TENNESSEE VALLEY AUTHORITY
Final Environmental Impact Statement,
Single Nuclear Unit at the Bellefonte
Plant Site, Jackson County, AL
Tennessee Valley Authority
(TVA).
ACTION: Issuance of Record of Decision.
AGENCY:
This notice is provided in
accordance with the Council on
Environmental Quality’s regulations (40
CFR 1500 to 1508) and TVA’s
procedures implementing the National
Environmental Policy Act (NEPA). On
August 18, 2011, the TVA Board of
Directors approved the recommendation
to complete and operate Bellefonte
Nuclear Plant Unit 1. A notice of
availability (NOA) of the Final
Supplemental Environmental Impact
Statement for a Single Nuclear Unit at
the Bellefonte Plant Site (hereafter
referred to as Bellefonte FSEIS) was
published in the Federal Register on
May 21, 2010. On August 20, 2010, the
TVA Board approved the expenditure of
$248 million for additional engineering,
design, and licensing activities, as well
as the procurement of long lead-time
components for the partially complete
Bellefonte Unit 1. The ROD
documenting this decision was
published on September 9, 2010 (75 FR
54961). Bellefonte Unit 1 is a 1,260megawatt (MW) Babcock and Wilcoxdesigned pressurized light water reactor.
This interim decision was made in order
to maintain Unit 1 as a viable alternative
to meet the projected need for base load
generation on the TVA system in 2018–
2020.
FOR FURTHER INFORMATION CONTACT:
Ruth Horton, Senior NEPA Specialist,
Environmental Permits and Compliance,
Tennessee Valley Authority, 400 West
Summit Hill Drive, WT 11D, Knoxville,
Tennessee 37902–1499; telephone: 865–
632–3719; e-mail: blnp@tva.gov or
Zackary Rad, Bellefonte Unit 1
Licensing Manager, Nuclear Generation
Development and Construction,
Tennessee Valley Authority, P.O. Box
2000, OSB 1A–BLN, Hollywood,
Alabama 35752; telephone: 256–574–
8265; e-mail: zwrad@tva.gov.
SUPPLEMENTARY INFORMATION: The
September 2010 Bellefonte ROD
provides information about this action,
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
20:31 Aug 29, 2011
Jkt 223001
and reference should be made to that
notice for more details, including
information about the need for base load
capacity, alternatives considered by
TVA, the history of the Bellefonte
project, environmental consequences,
and other background information.
With almost 37,000 MW of net
dependable summer generating
capacity, TVA operates the nation’s
largest public power system, producing
4 percent of all electricity in the nation.
TVA provides electricity to most of
Tennessee and parts of Virginia, North
Carolina, Georgia, Alabama, Mississippi,
and Kentucky. It serves about 9 million
people in this seven-state region
through 155 independent power
distributors and 56 directly served large
industries and Federal facilities. The
TVA Act requires the TVA power
system to be self-supporting and to be
operated on a non-profit basis and
directs TVA to sell power at rates as low
as are feasible. Most of TVA’s power is
supplied by three nuclear plants, 11
coal-fired plants, 12 gas-fired plants, 29
hydroelectric dams, and a pumpedstorage facility and through power
purchase agreements from a variety of
energy sources including, but not
limited to, wind, solar, natural and
methane gas, hydroelectric, and lignite
coal. TVA also purchases renewable
energy from small producers in its
Generation Partners Program. TVA
transmits electricity from these facilities
over almost 16,000 miles of
transmission lines.
The Bellefonte FSEIS supplements
and updates the original TVA Final
Environmental Statement for Bellefonte
Nuclear Plant Units 1 and 2 (May 1974);
the TVA Final Environmental Impact
Statement for the Bellefonte Conversion
Project (October 1997); the U.S.
Department of Energy’s Final
Environmental Impact Statement for the
Production of Tritium in a Commercial
Light Water Reactor (March 1999),
which TVA adopted; and the TVA
Bellefonte Nuclear Plant Units 3 and 4,
Combined License Application Part 3,
Environmental Report, Revision 1
(October 2008). Where pertinent, the
Bellefonte FSEIS incorporates by
reference, utilizes, tiers from, or updates
information from this substantial
environmental record.
The Bellefonte FSEIS also tiered from
and incorporated by reference two TVA
programmatic reviews, Energy Vision
2020 Integrated Resource Plan Final
Programmatic Environmental Impact
Statement (December 1995) and
Reservoir Operations Study Final
Programmatic Environmental Impact
Statement (May 2004). In March 2011,
TVA issued a new Integrated Resource
PO 00000
Frm 00120
Fmt 4703
Sfmt 4703
Plan (IRP) and IRP Final Environmental
Impact Statement (FEIS) for meeting
future demand on the TVA power
system over the next 20 years. The need
for power analysis in the Bellefonte
FSEIS is compatible with, and is
updated by, the analysis in the 2011 IRP
FEIS.
