Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership; Notice of Application for Partial Transfer of License, and Soliciting Comments and Motions To Intervene, 51961 [2011-21160]
Download as PDF
Federal Register / Vol. 76, No. 161 / Friday, August 19, 2011 / Notices
Regulations (CFR) under 18 CFR 4.31–
4.33, 4.81–4.83.
Action: The Commission is requesting
a three-year extension of the current
expiration date, with no changes to the
existing collection of data.
51961
Burden Statement: Public reporting
burden for this collection is estimated
as:
Number of
responses
per
respondent
Average
burden hours
per response
Total annual
burden hours
(1)
(2)
(3)
(1)×(2)×(3)
200 ...........................................................................................................................................
jlentini on DSK4TPTVN1PROD with NOTICES
Number of respondents annually
1
37
7,400
Estimated cost burden to respondents
is $508,000; [i.e., (7 hours @$200 an
hour (legal) × 200 respondents) + (30
hours @$38 an hour (technical) × 200
respondents)] per year equals
$508,000)]. The average annual cost
burden per respondent is $2,540
($508,000/200 = $2,540).
The reporting burden includes the
total time, effort, or financial resources
expended to generate, maintain, retain,
or disclose or provide the information
including: (1) Reviewing instructions;
(2) developing, acquiring, installing, and
utilizing technology and systems for the
purposes of collecting, validating,
verifying, processing, maintaining,
disclosing and providing information;
(3) adjusting the existing ways to
comply with any previously applicable
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
than anyone particular function or
activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collection of information
VerDate Mar<15>2010
18:32 Aug 18, 2011
Jkt 223001
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses.
Dated: August 15, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21207 Filed 8–18–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4784–082]
Brown Bear Power, LLC, Topsham
Hydroelectric Generating Facility Trust
No. 1, Topsham Hydro Partners
Limited Partnership; Notice of
Application for Partial Transfer of
License, and Soliciting Comments and
Motions To Intervene
On August 3, 2011, Brown Bear
Power, LLC, Topsham Hydroelectric
Generating Facility (Trust No. 1), and
Topsham Hydro Partners Limited
Partnership (THP), co-licensees of the
Pejepscot Project No. 4784, filed an
application for the partial transfer of
license for the Pejepscot Project, located
on the Androscoggin River in
Sagadahoc, Cumberland, and
Androscoggin Counties, Maine.
Applicants seek Commission approval
for a partial transfer of the license for
the Pejescot Project from Brown Bear,
Trust No. 1, and THP, jointly, to THP,
solely. As proposed, following the
transfer THP will be the sole licensee of
the Pejepscot Project.
Applicants’ Contacts: Nicole Poole,
Topsham Hydroelectric Generating
Facilities Trust No. 1, 300 Delaware
Avenue, 9th floor, Wilmington, DE
19801, (302) 576–3704; Christine M.
Miller, Brown Bear Power LLC, 200
Clarendon Street 55th Floor, Boston MA
02116, (617) 531–6338; Christine M.
PO 00000
Frm 00030
Fmt 4703
Sfmt 9990
Miller, Topsham Hydro Partners
Limited Partnership, 200 Clarendon
Street 55th Floor, Boston MA 02116.
FERC Contact: Krista Sakallaris (202)
502–6302, krista.sakallaris@ferc.gov.
Deadline for filing comments and
motions to intervene: 15 days from the
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a) (1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–4784) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Dated: August 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–21160 Filed 8–18–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 76, Number 161 (Friday, August 19, 2011)]
[Notices]
[Page 51961]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-21160]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4784-082]
Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility
Trust No. 1, Topsham Hydro Partners Limited Partnership; Notice of
Application for Partial Transfer of License, and Soliciting Comments
and Motions To Intervene
On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric
Generating Facility (Trust No. 1), and Topsham Hydro Partners Limited
Partnership (THP), co-licensees of the Pejepscot Project No. 4784,
filed an application for the partial transfer of license for the
Pejepscot Project, located on the Androscoggin River in Sagadahoc,
Cumberland, and Androscoggin Counties, Maine.
Applicants seek Commission approval for a partial transfer of the
license for the Pejescot Project from Brown Bear, Trust No. 1, and THP,
jointly, to THP, solely. As proposed, following the transfer THP will
be the sole licensee of the Pejepscot Project.
Applicants' Contacts: Nicole Poole, Topsham Hydroelectric
Generating Facilities Trust No. 1, 300 Delaware Avenue, 9th floor,
Wilmington, DE 19801, (302) 576-3704; Christine M. Miller, Brown Bear
Power LLC, 200 Clarendon Street 55th Floor, Boston MA 02116, (617) 531-
6338; Christine M. Miller, Topsham Hydro Partners Limited Partnership,
200 Clarendon Street 55th Floor, Boston MA 02116.
FERC Contact: Krista Sakallaris (202) 502-6302,
krista.sakallaris@ferc.gov.
Deadline for filing comments and motions to intervene: 15 days from
the issuance date of this notice. Comments and motions to intervene may
be filed electronically via the Internet. See 18 CFR 385.2001(a) (1)
and the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. If unable to be filed electronically, documents may be paper-
filed. To paper-file, an original plus seven copies should be mailed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. More information about
this project can be viewed or printed on the eLibrary link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-4784) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Dated: August 12, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-21160 Filed 8-18-11; 8:45 am]