Carolina Power & Light, Shearon Harris Nuclear Power Plant, Unit 1; Notice of Consideration of Approval of Application for Indirect License Transfer Resulting From the Proposed Merger Between Progress Energy, Inc. and Duke Energy Corporation, and Opportunity for Hearing, 53967-53969 [2011-22100]
Download as PDF
Federal Register / Vol. 76, No. 168 / Tuesday, August 30, 2011 / Notices
NATIONAL COUNCIL ON DISABILITY
Sunshine Act Meetings
The Members of the
National Council on Disability (NCD)
will meet by phone on Wednesday,
September 7, 2011, 1–3 p.m., ET.
PLACE: The meeting will occur by
phone. NCD staff will participate in the
call from the NCD office at 1331 F
Street, NW., Suite 850, Washington, DC
20004. Interested parties may join the
meeting in person at the NCD office or
may join the phone line in a listeningonly capacity using the following callin information: Call-in number: 1–888–
819–8001; Passcode: 3417257; Meeting
Name: NCD Meeting. If asked, the
conference call’s leader’s name is Aaron
Bishop.
MATTERS TO BE CONSIDERED: The Council
will meet by phone to discuss the
budgets for fiscal years 2012 and 2013
as well as the agency’s Performance and
Accountability Report (PAR).
CONTACT PERSON FOR MORE INFORMATION:
Anne Sommers, NCD, 1331 F Street,
NW., Suite 850, Washington, DC 20004;
202–272–2004 (V), 202–272–2074
(TTY).
ACCOMMODATIONS: Those who plan to
attend and require accommodations
should notify NCD as soon as possible
to allow time to make arrangements.
TIME AND DATES:
Dated: August 25, 2011.
Aaron Bishop,
Executive Director.
BILLING CODE 6820–MA–P
NATIONAL TRANSPORTATION
SAFETY BOARD
Sunshine Act Meeting
9:30 a.m., Tuesday,
September 13, 2011.
PLACE: NTSB Conference Center, 429
L’Enfant Plaza SW., Washington, DC
20594.
STATUS: The ONE item is open to the
public.
MATTER TO BE CONSIDERED: 8220A
Highway Accident Report—TruckTractor Semitrailer Median Crossover
Collision With 15–Passenger Van,
Munfordville, Kentucky, March 26,
2010.
NEWS MEDIA CONTACT: Telephone: (202)
314–6100.
The press and public may enter the
NTSB Conference Center one hour prior
to the meeting for set up and seating.
Individuals requesting specific
accommodations should contact
mstockstill on DSK4VPTVN1PROD with NOTICES
TIME AND DATE:
20:31 Aug 29, 2011
Dated: August 26, 2011.
Candi R. Bing
Federal Register Liaison Officer.
[FR Doc. 2011–22253 Filed 8–26–11; 4:15 pm]
BILLING CODE 7533–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–400; NRC–2011–0200]
Carolina Power & Light, Shearon
Harris Nuclear Power Plant, Unit 1;
Notice of Consideration of Approval of
Application for Indirect License
Transfer Resulting From the Proposed
Merger Between Progress Energy, Inc.
and Duke Energy Corporation, and
Opportunity for Hearing
Nuclear Regulatory
Commission.
ACTION: Notice of request for indirect
license transfer, opportunity to
comment, opportunity to request a
hearing.
AGENCY:
Comments must be filed by
September 29, 2011. A request for a
hearing must be filed by September 19,
2011.
ADDRESSES: Please include Docket ID
NRC–2011–0200 in the subject line of
your comments. For additional
instructions on submitting comments
and instructions on accessing
documents related to this action, see
‘‘Submitting Comments and Accessing
Information’’ in the SUPPLEMENTARY
INFORMATION section of this
document. You may submit comments
by any one of the following methods:
• Federal Rulemaking Web Site: Go to
https://www.regulations.gov and search
for documents filed under Docket ID
NRC–2011–0200. Address questions
about NRC dockets to Carol Gallagher,
telephone: 301–492–3668; e-mail:
Carol.Gallagher@nrc.gov.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
• Fax comments to: RADB at 301–
492–3446.
DATES:
[FR Doc. 2011–22202 Filed 8–26–11; 11:15 am]
VerDate Mar<15>2010
Rochelle Hall at (202) 314–6305 by
Friday, September 9, 2011.