TVA’s 2011 IRP sets forth a planning
direction to guide TVA in making future
energy resource decisions. This
direction includes, among other actions,
significant increased investment in
energy efficiency and demand response
programs, the idling of existing coal
units in an amount ranging from 2,400
to 4,700 MWs, and the addition of 1,150
to 3,650 MWs of nuclear capacity.
Completion and operation of the 1,260–
MW Bellefonte Unit 1 was one of the
resource options analyzed in the 2011
IRP and is consistent with the planning
direction approved by the TVA Board.
Analyses show that even with
substantial energy replacement through
conservation measures, TVA must still
add new base load generation to balance
resources with the projected load
requirements. Neither coal-fired nor
natural gas-fired power was found to be
environmentally preferable to nuclear
power, and renewable energy sources
were not found sufficient to meet power
needs in the required time frame.
Completing Bellefonte Unit 1 also
would provide TVA more flexibility to
idle existing coal plants. These
conclusions are confirmed in TVA’s
new IRP.
The decision to complete Bellefonte
Unit 1 precludes further consideration
of any of the options for converting the
existing facilities at the Bellefonte site to
a coal- or natural gas-fired plant that
were analyzed in the 1997 FEIS for the
Bellefonte Conversion Project.
Public Involvement
TVA published a notice of intent to
prepare a supplemental environmental
impact statement (SEIS) in the Federal
Register on August 10, 2009. The NOA
for the draft SEIS (DSEIS) was published
in the Federal Register by the U.S.
Environmental Protection Agency
(USEPA) on November 13, 2009. TVA
accepted comments on the DSEIS until
December 28, 2009. Approximately 50
people attended a public meeting on
December 8, 2009, in Scottsboro,
Alabama. Comments both for and
against nuclear power generation were
received from 35 individuals and four
Federal and state agencies. After
considering and responding to all
substantive comments, TVA completed
and issued the Bellefonte FSEIS, which
identifies Alternative B, Completion and
Operation of Bellefonte Unit 1, as TVA’s
E:\FR\FM\30AUN1.SGM
30AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 168 / Tuesday, August 30, 2011 / Notices
Preferred Alternative. The NOA of the
Bellefonte FSEIS was published in the
Federal Register on May 21, 2010.
TVA also invited comments on the
Bellefonte FSEIS during a 30-day period
from May 21 through June 21, 2010.
Comments were received from 11
persons or entities, including the
USEPA. No new issues were raised, and
similar comments were addressed in the
FSEIS.
Two USEPA comments were
addressed in TVA’s September 9, 2010,
ROD. TVA reported that further
examination of U.S. Census data related
to neighboring block groups for minority
and impoverished populations
confirmed the environmental justice
finding in the Bellefonte FSEIS that
these groups are not expected to be
disproportionately affected by
completion and operation of a nuclear
plant at the Bellefonte site. In response
to USEPA comments about the
adequacy of housing supply for the
construction workforce, TVA committed
to undertake an in-depth housing study
prior to making a final decision about
plant construction. The purpose of the
study was to better identify the extent
and location of housing impacts and to
develop a strategy for addressing those
concerns.
An in-depth housing survey was
completed in October 2010. The survey
identified 16 communities and four
counties near the Bellefonte site that
were most likely to be considered for
relocation by the in-migrating
construction and operational workforce,
based on commute distances/times,
school district options, transportation
routes, and available permanent,
temporary, and planned housing. The
survey assumed that half of the
workforce would in-migrate, and half
would be existing residents within the
region. The study concluded that,
overall, demands on housing by the inmigrating construction and operational
workforce are anticipated to be met for
the first two years of the construction
schedule and met entirely for the
operational workforce. Based on
interviews with city and county
officials, local realtors, and area
developers, the study indicated that the
start of construction and the increase of
housing demand are expected to spur
both temporary and permanent housing
development. TVA will monitor the
availability of construction workforce
housing. If housing development does
not occur as expected, TVA will
consider mitigation measures such as
transportation assistance for commuting
employees living farther than 30 miles
away, remote parking areas with
shuttles to the Bellefonte site,
VerDate Mar<15>2010
20:31 Aug 29, 2011
Jkt 223001
development of a temporary RV park
and campground located on TVAowned property or a collaborative
development off site to alleviate
community pressures from
construction-related housing demand.
