ENBALA Power Networks (USA), Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 53443 [2011-21917]

Download as PDF Federal Register / Vol. 76, No. 166 / Friday, August 26, 2011 / Notices dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11–4339–000] emcdonald on DSK2BSOYB1PROD with NOTICES ENBALA Power Networks (USA), Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of ENBALA Power Networks (USA), Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 12, 2011. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed VerDate Mar<15>2010 19:37 Aug 25, 2011 Jkt 223001 Dated: August 22, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–21917 Filed 8–25–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14103–000] Northland Power Mississippi River LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2011, Northland Power Mississippi River LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near the town of New Orleans, in Jefferson, and Orleans Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed NPI 016A hydrokinetic project would consist of the following: (1) Up to 75 TREK generating units installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 19,000 kilowatts; (3) shielded underwater cables would convey each matrix power to a substation; and (4) a transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 165 gigawatt-hours (GWh), which would be sold to a local utility. Applicant Contact: Tim Richardson, 30 St. Clair Avenue West, 17th Floor, Toronto, Ontario, Canada; phone (416) 820–9521. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 53443 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14103–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 18, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–21797 Filed 8–25–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14104–000] Northland Power Mississippi River LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2011, Northland Power Mississippi River LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near the town of New Orleans, in Jefferson, and Orleans Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform E:\FR\FM\26AUN1.SGM 26AUN1

Agencies

[Federal Register Volume 76, Number 166 (Friday, August 26, 2011)]
[Notices]
[Page 53443]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-21917]



[[Page 53443]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER11-4339-000]


ENBALA Power Networks (USA), Inc.; Supplemental Notice That 
Initial Market-Based Rate Filing Includes Request for Blanket Section 
204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
ENBALA Power Networks (USA), Inc.'s application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Anyone filing a motion to intervene or protest must serve a 
copy of that document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is September 12, 2011.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: August 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-21917 Filed 8-25-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.