The public may view the meeting via
a live or archived webcast by accessing
a link under ‘‘News & Events’’ on the
NTSB home page at https://
www.ntsb.gov.
FOR FURTHER INFORMATION CONTACT:
Candi Bing, (202) 314–6403 or by e-mail
at bingc@ntsb.gov.
Jkt 223001
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
53967
SUPPLEMENTARY INFORMATION:
Submitting Comments and Accessing
Information
Comments submitted in writing or in
electronic form will be posted on the
NRC Web site and on the Federal
rulemaking Web site, https://
www.regulations.gov. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed.
The NRC requests that any party
soliciting or aggregating comments
received from other persons for
submission to the NRC inform those
persons that the NRC will not edit their
comments to remove any identifying or
contact information, and therefore, they
should not include any information in
their comments that they do not want
publicly disclosed.
You can access publicly available
documents related to this document
using the following methods:
• NRC’s Public Document Room
(PDR): The public may examine and
have copied, for a fee, publicly available
documents at the NRC’s PDR, O1–F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): Publicly available documents
created or received at the NRC are
available online in the NRC Library at
https://www.nrc.gov/reading-rm/
adams.html. From this page, the public
can gain entry into ADAMS, which
provides text and image files of the
NRC’s public documents. If you do not
have access to ADAMS or if there are
problems in accessing the documents
located in ADAMS, contact the NRC’s
PDR reference staff at 1–800–397–4209,
301–415–4737, or by e-mail to
pdr.resource@nrc.gov. The application
dated March 30, 2011, is available
electronically under ADAMS Accession
No. ML11110A031.
• Federal Rulemaking Web Site:
Public comments and supporting
materials related to this notice can be
found at https://www.regulations.gov by
searching on Docket ID NRC–2011–
0200. The application dated March 30,
2011, is available electronically under
ADAMS Accession No. ML11110A031.
FOR FURTHER INFORMATION CONTACT:
Farideh E. Saba, Senior Project Manager,
Plant Licensing Branch 2–2, Division of
Operating Reactor Licensing, Office of
Nuclear Reactor Regulation, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555. Telephone:
E:\FR\FM\30AUN1.SGM
30AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
53968
Federal Register / Vol. 76, No. 168 / Tuesday, August 30, 2011 / Notices
301–415–1447; fax number: 301–415–
2102; e-mail: Farideh.Saba@nrc.gov.
The Commission is considering the
issuance of an order under Title 10 of
Code of Federal Regulations (10 CFR)
50.80 approving the indirect transfer of
the Renewed Facility Operating License
No. NFP–63 for Shearon Harris Nuclear
Power Plant, Unit 1 (HNP), currently
held by Carolina Power & Light
Company, as owner and licensed
operator.
According to the application for
approval dated March 30, 2011, filed by
Carolina Power & Light Company
(CP&L, the licensee), Progress Energy,
Inc. (Progress Energy, the licensee’s
current ultimate parent corporation)
seeks approval pursuant to 10 CFR
50.80 for indirect transfer of control of
HNP, along with Brunswick Steam
Electric Plant (BSEP), Units 1 and 2,
including BSEP Independent Spent Fuel
Storage Installation, H.B. Robinson
Steam Electric Plant (Robinson), Unit 2,
Robinson Independent Spent Fuel
Storage Installations, and Crystal River
Unit 3 Nuclear Generating Plant.
Progress Energy would merge with Duke
Energy Corporation (Duke Energy). The
merged company would become the
ultimate parent of the current licensee.
CP&L will continue to own and operate
the licensed facility in accordance with
the license.
According to the application, under
the terms of the Merger Agreement,
Diamond Acquisition Corporation
(Merger Sub), a wholly owned direct
subsidiary of Duke Energy, will merge
with and into Progress Energy. Progress
Energy will become a wholly owned
direct subsidiary of Duke Energy and
the former shareholders of Progress
Energy will become shareholders of
Duke Energy. The current licensee will
remain a wholly owned subsidiary of
Progress Energy and will continue to
operate the HNP facility.
According to the application, it is
anticipated that Duke Energy
shareholders will own approximately 63
percent of the combined company and
Progress Energy shareholders will own
approximately 37 percent of the
combined company on a fully diluted
basis.