The 2010 Housing Survey report is
available upon request.
Environmental Consequences
The Bellefonte FSEIS updated the
analyses presented in earlier
environmental reviews of the natural,
human, and radiological environment
that could be affected by completion
and operation of a nuclear unit at the
Bellefonte site, including discussion of
nuclear plant safety, plant security, and
decommissioning. Environmental
consequences of completing and
operating Bellefonte Unit 1 and
associated transmission system
improvements, as well as alternatives to
them, are summarized in the September
2010 Bellefonte ROD.
During the course of the SEIS
preparation, TVA consulted with the
U.S. Fish and Wildlife Service (USFWS)
and the State Historic Preservation
Officers (SHPOs) in Alabama,
Tennessee, and Georgia, as well as
interested tribes. On January 21, 2010,
USFWS concluded that only the pink
mucket (Lampsilis abrupta) mussel
could be affected by the proposed
nuclear plant construction and
operation. In a biological opinion issued
April 15, 2010, USFWS issued an
incidental take permit for pink mucket
under either Action Alternative. TVA
committed to providing $30,000 to be
used for research and recovery of the
pink mucket should either of the Action
Alternatives be selected.
In a September 9, 2009, letter, the
Alabama SHPO concurred with TVA’s
finding of no effects on historic
properties associated with completion
and operation of a nuclear unit on the
Bellefonte site. TVA completed a
memorandum of agreement (MOA) with
the Georgia SHPO on April 28, 2010,
and with the Alabama SHPO on June 1,
2010, for the treatment of potential
impacts to historic properties from
transmission system improvements on
existing rights-of-way. Instead of
entering into an MOA, in a May 20,
2010, letter the Tennessee SHPO
requested TVA follow procedures to
conduct a phased identification and
evaluation of historic properties
pursuant to 36 CFR 900.4(b)(2).
Following the seismic and tsunamiinduced events at the Fukushima
(Japan) Daiichi Nuclear Plant on March
11, 2011, TVA performed a review to
determine whether that event presented
new information about the likelihood or
PO 00000
Frm 00121
Fmt 4703
Sfmt 4703
53995
consequences of severe accidents
associated with the Bellefonte Unit 1
design. The review indicated that the
likelihood or consequences of an event
similar to the one in Japan were already
adequately evaluated in the
probabilistic safety assessment and risk
calculations presented in the FSEIS.
Bellefonte Unit 1 is designed to
withstand all types of extreme weather,
flood, and seismic events. Design-basis
improvements to withstand terrorist
attacks addressed in recent years will
increase the plant’s ability to mitigate
severe accidents. Based upon TVA’s
post-Fukushima review, TVA concludes
that the severe accident analysis in the
FSEIS adequately bounds the potential
for environmental and public health
consequences.
In addition to the site-specific review
of the Bellefonte design, TVA has
developed a fleet-wide action plan
designed to strengthen its nuclear
facilities to withstand combinations of
large-scale disasters, both man-made
and natural. This plan tracks closely
with the July 12, 2011, NRC report
Recommendations for Enhancing
Reactor Safety in the 21st Century: The
Near-Term Task Force Review of
Insights from the Fukushima Dai-ichi
Accident. TVA’s Fukushima action plan
includes short-term, intermediate, and
long-term actions designed to address
lessons learned from the accident in
Japan. A primary focus is looking at
additional backups to existing
emergency power systems, diesel
generators, and battery banks to increase
the ability to weather an extended loss
of outside power at any of TVA’s
nuclear plants. This means the purchase
and staging of more diesel and gasolinefueled electric generators. Plans include
purchasing additional pumps and hoses
that can draw water from the Tennessee
River, providing another emergency
alternative to maintain water levels in
reactors and used fuel pools. The
benefits and feasibility of more rapid
transfer of spent fuel to dry cask storage
are being examined. Emergency plans
and control room simulators have been
revamped to include scenarios for
events that occur simultaneously, like
the earthquake and tsunami in Japan.
Implementing TVA’s Fukushima action
plan will further improve the safety of
TVA’s operating plants.
TVA will continue to meet all
regulatory requirements and nuclear
power industry recommendations that
result from the Fukushima event at its
six operating nuclear units, Watts Bar
Unit 2, which is currently under
construction, and at Bellefonte Unit 1.
