Konohiki Hydro Power, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 52648-52649 [2011-21450]
Download as PDF
52648
Federal Register / Vol. 76, No. 163 / Tuesday, August 23, 2011 / Notices
Burden Statement: Public reporting
burden for this collection is estimated
as:
Number of
responses per
respondent
(2)
Average
burden
hours per
response
(3)
Total annual
burden hours
(1) × (2) × (3)
FERC–583 .......................................................................................................
mstockstill on DSK4VPTVN1PROD with NOTICES
Data collection
Number of
respondents
annually
(1)
459
1
2
918
Estimated cost burden to respondents
is $62,835 (918 hours/2080 hours per
year times $142,372 per year average per
employee = $62,835). The cost per
respondent is $137 (rounded).
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
disclose, or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing, and
utilizing technology and systems for the
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) adjusting the existing ways to
comply with any previously applicable
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
than any one particular function or
activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimates of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collection of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
VerDate Mar<15>2010
16:33 Aug 22, 2011
Jkt 223001
other forms of information technology,
e.g., permitting electronic submission of
responses.
Dated: August 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21498 Filed 8–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14069–000]
Konohiki Hydro Power, Inc.; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: 14069–000.
c. Date filed: May 9, 2011, and
supplemented August 4, 2011.
d. Applicant: Konohiki Hydro Power,
Inc.
e. Name of Project: Puu Lua
Hydropower Project.
f. Location: The proposed Puu Lua
Hydropower Project would be located
on the Koke’e ditch irrigation system in
Kaua’i County, Hawaii. The land on
which all the project structures are
located is owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mrs. Pamela
Miller, Konohiki Hydro Power, Inc.,
P.O. Box 261, Anahola, HI 96703, phone
(808) 634–8866.
i. FERC Contact: Robert Bell, (202)
502–6062, robert.bell@ferc.gov.
j. Competing Application: This
application competes with Project No.
13875–000 filed October 22, 2010.
k. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
l. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the https://www.ferc.gov/docsfiling/efiling.asp. The Commission
strongly encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
m. Description of Project: The Puu
Lua Hydropower Project has two
developments that would consist of:
Upper Puu Lua Development
(1) A proposed powerhouse
containing one proposed generating unit
with an installed capacity of 2
megawatts; and (2) appurtenant
facilities.
Lower Puu Lua Development
(1) A proposed powerhouse
containing one proposed generating unit
with an installed capacity of 3.3
megawatts; and (2) appurtenant
facilities.
E:\FR\FM\23AUN1.SGM
23AUN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 163 / Tuesday, August 23, 2011 / Notices
The applicant estimates the project
would have an average annual
generation of 32.49 gigawatt-hours.
n. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street, NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov/docsfiling/elibrary.asp using the ‘‘eLibrary’’
link. Enter the docket number, P–14069,
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
o. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
p. All filings must (1) Bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
VerDate Mar<15>2010
16:33 Aug 22, 2011
Jkt 223001
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21450 Filed 8–22–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–531–000]
Golden Triangle Storage, Inc.; Notice
of Application
On August 5, 2011, Golden Triangle
Storage, Inc. (Golden Triangle) filed
with the Federal Energy Regulatory
Commission (Commission) an
application under section 7(c) of the
Natural Gas Act and the Rules and
Regulations of the Commission’s
Regulations for authority to construct
and operate two new salt dome storage
caverns at its existing storage site
located in Jefferson County, Texas.
Golden Triangle also seeks market based
rates for its proposed expansion
services, all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Questions concerning this application
may be directed to Kathryn L. McCoy,
Golden Triangle Storage, Inc., 1200
Smith Street, Suite 900, Houston, TX
77002, (832) 397–8642 or John F.
Harrington, Fulbright & Jaworski L.L.P.,
801 Pennsylvania Avenue, NW.,
Washington, DC 20004, (202) 662–4530.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
52649
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
E:\FR\FM\23AUN1.SGM
23AUN1
Agencies
[Federal Register Volume 76, Number 163 (Tuesday, August 23, 2011)]
[Notices]
[Pages 52648-52649]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-21450]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14069-000]
Konohiki Hydro Power, Inc.; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, Protests,
Recommendations, and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: 14069-000.
c. Date filed: May 9, 2011, and supplemented August 4, 2011.
d. Applicant: Konohiki Hydro Power, Inc.
e. Name of Project: Puu Lua Hydropower Project.
f. Location: The proposed Puu Lua Hydropower Project would be
located on the Koke'e ditch irrigation system in Kaua'i County, Hawaii.
The land on which all the project structures are located is owned by
the applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mrs. Pamela Miller, Konohiki Hydro Power,
Inc., P.O. Box 261, Anahola, HI 96703, phone (808) 634-8866.
i. FERC Contact: Robert Bell, (202) 502-6062, robert.bell@ferc.gov.
j. Competing Application: This application competes with Project
No. 13875-000 filed October 22, 2010.
k. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
l. Deadline for filing responsive documents: Due to the small size
of the proposed project, as well as the resource agency consultation
letters filed with the application, the 60-day timeframe specified in
18 CFR 4.34(b) for filing all comments, motions to intervene, protests,
recommendations, terms and conditions, and prescriptions is shortened
to 30 days from the issuance date of this notice. All reply comments
filed in response to comments submitted by any resource agency, Indian
tribe, or person, must be filed with the Commission within 45 days from
the issuance date of this notice.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the https://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly
encourages electronic filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
m. Description of Project: The Puu Lua Hydropower Project has two
developments that would consist of:
Upper Puu Lua Development
(1) A proposed powerhouse containing one proposed generating unit
with an installed capacity of 2 megawatts; and (2) appurtenant
facilities.
Lower Puu Lua Development
(1) A proposed powerhouse containing one proposed generating unit
with an installed capacity of 3.3 megawatts; and (2) appurtenant
facilities.
[[Page 52649]]
The applicant estimates the project would have an average annual
generation of 32.49 gigawatt-hours.
n. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street,
NE., Washington, DC 20426. The filing may also be viewed on the web at
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary''
link. Enter the docket number, P-14069, in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy
is also available for review and reproduction at the address in item h
above.
o. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
p. All filings must (1) Bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS'', ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading, the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. Any of
these documents must be filed by providing the original and seven
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Office of Energy Projects, Federal Energy Regulatory Commission, at the
above address. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: August 16, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-21450 Filed 8-22-11; 8:45 am]