Mandan, Hidatsa and Arikara (MHA) Nation's Refinery, Notice of Availability of the Record of Decision (ROD), National Pollutant Discharge Elimination System (NPDES) Permit, 50214 [2011-20601]
Download as PDF
50214
Federal Register / Vol. 76, No. 156 / Friday, August 12, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 08/01/2011 through 08/05/2011.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110249, Draft Supplement,
USFS, OR, Cobbler II Timber Sale and
Fuels Reduction Project, Updated
Information to Revise and Clarify
Aspects of the Analyses Presented in
the FEIS of October 2010, Proposing
Vegetation and Fuels Management to
Improve Health and Vigor Upland
Forest Stands and Reduce Hazardous
and Ladder Fuels, Walla Walla Ranger
District, Umatilla National Forest,
Wallowa and Union Counties, OR,
Comment Period Ends: 09/26/2011,
Contact: Betsy Kaiser 509–522–6290.
EIS No. 20110250, Draft EIS, NRC, NH,
Generic—License Renewal of Nuclear
Plants Regarding Seabrook Station,
Supplemental 46, City of Seabrook,
Rockingham County, NH, Comment
Period Ends: 10/26/2011, Contact:
Michael Wentzel 301–415–6459.
EIS No. 20110251, Final EIS, USFS, WI,
Phelps Vegetation and Transportation
Management Project, Proposal to
Implement Vegetation and
Transportation Management
Activities, Eagle River-Florence
Ranger District, Vilas County, WI,
Review Period Ends: 09/12/2011,
Contact: Christine Brenner 715–479–
2827 Ext. 21.
EIS No. 20110252, Final EIS, BLM, WY,
Buckskin Mine Hay Creek II Project,
Coal Lease Application WYW–
172684, Wyoming Powder River
Basin, Campbell County, WY, Review
Period Ends: 09/12/2011, Contact:
Teresa Johnson 307–261–7600.
EIS No. 20110253, Final Supplement,
MMS, 00, Gulf of Mexico Outer
VerDate Mar<15>2010
16:37 Aug 11, 2011
Jkt 223001
Continental Shelf Oil and Gas Lease
Sales: 2011 Western Planning Area
Sales 218, TX, Review Period Ends:
09/12/2011, Contact: Gary Goeke 504–
736–3233.
EIS No. 20110254, Final EIS, FWS, WA,
Willapa National Wildlife Refuge
Draft Comprehensive Conservation
Plan, Implementation, Pacific County,
WA, Review Period Ends: 09/12/2011,
Contact: Charles Houghten 503–231–
6207.
EIS No. 20110255, Draft EIS, USFS, SD,
Streamboat Project, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
Ranger District, Black Hills National
Forest, Lawrence, Meade and
Pennington Counties, SD, Comment
Period Ends: 09/26/2011, Contact:
Rhonda O’Byrne 605–642–4622.
EIS No. 20110256, Draft EIS, FRA, CA,
California High-Speed Train (HST):
Fresno to Bakersfield Section HighSpeed Train, Proposes to Construct,
Operate, and Maintain an ElectricPowered High-Speed Train (HST),
Fresno, Kings, Tulare and Kern
Counties, CA, Comment Period Ends:
09/28/2011, Contact: David
Valenstein 202–493–6368.
EIS No. 20110257, Draft EIS, FRA, CA,
California High-Speed Train (HST):
Merced to Fresno Section High-Speed
Train, Proposes to Construct, Operate,
and Maintain an Electric-Powered
High-Speed Train (HST), Merced,
Madera and Fresno Counties, CA,
Comment Period Ends: 09/28/2011,
Contact: David Valenstein 202–493–
6868.
EIS No. 20110258, Final EIS, DOE, CA,
Topaz Solar Farm Project, Issuing a
Loan Guarantee to Royal Bank of
Scotland for Construction and
Startup, San Luis Obispo County, CA,
Review Period Ends: 09/12/2011,
Contact: Angela F. Colamaria 202–
287–5387.
Amended Notices
EIS No. 20110190, Draft EIS, FRA, MS,
Tupelo Railroad Relocation Planning
and Environmental Study, To
Improve Mobility and Safety by
Reducing Roadway Congestion, City
of Tupelo, MS, Comment Period Ends:
08/08/2011, Contact: John Winkle
202–493–6067. Revision to FR Notice
Published 06/24/2011: Extending
Comment Period from 08/08/2011 to
09/12/2011.