As new information becomes available
and new insights are developed from
E:\FR\FM\30AUN1.SGM
30AUN1
53996
Federal Register / Vol. 76, No. 168 / Tuesday, August 30, 2011 / Notices
Decision
On August 20, 2010, the TVA Board
approved a budget allocation of $248
million in support of continued
engineering, design, and regulatorybasis development, as well as the
procurement of long-lead components
such as steam generators for Unit 1. This
helped to preserve Bellefonte Unit 1 as
a feasible energy resource option. After
considering the analyses done for TVA’s
2011 IRP, the IRP FEIS, the results of
engineering and financial studies
conducted since August 2010, and
analyses in response to the Fukushima
Daiichi accident, the TVA Board
approved the completion and operation
of Bellefonte Unit 1 on August 18, 2011.
The Board directed TVA staff to not
resume construction activities at
Bellefonte Unit 1 until fuel is initially
loaded at TVA Watts Bar Unit 2. Subject
to this condition, plant construction can
commence 120 days after TVA submits
a written notice to the Nuclear
Regulatory Commission (NRC)
containing certain information regarding
plant status, schedules, and other
descriptions as set forth in the NRC
Policy Statement on Deferred Plants (52
FR 38077 [October 14, 1987]).
Environmentally Preferred Alternative
As discussed in the September 2010
Bellefonte ROD, TVA has concluded
that the environmental impacts of the
two Action Alternatives would be very
similar and that neither Action
Alternative would be environmentally
preferable to the other. However, either
Action Alternative likely would be
environmentally preferable to the No
Action Alternative, assuming TVA
would build new base load generation
elsewhere.
temporary on-site RV park and
campground or a collaborative
development off site.
• In accordance with the permit
issued by USFWS on April 15, 2010,
provide $30,000 for research and
recovery of the pink mucket.
The following mitigation measures
would be implemented to respond to
the potential impacts of the proposed
transmission system improvements.
Prior to implementing any grounddisturbing work, TVA would:
• Survey areas to be disturbed where
endangered or threatened plant species
have been previously reported to verify
if the rare species are still present in the
transmission line right-of-way. The
locations of any listed species would be
identified on construction plans and
avoided during construction activities.
• Survey wetlands in the areas that
may be disturbed as a result of
upgrading/reenergizing activities.
Mitigation measures that avoid,
minimize, or compensate for impacts to
wetlands would be implemented to
ensure no significant impacts or loss of
wetland function occurs.
• In consultation with the SHPO (for
the state in which the property is
located) and other consulting parties,
develop and evaluate alternatives or
modifications that would avoid,
minimize, or mitigate any adverse
effects to historic properties, if any.
With the implementation of the above
measures, TVA has determined that
adverse environmental impacts of
completing and operating Bellefonte
Unit 1 would be substantially reduced.
Dated: August 24, 2011.
Ashok S. Bhatnagar,
Senior Vice President, Nuclear Generation
Development and Construction.
mstockstill on DSK4VPTVN1PROD with NOTICES
the Fukushima event, TVA will
consider what further steps might be
taken to ensure the safe operation of its
nuclear fleet.
Mitigation Measures
The following measures will be used
to minimize environmental impacts
from completion and operation of
Bellefonte Unit 1:
• Avoid disturbance of archaeological
site 1JA111.
• Take appropriate steps to monitor
and mitigate potential housing, traffic,
and school impacts in Jackson County,
Alabama, during plant construction and
mitigate such impacts if needed.
Mitigation could include measures such
as transportation assistance for
commuting employees living outside a
30-mile commuting distance, remote
parking areas with shuttles to the
Bellefonte site, development of a
VerDate Mar<15>2010
20:31 Aug 29, 2011
Jkt 223001
[FR Doc. 2011–22079 Filed 8–29–11; 8:45 am]
BILLING CODE 8120–08–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions
on Proposed Highway in California
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice of limitation on claims
for judicial review of actions by the
California Department of Transportation
(Caltrans), pursuant to 23 U.S.C. 327.
AGENCY:
The FHWA, on behalf of
Caltrans, is issuing this notice to
announce actions taken by Caltrans that
are final within the meaning of 23
U.S.C. 139(l)(1). The actions relate to a
proposed bridge widening and
SUMMARY:
PO 00000
Frm 00122
Fmt 4703
Sfmt 4703
rehabilitation project, the North Spring
Street Viaduct Widening and
Rehabilitation in the County of Los
Angeles, State of California. Those
actions grant licenses, permits, and
approvals for the project.
DATES: By this notice, the FHWA, on
behalf of Caltrans, is advising the public
of final agency actions subject to 23
U.S.C. 139(l)(1). A claim seeking
judicial review of the Federal agency
actions on the highway project will be
barred unless the claim is filed on or
before February 27, 2012. If the Federal
law that authorizes judicial review of a
claim provides a time period of less
than 180 days for filing such claim, then
that shorter time period still applies.