According to the application, when
the transaction is completed, Duke
Energy will have an eighteen-member
board of directors. All eleven current
directors of Duke Energy will continue
as directors when the transaction is
complete, subject to their ability and
willingness to serve. Progress Energy,
after consultation with Duke Energy,
designated seven of the current directors
of Progress Energy to be added to the
board of directors of Duke Energy when
VerDate Mar<15>2010
20:31 Aug 29, 2011
Jkt 223001
the transaction is complete, similarly
subject to their ability and willingness
to serve.
According to the application, the
technical qualifications of the licensees
are not affected by the proposed indirect
transfers of control of the HNP license.
The current licensee will at all times
remain the licensed operator of HNP. No
conforming amendments will be
required to the facility operating license
as a result of the proposed transaction.
The nuclear operating organization for
the licensed facility is expected to
remain essentially unchanged as a result
of the acquisition. Specifically, the
proposed indirect transfer of control
will not result in any change in the role
of the CP&L as the licensed operator of
the licensed facility and will not result
in any changes to its financial
qualifications, decommissioning
funding assurance, or technical
qualifications. CP&L will retain the
requisite qualifications to own and
operate the licensed facility.
No physical changes to the above
listed facilities or operational changes
are being proposed in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve an
application for the indirect transfer of a
license, if the Commission determines
that the proposed merger will not affect
the qualifications of the licensee to hold
the license, and that the transfer is
otherwise consistent with applicable
provisions of law, regulations, and
orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person(s)
whose interest may be affected by the
Commission’s action on the application
may request a hearing and intervention
via electronic submission through the
NRC E-Filing system. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii). NRC regulations are
accessible electronically from the NRC
Library on the NRC Web site at https://
www.nrc.gov/reading-rm/doccollections/cfr/.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E–Filing rule
(72 FR 49139, August 28, 2007). The E–
Filing process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E–Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by e-mail at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) A digital
ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E–Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the E–
Submittal server are detailed in NRC’s
‘‘Guidance for Electronic Submission,’’
which is available on the agency’s
E:\FR\FM\30AUN1.SGM
30AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 168 / Tuesday, August 30, 2011 / Notices
public Web site at https://www.nrc.gov/
site-help/e-submittals.html. Participants
may attempt to use other software not
listed on the Web site, but should note
that the NRC’s E–Filing system does not
support unlisted software, and the NRC
Meta System Help Desk will not be able
to offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E–Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through Electronic
Information Exchange, users will be
required to install a Web browser plugin from the NRC Web site. Further
information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E–Filing
system. To be timely, an electronic
filing must be submitted to the E–Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E–Filing system
time-stamps the document and sends
the submitter an e-mail notice
confirming receipt of the document. The
E–Filing system also distributes an email notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E–Filing system.
A person filing electronically using
the agency’s adjudicatory E–Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-help/esubmittals.html, by e-mail at
VerDate Mar<15>2010
20:31 Aug 29, 2011
Jkt 223001
MSHD.Resource@nrc.gov, or by a tollfree call at 866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E–Filing, may
require a participant or party to use E–
Filing if the presiding officer
subsequently determines that the reason
for granting the exemption from use of
E–Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/EHD/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 20 days from the
date of publication of this notice. Nontimely filings will not be entertained
absent a determination by the presiding
officer that the petition or request
PO 00000
Frm 00095
Fmt 4703
Sfmt 9990
53969
should be granted or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
Within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
license transfer application, see the
application dated March 30, 2011,
available for public inspection at the
Commission’s Public Document Room
(PDR), located at One White Flint North,
Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available documents
created or received at the NRC are
accessible electronically through
ADAMS in the NRC Library at https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, or 301–415–4737 or by e-mail
to pdr.resource@nrc.gov.
Dated at Rockville, Maryland this 22nd day
of August 2011.
For the Nuclear Regulatory Commission.
Farideh E. Saba,
Senior Project Manager, Plant Licensing
Branch 2–2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2011–22100 Filed 8–29–11; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 76, Number 168 (Tuesday, August 30, 2011)]
[Notices]
[Pages 53967-53969]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22100]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-400; NRC-2011-0200]
Carolina Power & Light, Shearon Harris Nuclear Power Plant, Unit
1; Notice of Consideration of Approval of Application for Indirect
License Transfer Resulting From the Proposed Merger Between Progress
Energy, Inc. and Duke Energy Corporation, and Opportunity for Hearing
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of request for indirect license transfer, opportunity to
comment, opportunity to request a hearing.
