.
    (2) The requestor may challenge the NRC staff's adverse 
determination by filing a challenge within 5 days of receipt of that 
determination with: (a) The presiding officer designated in this 
proceeding; (b) if no presiding officer has been appointed, the Chief 
Administrative Judge, or if he or she is unavailable, another 
administrative judge, or an administrative law judge with jurisdiction 
pursuant to 10 CFR 2.318(a); or (c) if another officer has been 
designated to rule on information access issues, with that officer.
    H. Review of Grants of Access. A party other than the requestor may 
challenge an NRC staff determination granting access to SUNSI whose 
release would harm that party's interest independent of the proceeding. 
Such a challenge must be filed with the Chief Administrative Judge 
within 5 days of the notification by the NRC staff of its grant of 
access.
    If challenges to the NRC staff determinations are filed, these 
procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\3\
---------------------------------------------------------------------------

    \3\ Requestors should note that the filing requirements of the 
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals 
of NRC staff determinations (because they must be served on a 
presiding officer or the Commission, as applicable), but not to the 
initial SUNSI request submitted to the NRC staff under these 
procedures.
---------------------------------------------------------------------------

    I. The Commission expects that the NRC staff and presiding officers 
(and any other reviewing officers) will consider and resolve requests 
for access to SUNSI, and motions for protective orders, in a timely 
fashion in order to minimize any unnecessary delays in identifying 
those petitioners who have standing and who have propounded contentions 
meeting the specificity and basis requirements in 10 CFR part 2. 
Attachment 1 to this Order summarizes the general target schedule for 
processing and resolving requests under these procedures.
    It Is So Ordered.

    Dated at Rockville, Maryland, this 26th day of August 2011.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

[[Page 54507]]



   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
                           in This Proceeding
------------------------------------------------------------------------
              Day                            Event/Activity
------------------------------------------------------------------------
0.............................  Publication of Federal Register notice
                                 of hearing and opportunity to petition
                                 for leave to intervene, including order
                                 with instructions for access requests.
10............................  Deadline for submitting requests for
                                 access to sensitive unclassified non-
                                 safeguards information (SUNSI) with
                                 information: Supporting the standing of
                                 a potential party identified by name
                                 and address; describing the need for
                                 the information in order for the
                                 potential party to participate
                                 meaningfully in an adjudicatory
                                 proceeding.
60............................  Deadline for submitting petition for
                                 intervention containing: (i)
                                 Demonstration of standing; (ii) all
                                 contentions whose formulation does not
                                 require access to SUNSI (+25 Answers to
                                 petition for intervention; +7 requestor/
                                 petitioner reply).
20............................  Nuclear Regulatory Commission (NRC)
                                 staff informs the requestor of the
                                 staff's determination whether the
                                 request for access provides a
                                 reasonable basis to believe standing
                                 can be established and shows need for
                                 SUNSI. (NRC staff also informs any
                                 party to the proceeding whose interest
                                 independent of the proceeding would be
                                 harmed by the release of the
                                 information.) If NRC staff makes the
                                 finding of need for SUNSI and
                                 likelihood of standing, NRC staff
                                 begins document processing (preparation
                                 of redactions or review of redacted
                                 documents).
25............................  If NRC staff finds no ``need'' or no
                                 likelihood of standing, the deadline
                                 for requestor/petitioner to file a
                                 motion seeking a ruling to reverse the
                                 NRC staff's denial of access; NRC staff
                                 files copy of access determination with
                                 the presiding officer (or Chief
                                 Administrative Judge or other
                                 designated officer, as appropriate). If
                                 NRC staff finds ``need'' for SUNSI, the
                                 deadline for any party to the
                                 proceeding whose interest independent
                                 of the proceeding would be harmed by
                                 the release of the information to file
                                 a motion seeking a ruling to reverse
                                 the NRC staff's grant of access.
30............................  Deadline for NRC staff reply to motions
                                 to reverse NRC staff determination(s).
40............................  (Receipt +30) If NRC staff finds
                                 standing and need for SUNSI, deadline
                                 for NRC staff to complete information
                                 processing and file motion for
                                 Protective Order and draft Non-
                                 Disclosure Affidavit. Deadline for
                                 applicant/licensee to file Non-
                                 Disclosure Agreement for SUNSI.
A.............................  If access granted: Issuance of presiding
                                 officer or other designated officer
                                 decision on motion for protective order
                                 for access to sensitive information
                                 (including schedule for providing
                                 access and submission of contentions)
                                 or decision reversing a final adverse
                                 determination by the NRC staff.
A + 3.........................  Deadline for filing executed Non-
                                 Disclosure Affidavits. Access provided
                                 to SUNSI consistent with decision
                                 issuing the protective order.
A + 28........................  Deadline for submission of contentions
                                 whose development depends upon access
                                 to SUNSI. However, if more than 25 days
                                 remain between the petitioner's receipt
                                 of (or access to) the information and
                                 the deadline for filing all other
                                 contentions (as established in the
                                 notice of hearing or opportunity for
                                 hearing), the petitioner may file its
                                 SUNSI contentions by that later
                                 deadline.
A + 53........................  (Contention receipt +25) Answers to
                                 contentions whose development depends
                                 upon access to SUNSI.
A + 60........................  (Answer receipt +7) Petitioner/
                                 Intervenor reply to answers.
>A + 60.......................  Decision on contention admission.
------------------------------------------------------------------------

[FR Doc. 2011-22405 Filed 8-31-11; 8:45 am]
BILLING CODE 7590-01-P