FOR FURTHER INFORMATION CONTACT:
Ollie Jackson, Senior Environmental
Planner, Caltrans, District 7, Division of
Environmental Planning, 100 South
Main Street, Suite 100, Los Angeles, CA
90012–3712, (213) 897–8610,
ollie_jackson@dot.ca.gov.
SUPPLEMENTARY INFORMATION: Effective
July 1, 2007, the Federal Highway
Administration (FHWA) assigned, and
the California Department of
Transportation (Caltrans) assumed,
environmental responsibilities for this
project pursuant to 23 U.S.C. 327.
Notice is hereby given that Caltrans
have taken final agency actions subject
to 23 U.S.C. 139(l)(1) by issuing
licenses, permits, and approvals for the
following highway project in the State
of California: The City of Los Angeles in
cooperation with Caltrans proposes
improvements and rehabilitation to the
existing North Spring Viaduct and its
adjoining roadways. The proposed
project area is situated northeast of
downtown Los Angeles in an area that
includes residential, commercial,
industrial, and open space land uses.
The proposed project area straddles
portions of the Central City North and
Northeast Los Angeles Community
Planning areas. Regional transportation
facilities in the area include interstate
110 (I–110), Interstate 5 (I–5), and State
Route 101 (SR–101). Completing the
project would correct existing
geometrical and design deficiencies, and
to address seismic vulnerability issues
in order to increase the viaduct’s SR to
a minimum of 80. An additional
purpose of the project is to improve
bicycle and pedestrian circulation and
safety across the river and railroad
tracks. The actions by the Federal
agencies, and the laws under which
such actions were taken, are described
in the Finding of No Significant Impact
(FONSI) for the project, approved on
June 30, 2011. The FONSI and other
project records are available by
E:\FR\FM\30AUN1.SGM
30AUN1
Agencies
[Federal Register Volume 76, Number 168 (Tuesday, August 30, 2011)]
[Notices]
[Pages 53994-53996]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-22079]
=======================================================================
-----------------------------------------------------------------------
TENNESSEE VALLEY AUTHORITY
Final Environmental Impact Statement, Single Nuclear Unit at the
Bellefonte Plant Site, Jackson County, AL
AGENCY: Tennessee Valley Authority (TVA).
ACTION: Issuance of Record of Decision.
-----------------------------------------------------------------------
SUMMARY: This notice is provided in accordance with the Council on
Environmental Quality's regulations (40 CFR 1500 to 1508) and TVA's
procedures implementing the National Environmental Policy Act (NEPA).
On August 18, 2011, the TVA Board of Directors approved the
recommendation to complete and operate Bellefonte Nuclear Plant Unit 1.
A notice of availability (NOA) of the Final Supplemental Environmental
Impact Statement for a Single Nuclear Unit at the Bellefonte Plant Site
(hereafter referred to as Bellefonte FSEIS) was published in the
Federal Register on May 21, 2010. On August 20, 2010, the TVA Board
approved the expenditure of $248 million for additional engineering,
design, and licensing activities, as well as the procurement of long
lead-time components for the partially complete Bellefonte Unit 1. The
ROD documenting this decision was published on September 9, 2010 (75 FR
54961). Bellefonte Unit 1 is a 1,260-megawatt (MW) Babcock and Wilcox-
designed pressurized light water reactor. This interim decision was
made in order to maintain Unit 1 as a viable alternative to meet the
projected need for base load generation on the TVA system in 2018-2020.
FOR FURTHER INFORMATION CONTACT: Ruth Horton, Senior NEPA Specialist,
Environmental Permits and Compliance, Tennessee Valley Authority, 400
West Summit Hill Drive, WT 11D, Knoxville, Tennessee 37902-1499;
telephone: 865-632-3719; e-mail: blnp@tva.gov or Zackary Rad,
Bellefonte Unit 1 Licensing Manager, Nuclear Generation Development and
Construction, Tennessee Valley Authority, P.O. Box 2000, OSB 1A-BLN,
Hollywood, Alabama 35752; telephone: 256-574-8265; e-mail:
zwrad@tva.gov.
SUPPLEMENTARY INFORMATION: The September 2010 Bellefonte ROD provides
information about this action, and reference should be made to that
notice for more details, including information about the need for base
load capacity, alternatives considered by TVA, the history of the
Bellefonte project, environmental consequences, and other background
information.
