Integrated System Power Rates: Correction, 50726 [2011-20934]
Download as PDF
50726
Federal Register / Vol. 76, No. 158 / Tuesday, August 16, 2011 / Notices
Dated: August 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20753 Filed 8–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14170–000]
emcdonald on DSK2BSOYB1PROD with NOTICES
Riverbank Hydro No. 14, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 2, 2011, Riverbank Hydro No.
14, LLC (Riverbank Hydro), filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Tuttle Creek
Hydroelectric Project (Tuttle Creek
Project or project) to be located at the
U.S. Army Corps of Engineers’ (Corps)
Tuttle Creek Dam, on Big Blue River,
near Manhattan, Riley County, Kansas.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A 350-foot-long, 16foot-diameter penstock bifurcating from
the existing outlet structure; (2) a 100foot-long, 50-foot-wide concrete
powerhouse containing one turbine
with a generator rating of 7.9 megawatts;
(3) a tailrace structure directing flows
from the powerhouse back into the river
channel downstream of the existing
dam; (4) a 2.8-mile-long, 25-kilovolt
transmission line connecting the project
to an existing transmission line; and (5)
appurtenant facilities. The estimated
annual generation of the Tuttle Creek
Project would be 30.5 gigawatt-hours.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Toronto, Ontario, Canada M5J2J4;
phone: (416) 861–0092, extension 154.
FERC Contact: Sergiu Serban; phone:
(202) 502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
VerDate Mar<15>2010
18:07 Aug 15, 2011
Jkt 223001
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14170–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: August 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20754 Filed 8–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southwestern Power Administration
Integrated System Power Rates:
Correction
Southwestern Power
Administration, DOE.
ACTION: Notice of public review and
comment; Correction.
AGENCY:
Southwestern Power
Administration published a document
in the Federal Register (76 FR 48159) on
August 8, 2011, announcing the public
review and comment period on
proposed rates. Inadvertently, the date
listed for the combined Public
Information and Comment Forum
(Forum) was erroneously listed in the
DATES section as of August 16, 2011.
The correct date and time for the Forum,
if requested, will be August 30, 2011, at
9 a.m.
SUMMARY:
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Mr.
James K. McDonald, Assistant
Administrator, Office of Corporate
Operations, Southwestern Power
Administration, U.S. Department of
Energy, One West Third Street, Tulsa,
Oklahoma 74103, (918) 595–6690,
jim.mcdonald@swpa.gov.
FOR FURTHER INFORMATION CONTACT:
Dated: August 10, 2011.
Jon Worthington,
Administrator.
[FR Doc. 2011–20934 Filed 8–12–11; 4:15 pm]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2004–0013; FRL–9452–1]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; EPA Strategic Plan
Information on Source Water
Protection
Environmental Protection
Agency.
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that EPA is planning to
submit a request to renew an existing
approved Information Collection
Request (ICR) to the Office of
Management and Budget (OMB). This
ICR is scheduled to expire on December
31, 2011. Before submitting the ICR to
OMB for review and approval, EPA is
soliciting comments on specific aspects
of the proposed information collection
as described in the SUPPLEMENTARY
INFORMATION section.
DATES: Comments must be submitted on
or before October 17, 2011.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OW–2004–0013 by one of the following
methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• E–mail: OW–Docket@epa.gov.
• Mail: Water Docket, Environmental
Protection Agency, EPA Docket Center
(EPA/DC), Mailcode: 4101T, 1200
Pennsylvania Ave., NW., Washington,
DC 20460.
• Hand Delivery: The EPA Docket
Center at the Public Reading Room,
Room B3334, EPA West Building, 1301
Constitution Avenue, NW., Washington,
DC. Such deliveries are only accepted
during the Docket’s normal hours of
operation, and special arrangements
should be made for deliveries of boxed
information.
SUMMARY:
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 76, Number 158 (Tuesday, August 16, 2011)]
[Notices]
[Page 50726]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20934]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Southwestern Power Administration
Integrated System Power Rates: Correction
AGENCY: Southwestern Power Administration, DOE.
ACTION: Notice of public review and comment; Correction.
-----------------------------------------------------------------------
SUMMARY: Southwestern Power Administration published a document in the
Federal Register (76 FR 48159) on August 8, 2011, announcing the public
review and comment period on proposed rates. Inadvertently, the date
listed for the combined Public Information and Comment Forum (Forum)
was erroneously listed in the DATES section as of August 16, 2011. The
correct date and time for the Forum, if requested, will be August 30,
2011, at 9 a.m.
FOR FURTHER INFORMATION CONTACT: Mr. James K. McDonald, Assistant
Administrator, Office of Corporate Operations, Southwestern Power
Administration, U.S. Department of Energy, One West Third Street,
Tulsa, Oklahoma 74103, (918) 595-6690, jim.mcdonald@swpa.gov.
Dated: August 10, 2011.
Jon Worthington,
Administrator.
[FR Doc. 2011-20934 Filed 8-12-11; 4:15 pm]
BILLING CODE 6450-01-P