Golden Triangle Storage, Inc.; Notice of Application, 52649-52650 [2011-21452]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 163 / Tuesday, August 23, 2011 / Notices
The applicant estimates the project
would have an average annual
generation of 32.49 gigawatt-hours.
n. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14069,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
o. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
p. All filings must (1) Bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
VerDate Mar<15>2010
16:33 Aug 22, 2011
Jkt 223001
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21450 Filed 8–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–531–000]
Golden Triangle Storage, Inc.; Notice
of Application
On August 5, 2011, Golden Triangle
Storage, Inc. (Golden Triangle) filed
with the Federal Energy Regulatory
Commission (Commission) an
application under section 7(c) of the
Natural Gas Act and the Rules and
Regulations of the Commission’s
Regulations for authority to construct
and operate two new salt dome storage
caverns at its existing storage site
located in Jefferson County, Texas.
Golden Triangle also seeks market based
rates for its proposed expansion
services, all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Questions concerning this application
may be directed to Kathryn L. McCoy,
Golden Triangle Storage, Inc., 1200
Smith Street, Suite 900, Houston, TX
77002, (832) 397–8642 or John F.
Harrington, Fulbright & Jaworski L.L.P.,
801 Pennsylvania Avenue, NW.,
Washington, DC 20004, (202) 662–4530.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
52649
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
E:\FR\FM\23AUN1.SGM
23AUN1
52650
Federal Register / Vol. 76, No. 163 / Tuesday, August 23, 2011 / Notices
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.fere.gov.
Persons unable to file electronically
should submit an original and seven
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. This filing is
accessible on-line at https://
www.ferc.gov.using the ‘‘eLibrary’’ link
and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email notification when a document is
added to a subscribed docket(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: September 6, 2011.
Dated: August 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21452 Filed 8–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–533–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
National Fuel Gas Supply Corporation;
Notice of Application
Take notice that on August 15, 2011,
National Fuel Gas Supply Corporation
(National Fuel), 6363 Main Street,
Williamsville, New York 14221, filed an
application in Docket No. CP11–533–
000 pursuant to section 7(c) of the
Natural Gas Act and Part 157 of the
Commission’s Regulations, to reclassify
an existing compression unit at the
Beech Hill compressor station in
Allegany County, New York, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
VerDate Mar<15>2010
16:33 Aug 22, 2011
Jkt 223001
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TYY, contact
(202) 502–8659.
National Fuel proposes to reclassify
Compressor Unit 3 at its Beech Hill
compressor station 1 from spare
horsepower to use on a regular basis.
National Fuel states that Compressor
Unit 3 is a 2,850-horsepower unit that
was originally installed to allow for
proper scheduling of maintenance and
for having spare capacity available in
the event of an interruption in service
by either of the two existing 2,750horsepower units at the station.
National Fuel also states that by using
Compressor Unit 3 on a regular basis
would allow it to spread the wear and
tear among the three units, and thereby
optimize operating conditions at the
compressor station. National Fuel
further states that there would be no
modification to the existing horsepower,
no additional horsepower would be
installed, nor would there be any cost to
reclassify Compressor Unit 3 in this
proposal.
Any questions regarding Natural
Fuel’s application should be directed to
David W. Reityz, Deputy General
Counsel, National Fuel Gas Supply
Corporation, 6363 Main Street,
Williamsville, New York 14221, at (716)
857–7949.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
1 See Penn-York Energy Corporation, 38 FERC ¶
61,135 (1987).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link.
Comment Date: September 7, 2011.
Dated: August 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21496 Filed 8–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission Combined Notice of
Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4281–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
Second Quarter 2011 Capital Budget
Report.
E:\FR\FM\23AUN1.SGM
23AUN1
Agencies
[Federal Register Volume 76, Number 163 (Tuesday, August 23, 2011)]
[Notices]
[Pages 52649-52650]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-21452]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-531-000]
Golden Triangle Storage, Inc.; Notice of Application
On August 5, 2011, Golden Triangle Storage, Inc. (Golden Triangle)
filed with the Federal Energy Regulatory Commission (Commission) an
application under section 7(c) of the Natural Gas Act and the Rules and
Regulations of the Commission's Regulations for authority to construct
and operate two new salt dome storage caverns at its existing storage
site located in Jefferson County, Texas. Golden Triangle also seeks
market based rates for its proposed expansion services, all as more
fully set forth in the application, which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Questions concerning this application may be directed to Kathryn L.
McCoy, Golden Triangle Storage, Inc., 1200 Smith Street, Suite 900,
Houston, TX 77002, (832) 397-8642 or John F. Harrington, Fulbright &
Jaworski L.L.P., 801 Pennsylvania Avenue, NW., Washington, DC 20004,
(202) 662-4530.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all Federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
[[Page 52650]]
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.fere.gov. Persons unable to file electronically should submit an
original and seven copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. This filing is accessible on-line at https://www.ferc.gov.using
the ``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: September 6, 2011.
Dated: August 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-21452 Filed 8-22-11; 8:45 am]
BILLING CODE 6717-01-P