With almost 37,000 MW of net dependable summer generating capacity,
TVA operates the nation's largest public power system, producing 4
percent of all electricity in the nation. TVA provides electricity to
most of Tennessee and parts of Virginia, North Carolina, Georgia,
Alabama, Mississippi, and Kentucky. It serves about 9 million people in
this seven-state region through 155 independent power distributors and
56 directly served large industries and Federal facilities. The TVA Act
requires the TVA power system to be self-supporting and to be operated
on a non-profit basis and directs TVA to sell power at rates as low as
are feasible. Most of TVA's power is supplied by three nuclear plants,
11 coal-fired plants, 12 gas-fired plants, 29 hydroelectric dams, and a
pumped-storage facility and through power purchase agreements from a
variety of energy sources including, but not limited to, wind, solar,
natural and methane gas, hydroelectric, and lignite coal. TVA also
purchases renewable energy from small producers in its Generation
Partners Program. TVA transmits electricity from these facilities over
almost 16,000 miles of transmission lines.
The Bellefonte FSEIS supplements and updates the original TVA Final
Environmental Statement for Bellefonte Nuclear Plant Units 1 and 2 (May
1974); the TVA Final Environmental Impact Statement for the Bellefonte
Conversion Project (October 1997); the U.S. Department of Energy's
Final Environmental Impact Statement for the Production of Tritium in a
Commercial Light Water Reactor (March 1999), which TVA adopted; and the
TVA Bellefonte Nuclear Plant Units 3 and 4, Combined License
Application Part 3, Environmental Report, Revision 1 (October 2008).
Where pertinent, the Bellefonte FSEIS incorporates by reference,
utilizes, tiers from, or updates information from this substantial
environmental record.
The Bellefonte FSEIS also tiered from and incorporated by reference
two TVA programmatic reviews, Energy Vision 2020 Integrated Resource
Plan Final Programmatic Environmental Impact Statement (December 1995)
and Reservoir Operations Study Final Programmatic Environmental Impact
Statement (May 2004). In March 2011, TVA issued a new Integrated
Resource Plan (IRP) and IRP Final Environmental Impact Statement (FEIS)
for meeting future demand on the TVA power system over the next 20
years. The need for power analysis in the Bellefonte FSEIS is
compatible with, and is updated by, the analysis in the 2011 IRP FEIS.
TVA's 2011 IRP sets forth a planning direction to guide TVA in
making future energy resource decisions. This direction includes, among
other actions, significant increased investment in energy efficiency
and demand response programs, the idling of existing coal units in an
amount ranging from 2,400 to 4,700 MWs, and the addition of 1,150 to
3,650 MWs of nuclear capacity. Completion and operation of the 1,260-MW
Bellefonte Unit 1 was one of the resource options analyzed in the 2011
IRP and is consistent with the planning direction approved by the TVA
Board.
Analyses show that even with substantial energy replacement through
conservation measures, TVA must still add new base load generation to
balance resources with the projected load requirements. Neither coal-
fired nor natural gas-fired power was found to be environmentally
preferable to nuclear power, and renewable energy sources were not
found sufficient to meet power needs in the required time frame.
Completing Bellefonte Unit 1 also would provide TVA more flexibility to
idle existing coal plants. These conclusions are confirmed in TVA's new
IRP.
The decision to complete Bellefonte Unit 1 precludes further
consideration of any of the options for converting the existing
facilities at the Bellefonte site to a coal- or natural gas-fired plant
that were analyzed in the 1997 FEIS for the Bellefonte Conversion
Project.
Public Involvement
TVA published a notice of intent to prepare a supplemental
environmental impact statement (SEIS) in the Federal Register on August
10, 2009. The NOA for the draft SEIS (DSEIS) was published in the
Federal Register by the U.S. Environmental Protection Agency (USEPA) on
November 13, 2009. TVA accepted comments on the DSEIS until December
28, 2009. Approximately 50 people attended a public meeting on December
8, 2009, in Scottsboro, Alabama. Comments both for and against nuclear
power generation were received from 35 individuals and four Federal and
state agencies. After considering and responding to all substantive
comments, TVA completed and issued the Bellefonte FSEIS, which
identifies Alternative B, Completion and Operation of Bellefonte Unit
1, as TVA's
[[Page 53995]]
Preferred Alternative. The NOA of the Bellefonte FSEIS was published in
the Federal Register on May 21, 2010.
TVA also invited comments on the Bellefonte FSEIS during a 30-day
period from May 21 through June 21, 2010. Comments were received from
11 persons or entities, including the USEPA. No new issues were raised,
and similar comments were addressed in the FSEIS.
