Percheron Power, LLC, FFP Project 85, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 51021-51022 [2011-20889]
Download as PDF
Emcdonald on DSK2BSOYB1PROD with NOTICES
Federal Register / Vol. 76, No. 159 / Wednesday, August 17, 2011 / Notices
Filed Date: 08/08/2011.
Accession Number: 20110808–5020.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4252–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Filing of Notice of Succession to be
effective 10/8/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5024.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4253–000.
Applicants: Wolverine Power Supply
Cooperative, Inc.
Description: Wolverine Power Supply
Cooperative, Inc. submits tariff filing per
35.13(a)(2)(iii: Certificates of
Concurrence for Pere Marquette,
Sternberg & Vestaburg IFAs to be
effective 4/21/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5030.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4254–000.
Applicants: New England Power
Company.
Description: New England Power
Company submits tariff filing per
35.13(a)(2)(iii: Interconnection
Agreement with Lowell Cogeneration to
be effective 10/1/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5093.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4255–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: LGIA North Sky River
Wind Project—North Sky River Energy
LLC to be effective 8/9/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5126.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4256–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits tariff filing
per 35.13(a)(2)(iii: LGIA Amendment to
Walnut Creek Energy Park Project to be
effective 8/9/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5144.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4257–000.
VerDate Mar<15>2010
18:13 Aug 16, 2011
Jkt 223001
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc. submits tariff
filing per 35.13(a)(2)(iii: NYISO Tariff
Revisions re: Bidding, Scheduling,
Settlement of Ancillary Services to be
effective 10/7/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5146.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4258–000.
Applicants: Desert View Power, Inc.
Description:Desert View Power, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Notice of Succession to be effective 10/
7/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5163.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4259–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Notice of Succession to Interconnection
Agreement to be effective 10/8/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5190.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4260–000.
Applicants: Elk Hills Power, LLC.
Description: Elk Hills Power, LLC
submits tariff filing per 35.13(a)(2)(iii:
Notice of Category 1 Seller Status and
Revised Market-Based Rate Tariff to be
effective 8/9/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5191.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4261–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Notice of Succession for Interconnection
Agreement to be effective 10/8/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5192.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
Docket Numbers: ER11–4262–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc.
submits tariff filing per 35.1: Residential
Purchase and Sale Agreement to be
effective 10/1/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5193.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
51021
Docket Numbers: ER11–4263–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Filing of Notice of Succession to be
effective 10/8/2011.
Filed Date: 08/08/2011.
Accession Number: 20110808–5194.
Comment Date: 5 p.m. Eastern Time
on Monday, August 29, 2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20890 Filed 8–16–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14204–000, 14231–000]
Percheron Power, LLC, FFP Project 85,
LLC; Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On May 31, 2011, Percheron Power,
LLC (Percheron Power), filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Scooteney Reservoir
Inlet Water Power Project, to be located
on the Potholes East Canal, which is an
inlet structure to the Scooteney
Reservoir, near Othello, Franklin
County, Washington. Another permit
application for the Scooteney Water
Power Project, located at the same site,
E:\FR\FM\17AUN1.SGM
17AUN1
Emcdonald on DSK2BSOYB1PROD with NOTICES
51022
Federal Register / Vol. 76, No. 159 / Wednesday, August 17, 2011 / Notices
was filed by FFP Project 85, LLC (FFP),
on July 18, 2011. Both of the proposed
projects would utilize the existing
Potholes East Canal, which is owned by
the U.S. Bureau of Reclamation. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Percheron Power
project would consist of the following:
(1) An approximately 500-foot-long
intake structure installed on the
Potholes East Canal to divert flow from
the canal to the turbines, which would
be 120 feet wide at the intersection with
the canal and would narrow to 60 feet
wide before entering the powerhouse,
and would include a 120-foot-wide, 15foot-high intake grate and a 60-footwide, 15-foot-high trash rack; (2) a
approximately 80-foot-long, 30-footwide powerhouse containing four lowhead turbine/generator units rated for
approximately 350 kilowatts each (total
capacity of 1,420 kilowatts) at an
average head of 14 feet; (3) a 600-footlong, 11-foot-high bypass weir,
constructed in parallel to the west bank
of the existing Potholes East Canal, to
function as a project spillway; (4) a
discharge canal returning flows from the
powerhouse to the Potholes East Canal;
(5) a 20-foot-long, 40-foot-wide
substation at the powerhouse which
will connect with the existing
distribution line at the project site; and
(6) appurtenant facilities. The estimated
annual generation of the project would
be 4.23 gigawatt-hours (GWh).
The proposed FFP project would
consist of the following: (1) An
approximately 40-foot-wide, 100-footlong approach channel installed on the
Potholes East Canal to divert flow from
the canal to the turbines; (2) a
approximately 125-foot-long, 40-footwide powerhouse containing one
Kaplan turbine/generator unit rated at
2,500-kW at a hydraulic head of 13 feet;
(3) a 120-foot-long, 50-foot-wide
discharge canal returning flows from the
powerhouse to the Potholes East Canal;
(4) a 40-foot-long, 50-foot-wide
substation at the powerhouse which
will connect with the existing
distribution line at the project site; and
(5) appurtenant facilities. The estimated
annual generation of the project would
be 15 GWh.