-----------------------------------------------------------------------
DATES: Comments must be filed by September 29, 2011. A request for a
hearing must be filed by September 19, 2011.
ADDRESSES: Please include Docket ID NRC-2011-0200 in the subject line
of your comments. For additional instructions on submitting comments
and instructions on accessing documents related to this action, see
``Submitting Comments and Accessing Information'' in the SUPPLEMENTARY
INFORMATION section of this document. You may submit comments by any
one of the following methods:
Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC-
2011-0200. Address questions about NRC dockets to Carol Gallagher,
telephone: 301-492-3668; e-mail: Carol.Gallagher@nrc.gov.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
SUPPLEMENTARY INFORMATION:
Submitting Comments and Accessing Information
Comments submitted in writing or in electronic form will be posted
on the NRC Web site and on the Federal rulemaking Web site, https://www.regulations.gov. Because your comments will not be edited to remove
any identifying or contact information, the NRC cautions you against
including any information in your submission that you do not want to be
publicly disclosed.
The NRC requests that any party soliciting or aggregating comments
received from other persons for submission to the NRC inform those
persons that the NRC will not edit their comments to remove any
identifying or contact information, and therefore, they should not
include any information in their comments that they do not want
publicly disclosed.
You can access publicly available documents related to this
document using the following methods:
NRC's Public Document Room (PDR): The public may examine
and have copied, for a fee, publicly available documents at the NRC's
PDR, O1-F21, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland 20852.
NRC's Agencywide Documents Access and Management System
(ADAMS): Publicly available documents created or received at the NRC
are available online in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. From this page, the public can gain entry into ADAMS,
which provides text and image files of the NRC's public documents. If
you do not have access to ADAMS or if there are problems in accessing
the documents located in ADAMS, contact the NRC's PDR reference staff
at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
The application dated March 30, 2011, is available electronically under
ADAMS Accession No. ML11110A031.
Federal Rulemaking Web Site: Public comments and
supporting materials related to this notice can be found at https://www.regulations.gov by searching on Docket ID NRC-2011-0200. The
application dated March 30, 2011, is available electronically under
ADAMS Accession No. ML11110A031.
FOR FURTHER INFORMATION CONTACT: Farideh E. Saba, Senior Project
Manager, Plant Licensing Branch 2-2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington, DC 20555. Telephone:
[[Page 53968]]
301-415-1447; fax number: 301-415-2102; e-mail: Farideh.Saba@nrc.gov.
The Commission is considering the issuance of an order under Title
10 of Code of Federal Regulations (10 CFR) 50.80 approving the indirect
transfer of the Renewed Facility Operating License No. NFP-63 for
Shearon Harris Nuclear Power Plant, Unit 1 (HNP), currently held by
Carolina Power & Light Company, as owner and licensed operator.
According to the application for approval dated March 30, 2011,
filed by Carolina Power & Light Company (CP&L, the licensee), Progress
Energy, Inc. (Progress Energy, the licensee's current ultimate parent
corporation) seeks approval pursuant to 10 CFR 50.80 for indirect
transfer of control of HNP, along with Brunswick Steam Electric Plant
(BSEP), Units 1 and 2, including BSEP Independent Spent Fuel Storage
Installation, H.B. Robinson Steam Electric Plant (Robinson), Unit 2,
Robinson Independent Spent Fuel Storage Installations, and Crystal
River Unit 3 Nuclear Generating Plant. Progress Energy would merge with
Duke Energy Corporation (Duke Energy). The merged company would become
the ultimate parent of the current licensee. CP&L will continue to own
and operate the licensed facility in accordance with the license.
According to the application, under the terms of the Merger
Agreement, Diamond Acquisition Corporation (Merger Sub), a wholly owned
direct subsidiary of Duke Energy, will merge with and into Progress
Energy. Progress Energy will become a wholly owned direct subsidiary of
Duke Energy and the former shareholders of Progress Energy will become
shareholders of Duke Energy. The current licensee will remain a wholly
owned subsidiary of Progress Energy and will continue to operate the
HNP facility.
According to the application, it is anticipated that Duke Energy
shareholders will own approximately 63 percent of the combined company
and Progress Energy shareholders will own approximately 37 percent of
the combined company on a fully diluted basis.