Two USEPA comments were addressed in TVA's September 9, 2010, ROD.
TVA reported that further examination of U.S. Census data related to
neighboring block groups for minority and impoverished populations
confirmed the environmental justice finding in the Bellefonte FSEIS
that these groups are not expected to be disproportionately affected by
completion and operation of a nuclear plant at the Bellefonte site. In
response to USEPA comments about the adequacy of housing supply for the
construction workforce, TVA committed to undertake an in-depth housing
study prior to making a final decision about plant construction. The
purpose of the study was to better identify the extent and location of
housing impacts and to develop a strategy for addressing those
concerns.
An in-depth housing survey was completed in October 2010. The
survey identified 16 communities and four counties near the Bellefonte
site that were most likely to be considered for relocation by the in-
migrating construction and operational workforce, based on commute
distances/times, school district options, transportation routes, and
available permanent, temporary, and planned housing. The survey assumed
that half of the workforce would in-migrate, and half would be existing
residents within the region. The study concluded that, overall, demands
on housing by the in-migrating construction and operational workforce
are anticipated to be met for the first two years of the construction
schedule and met entirely for the operational workforce. Based on
interviews with city and county officials, local realtors, and area
developers, the study indicated that the start of construction and the
increase of housing demand are expected to spur both temporary and
permanent housing development. TVA will monitor the availability of
construction workforce housing. If housing development does not occur
as expected, TVA will consider mitigation measures such as
transportation assistance for commuting employees living farther than
30 miles away, remote parking areas with shuttles to the Bellefonte
site, development of a temporary RV park and campground located on TVA-
owned property or a collaborative development off site to alleviate
community pressures from construction-related housing demand. The 2010
Housing Survey report is available upon request.
Environmental Consequences
The Bellefonte FSEIS updated the analyses presented in earlier
environmental reviews of the natural, human, and radiological
environment that could be affected by completion and operation of a
nuclear unit at the Bellefonte site, including discussion of nuclear
plant safety, plant security, and decommissioning. Environmental
consequences of completing and operating Bellefonte Unit 1 and
associated transmission system improvements, as well as alternatives to
them, are summarized in the September 2010 Bellefonte ROD.
During the course of the SEIS preparation, TVA consulted with the
U.S. Fish and Wildlife Service (USFWS) and the State Historic
Preservation Officers (SHPOs) in Alabama, Tennessee, and Georgia, as
well as interested tribes. On January 21, 2010, USFWS concluded that
only the pink mucket (Lampsilis abrupta) mussel could be affected by
the proposed nuclear plant construction and operation. In a biological
opinion issued April 15, 2010, USFWS issued an incidental take permit
for pink mucket under either Action Alternative. TVA committed to
providing $30,000 to be used for research and recovery of the pink
mucket should either of the Action Alternatives be selected.
In a September 9, 2009, letter, the Alabama SHPO concurred with
TVA's finding of no effects on historic properties associated with
completion and operation of a nuclear unit on the Bellefonte site. TVA
completed a memorandum of agreement (MOA) with the Georgia SHPO on
April 28, 2010, and with the Alabama SHPO on June 1, 2010, for the
treatment of potential impacts to historic properties from transmission
system improvements on existing rights-of-way. Instead of entering into
an MOA, in a May 20, 2010, letter the Tennessee SHPO requested TVA
follow procedures to conduct a phased identification and evaluation of
historic properties pursuant to 36 CFR 900.4(b)(2).
Following the seismic and tsunami-induced events at the Fukushima
(Japan) Daiichi Nuclear Plant on March 11, 2011, TVA performed a review
to determine whether that event presented new information about the
likelihood or consequences of severe accidents associated with the
Bellefonte Unit 1 design. The review indicated that the likelihood or
consequences of an event similar to the one in Japan were already
adequately evaluated in the probabilistic safety assessment and risk
calculations presented in the FSEIS. Bellefonte Unit 1 is designed to
withstand all types of extreme weather, flood, and seismic events.
Design-basis improvements to withstand terrorist attacks addressed in
recent years will increase the plant's ability to mitigate severe
accidents. Based upon TVA's post-Fukushima review, TVA concludes that
the severe accident analysis in the FSEIS adequately bounds the
potential for environmental and public health consequences.