Dated: August 9, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–20599 Filed 8–11–11; 8:45 am]
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8998–5]
Mandan, Hidatsa and Arikara (MHA)
Nation’s Refinery, Notice of Availability
of the Record of Decision (ROD),
National Pollutant Discharge
Elimination System (NPDES) Permit
U.S. Environmental Protection
Agency (EPA).
AGENCY:
ACTION:
Notice.
The MHA Nation proposes to
construct, own and operate a 13,000
barrels-per-day petroleum refinery on
the Fort Berthold Indian Reservation
near Makoti in North Dakota. The
refinery will produce diesel fuel,
gasoline and propane. The NPDES
permit will be for surface water
discharges associated with the operation
of the refinery.
EPA’s decision to issue the NPDES
permit is based on the Environmental
Impact Statement (EIS), the Fact Sheet
for the NPDES permit and the
administrative record for the project.
EPA and the Bureau of Indian Affairs
issued the draft EIS in June 2006 and
the final EIS (FEIS) in August 2009.
Since the FEIS was issued, the MHA
Nation decided to change the refinery
feedstock from synthetic crude oil to the
Bakken formation crude. As a result of
the feedstock change, EPA evaluated the
potential changes in impacts and the
analysis in the FEIS. EPA’s evaluation is
summarized in a Supplemental
Information Report (SIR). The FEIS,
ROD and SIR are available for review at
https://www.epa.gov/region8/
compliance/nepa/mharefinery.html.
The appeal period for the NPDES permit
decision ends 30 days from the date of
this notice in accordance with 40 CFR
124.19.
SUMMARY:
Ms.
Dana Allen; Allen.dana@epa.gov, (303)
312–6870 regarding the ROD and SIR
and Mr. Robert Brobst;
Brobst.bob@epa.gov, (303) 312–6129
regarding the NPDES permit; U.S.
Environmental Protection Agency,
Region 8, 1595 Wynkoop Street; Denver,
Colorado, 80202–1129.
FOR FURTHER INFORMATION CONTACT:
Dated: August 9, 2011.
Susan E. Bromm,
Director, Office of Federal Activities.
[FR Doc. 2011–20601 Filed 8–11–11; 8:45 am]
BILLING CODE P
BILLING CODE 6560–50–P
PO 00000
Frm 00049
Fmt 4703
Sfmt 9990
E:\FR\FM\12AUN1.SGM
12AUN1
Agencies
[Federal Register Volume 76, Number 156 (Friday, August 12, 2011)]
[Notices]
[Page 50214]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20601]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8998-5]
Mandan, Hidatsa and Arikara (MHA) Nation's Refinery, Notice of
Availability of the Record of Decision (ROD), National Pollutant
Discharge Elimination System (NPDES) Permit
AGENCY: U.S. Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The MHA Nation proposes to construct, own and operate a 13,000
barrels-per-day petroleum refinery on the Fort Berthold Indian
Reservation near Makoti in North Dakota. The refinery will produce
diesel fuel, gasoline and propane. The NPDES permit will be for surface
water discharges associated with the operation of the refinery.
EPA's decision to issue the NPDES permit is based on the
Environmental Impact Statement (EIS), the Fact Sheet for the NPDES
permit and the administrative record for the project. EPA and the
Bureau of Indian Affairs issued the draft EIS in June 2006 and the
final EIS (FEIS) in August 2009. Since the FEIS was issued, the MHA
Nation decided to change the refinery feedstock from synthetic crude
oil to the Bakken formation crude. As a result of the feedstock change,
EPA evaluated the potential changes in impacts and the analysis in the
FEIS. EPA's evaluation is summarized in a Supplemental Information
Report (SIR). The FEIS, ROD and SIR are available for review at https://www.epa.gov/region8/compliance/nepa/mharefinery.html. The appeal period
for the NPDES permit decision ends 30 days from the date of this notice
in accordance with 40 CFR 124.19.
FOR FURTHER INFORMATION CONTACT: Ms. Dana Allen; Allen.dana@epa.gov,
(303) 312-6870 regarding the ROD and SIR and Mr. Robert Brobst;
Brobst.bob@epa.gov, (303) 312-6129 regarding the NPDES permit; U.S.
Environmental Protection Agency, Region 8, 1595 Wynkoop Street; Denver,
Colorado, 80202-1129.
Dated: August 9, 2011.
Susan E. Bromm,
Director, Office of Federal Activities.
[FR Doc. 2011-20601 Filed 8-11-11; 8:45 am]
BILLING CODE P