According to the application, when the transaction is completed,
Duke Energy will have an eighteen-member board of directors. All eleven
current directors of Duke Energy will continue as directors when the
transaction is complete, subject to their ability and willingness to
serve. Progress Energy, after consultation with Duke Energy, designated
seven of the current directors of Progress Energy to be added to the
board of directors of Duke Energy when the transaction is complete,
similarly subject to their ability and willingness to serve.
According to the application, the technical qualifications of the
licensees are not affected by the proposed indirect transfers of
control of the HNP license. The current licensee will at all times
remain the licensed operator of HNP. No conforming amendments will be
required to the facility operating license as a result of the proposed
transaction. The nuclear operating organization for the licensed
facility is expected to remain essentially unchanged as a result of the
acquisition. Specifically, the proposed indirect transfer of control
will not result in any change in the role of the CP&L as the licensed
operator of the licensed facility and will not result in any changes to
its financial qualifications, decommissioning funding assurance, or
technical qualifications. CP&L will retain the requisite qualifications
to own and operate the licensed facility.
No physical changes to the above listed facilities or operational
changes are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve an application for the indirect
transfer of a license, if the Commission determines that the proposed
merger will not affect the qualifications of the licensee to hold the
license, and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person(s) whose interest may be affected by the Commission's action on
the application may request a hearing and intervention via electronic
submission through the NRC E-Filing system. Requests for a hearing and
petitions for leave to intervene should be filed in accordance with the
Commission's rules of practice set forth in Subpart C ``Rules of
General Applicability: Hearing Requests, Petitions to Intervene,
Availability of Documents, Selection of Specific Hearing Procedures,
Presiding Officer Powers, and General Hearing Management for NRC
Adjudicatory Hearings,'' of 10 CFR part 2. In particular, such requests
and petitions must comply with the requirements set forth in 10 CFR
2.309. Untimely requests and petitions may be denied, as provided in 10
CFR 2.309(c)(1), unless good cause for failure to file on time is
established. In addition, an untimely request or petition should
address the factors that the Commission will also consider, in
reviewing untimely requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)-(viii). NRC regulations are accessible electronically
from the NRC Library on the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by e-mail at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) A digital ID certificate,
which allows the participant (or its counsel or representative) to
digitally sign documents and access the E-Submittal server for any
proceeding in which it is participating; and (2) advise the Secretary
that the participant will be submitting a request or petition for
hearing (even in instances in which the participant, or its counsel or
representative, already holds an NRC-issued digital ID certificate).
Based upon this information, the Secretary will establish an electronic
docket for the hearing in this proceeding if the Secretary has not
already established an electronic docket.
Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in NRC's ``Guidance for Electronic
Submission,'' which is available on the agency's
[[Page 53969]]
public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Participants may attempt to use other software not listed on the Web
site, but should note that the NRC's E-Filing system does not support
unlisted software, and the NRC Meta System Help Desk will not be able
to offer assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through Electronic Information Exchange, users will be
required to install a Web browser plug-in from the NRC Web site.
Further information on the Web-based submission form, including the
installation of the Web browser plug-in, is available on the NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
E-Filing system also distributes an e-mail notice that provides access
to the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-help/e-submittals.html, by e-mail at
MSHD.Resource@nrc.gov, or by a toll-free call at 866-672-7640. The NRC
Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/EHD/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 20
days from the date of publication of this notice. Non-timely filings
will not be entertained absent a determination by the presiding officer
that the petition or request should be granted or the contentions
should be admitted, based on a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
Within 30 days from the date of publication of this notice, persons
may submit written comments regarding the license transfer application,
as provided for in 10 CFR 2.1305. The Commission will consider and, if
appropriate, respond to these comments, but such comments will not
otherwise constitute part of the decisional record. Comments should be
submitted to the Secretary, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemakings and Adjudications
Staff, and should cite the publication date and page number of this
Federal Register notice.
For further details with respect to this license transfer
application, see the application dated March 30, 2011, available for
public inspection at the Commission's Public Document Room (PDR),
located at One White Flint North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
documents created or received at the NRC are accessible electronically
through ADAMS in the NRC Library at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter
problems in accessing the documents located in ADAMS should contact the
NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737
or by e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland this 22nd day of August 2011.
For the Nuclear Regulatory Commission.
Farideh E. Saba,
Senior Project Manager, Plant Licensing Branch 2-2, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.