Applicant Contact (Percheron Power):
Mr. Jerry Straalsund, President,
Percheron Power, LLC, 6855 W.
Clearwater Ave., A101–260, Kennewick,
VerDate Mar<15>2010
18:13 Aug 16, 2011
Jkt 223001
WA 99336; e-mail:
jls@percheronpower.com.
Applicant Contact (FFP): Ms. Ramya
Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114; phone: (978)
283–2822.
FERC Contact: Jennifer Harper, (202)
502–6136.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about these
projects, including copies of the
applications, can be viewed or printed
on the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
numbers (P–14204–000 and P–14231–
000) in the docket number field to
access the documents. For assistance,
contact FERC Online Support.
Dated: August 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20889 Filed 8–16–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. P–13563–001]
Juneau Hydropower, Inc.; Notice of
Scoping Meeting and Site Visit and
Soliciting Scoping Comments for an
Applicant Prepared Environmental
Assessment Using the Alternative
Licensing Process
a. Type of Application: Alternative
Licensing Process.
b. Project No.: 13563–001.
c. Applicant: Juneau Hydropower,
Inc.
d. Name of Project: Sweetheart Lake
Hydroelectric Project.
e. Location: On Sweetheart Lake,
approximately 30 air miles southeast of
the city of Juneau, Alaska. The project
would occupy lands of the Tongass
National Forest.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Duff Mitchell,
Business Manager, Juneau Hydropower,
Inc., P.O. Box 22775, Juneau, AK 99802;
907–789–2775, e-mail:
duff.mitchell@juneauhydro.com.
h. FERC Contact: Jennifer Harper, at
(202) 502–6136.
i. Deadline for filing scoping
comments: October 7, 2011.
All documents (original and seven
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure require all
interveners filing documents with the
Commission to serve a copy of that
document on each person on the official
service list for the project. Further, if an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘e-filing’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’
j. The proposed project would consist
of: (1) The existing Lower Sweetheart
Lake, raised from a surface water
elevation of 544 feet and a surface area
E:\FR\FM\17AUN1.SGM
17AUN1
Agencies
[Federal Register Volume 76, Number 159 (Wednesday, August 17, 2011)]
[Notices]
[Pages 51021-51022]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20889]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14204-000, 14231-000]
Percheron Power, LLC, FFP Project 85, LLC; Notice of Competing
Preliminary Permit Applications Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Competing Applications
On May 31, 2011, Percheron Power, LLC (Percheron Power), filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Scooteney Reservoir Inlet Water Power Project, to be located on the
Potholes East Canal, which is an inlet structure to the Scooteney
Reservoir, near Othello, Franklin County, Washington. Another permit
application for the Scooteney Water Power Project, located at the same
site,
[[Page 51022]]
was filed by FFP Project 85, LLC (FFP), on July 18, 2011. Both of the
proposed projects would utilize the existing Potholes East Canal, which
is owned by the U.S. Bureau of Reclamation. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed Percheron Power project would consist of the
following: (1) An approximately 500-foot-long intake structure
installed on the Potholes East Canal to divert flow from the canal to
the turbines, which would be 120 feet wide at the intersection with the
canal and would narrow to 60 feet wide before entering the powerhouse,
and would include a 120-foot-wide, 15-foot-high intake grate and a 60-
foot-wide, 15-foot-high trash rack; (2) a approximately 80-foot-long,
30-foot-wide powerhouse containing four low-head turbine/generator
units rated for approximately 350 kilowatts each (total capacity of
1,420 kilowatts) at an average head of 14 feet; (3) a 600-foot-long,
11-foot-high bypass weir, constructed in parallel to the west bank of
the existing Potholes East Canal, to function as a project spillway;
(4) a discharge canal returning flows from the powerhouse to the
Potholes East Canal; (5) a 20-foot-long, 40-foot-wide substation at the
powerhouse which will connect with the existing distribution line at
the project site; and (6) appurtenant facilities. The estimated annual
generation of the project would be 4.23 gigawatt-hours (GWh).
The proposed FFP project would consist of the following: (1) An
approximately 40-foot-wide, 100-foot-long approach channel installed on
the Potholes East Canal to divert flow from the canal to the turbines;
(2) a approximately 125-foot-long, 40-foot-wide powerhouse containing
one Kaplan turbine/generator unit rated at 2,500-kW at a hydraulic head
of 13 feet; (3) a 120-foot-long, 50-foot-wide discharge canal returning
flows from the powerhouse to the Potholes East Canal; (4) a 40-foot-
long, 50-foot-wide substation at the powerhouse which will connect with
the existing distribution line at the project site; and (5) appurtenant
facilities. The estimated annual generation of the project would be 15
GWh.
Applicant Contact (Percheron Power): Mr. Jerry Straalsund,
President, Percheron Power, LLC, 6855 W. Clearwater Ave., A101-260,
Kennewick, WA 99336; e-mail: jls@percheronpower.com.
Applicant Contact (FFP): Ms. Ramya Swaminathan, Free Flow Power
Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; phone:
(978) 283-2822.
FERC Contact: Jennifer Harper, (202) 502-6136.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about these projects, including copies of the
applications, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket numbers (P-14204-000 and P-14231-000) in the docket
number field to access the documents. For assistance, contact FERC
Online Support.
Dated: August 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20889 Filed 8-16-11; 8:45 am]
BILLING CODE 6717-01-P