In addition to the site-specific review of the Bellefonte design,
TVA has developed a fleet-wide action plan designed to strengthen its
nuclear facilities to withstand combinations of large-scale disasters,
both man-made and natural. This plan tracks closely with the July 12,
2011, NRC report Recommendations for Enhancing Reactor Safety in the
21st Century: The Near-Term Task Force Review of Insights from the
Fukushima Dai-ichi Accident. TVA's Fukushima action plan includes
short-term, intermediate, and long-term actions designed to address
lessons learned from the accident in Japan. A primary focus is looking
at additional backups to existing emergency power systems, diesel
generators, and battery banks to increase the ability to weather an
extended loss of outside power at any of TVA's nuclear plants. This
means the purchase and staging of more diesel and gasoline-fueled
electric generators. Plans include purchasing additional pumps and
hoses that can draw water from the Tennessee River, providing another
emergency alternative to maintain water levels in reactors and used
fuel pools. The benefits and feasibility of more rapid transfer of
spent fuel to dry cask storage are being examined. Emergency plans and
control room simulators have been revamped to include scenarios for
events that occur simultaneously, like the earthquake and tsunami in
Japan. Implementing TVA's Fukushima action plan will further improve
the safety of TVA's operating plants.
TVA will continue to meet all regulatory requirements and nuclear
power industry recommendations that result from the Fukushima event at
its six operating nuclear units, Watts Bar Unit 2, which is currently
under construction, and at Bellefonte Unit 1. As new information
becomes available and new insights are developed from
[[Page 53996]]
the Fukushima event, TVA will consider what further steps might be
taken to ensure the safe operation of its nuclear fleet.
Decision
On August 20, 2010, the TVA Board approved a budget allocation of
$248 million in support of continued engineering, design, and
regulatory-basis development, as well as the procurement of long-lead
components such as steam generators for Unit 1. This helped to preserve
Bellefonte Unit 1 as a feasible energy resource option. After
considering the analyses done for TVA's 2011 IRP, the IRP FEIS, the
results of engineering and financial studies conducted since August
2010, and analyses in response to the Fukushima Daiichi accident, the
TVA Board approved the completion and operation of Bellefonte Unit 1 on
August 18, 2011. The Board directed TVA staff to not resume
construction activities at Bellefonte Unit 1 until fuel is initially
loaded at TVA Watts Bar Unit 2. Subject to this condition, plant
construction can commence 120 days after TVA submits a written notice
to the Nuclear Regulatory Commission (NRC) containing certain
information regarding plant status, schedules, and other descriptions
as set forth in the NRC Policy Statement on Deferred Plants (52 FR
38077 [October 14, 1987]).
Environmentally Preferred Alternative
As discussed in the September 2010 Bellefonte ROD, TVA has
concluded that the environmental impacts of the two Action Alternatives
would be very similar and that neither Action Alternative would be
environmentally preferable to the other. However, either Action
Alternative likely would be environmentally preferable to the No Action
Alternative, assuming TVA would build new base load generation
elsewhere.
Mitigation Measures
The following measures will be used to minimize environmental
impacts from completion and operation of Bellefonte Unit 1:
Avoid disturbance of archaeological site 1JA111.
Take appropriate steps to monitor and mitigate potential
housing, traffic, and school impacts in Jackson County, Alabama, during
plant construction and mitigate such impacts if needed. Mitigation
could include measures such as transportation assistance for commuting
employees living outside a 30-mile commuting distance, remote parking
areas with shuttles to the Bellefonte site, development of a temporary
on-site RV park and campground or a collaborative development off site.
In accordance with the permit issued by USFWS on April 15,
2010, provide $30,000 for research and recovery of the pink mucket.
The following mitigation measures would be implemented to respond
to the potential impacts of the proposed transmission system
improvements. Prior to implementing any ground-disturbing work, TVA
would:
Survey areas to be disturbed where endangered or
threatened plant species have been previously reported to verify if the
rare species are still present in the transmission line right-of-way.
The locations of any listed species would be identified on construction
plans and avoided during construction activities.
Survey wetlands in the areas that may be disturbed as a
result of upgrading/reenergizing activities. Mitigation measures that
avoid, minimize, or compensate for impacts to wetlands would be
implemented to ensure no significant impacts or loss of wetland
function occurs.
In consultation with the SHPO (for the state in which the
property is located) and other consulting parties, develop and evaluate
alternatives or modifications that would avoid, minimize, or mitigate
any adverse effects to historic properties, if any.
With the implementation of the above measures, TVA has determined that
adverse environmental impacts of completing and operating Bellefonte
Unit 1 would be substantially reduced.
Dated: August 24, 2011.
Ashok S. Bhatnagar,
Senior Vice President, Nuclear Generation Development and Construction.
[FR Doc. 2011-22079 Filed 8-29-11; 8:45 am]