Environmental Impacts Statements; Notice of Availability, 50213-50214 [2011-20599]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 156 / Friday, August 12, 2011 / Notices
every five years. In 1999 DOE/NNSA
completed the first SNL/NM SWEIS
which examined existing and potential
impacts to the environment from
ongoing and anticipated future DOE/
NNSA operations conducted over
approximately a 10-year period of time
at SNL/NM and other DOE operations
on and around Kirtland Air Force Base
(KAFB). NNSA issued a Record of
Decision (ROD) for the SWEIS in
December 15, 1999 (64 FR 69996)
announcing its decision to continue
operations at SNL/NM under the
expanded operations alternative. In
August 2006, DOE/NNSA completed a
5-year review of the 1999 SNL/NM
SWEIS with the preparation of a
Supplement Analysis (SA) (DOE/EIS–
0281–SA–04), to determine the
adequacy of the existing EIS. Based on
the 2006 Final Supplement Analysis for
the Site-Wide Environmental Impact
Statement for Sandia National
Laboratories, New Mexico (DOE/EIS–
0281–SA–04), DOE/NNSA determined
that there were no substantial changes
to the actions or impacts evaluated in
the SNL/NM SWEIS, and there were no
significant new circumstances or
information relevant to environmental
concerns; thus, the existing SNL/NM
SWEIS was adequate and neither a
supplemental EIS nor a new EIS was
required.
The new SWEIS No Action
Alternative will include the
implementation of other decisions
supported by separate NEPA analyses
completed since the issuance of the
Final 1999 SNL/NM SWEIS. This
includes five Supplement Analyses
resulting in the determination that
further NEPA documentation was not
required: (1) Supplement Analysis for
the Final Site-Wide Environmental
Impact Statement for Sandia National
Laboratories, New Mexico to
Reestablishing Long-Term Pulse Mode
Testing Capability at the Annular Core
Research Reactor (ACRR), Sandia
National Laboratories, New Mexico
(ACRR Pulse Mode SA) (DOE/EIS–0281–
SA–01); (2) Supplement Analysis for the
Final Site-Wide Environmental Impact
Statement for Sandia National
Laboratories, New Mexico for Isentropic
Compression and Flyer Plate
Experiments Involving Plutonium at the
Z and Saturn Accelerators (Pu-ICE SA)
(DOE/EIS–0281–SA–02); (3)
Supplement Analysis for the Final SiteWide Environmental Impact Statement
for Sandia National Laboratories, New
Mexico for the Installation of a Petawatt
Laser System in TA–IV (Petawatt Laser
System SA) (DOE/EIS–0281–SA–03); (4)
Sandia National Laboratories, New
VerDate Mar<15>2010
16:37 Aug 11, 2011
Jkt 223001
Mexico Final Supplement Analysis for
the Site-Wide Environmental Impact
Statement (2006 SNL/NM SWEIS SA)
(DOE/EIS–0281–SA–04); and (5) Final
Complex Transformation Supplemental
Programmatic Environmental Impact
Statement (DOE/EIS–0235–S4) and its
RODs (73 FR 77644 and 73 FR 77656).
In addition the following seven
environmental assessments and their
associated Findings of No Significant
Impacts will also be included in the No
Action Alternative as well as actions
categorically excluded from the need for
preparation of either an EA or an EIS:
(1) Environmental Assessment for the
Microsystems and Engineering Sciences
Applications Complex, DOE/EA–1335,
September 2000; (2) Final
Environmental Assessment for the Test
Capabilities Revitalization at Sandia
National Laboratories, New Mexico,
DOE/EA–1446, January 2003; (3) Final
Environmental Assessment for the
Center for Integrated Nanotechnologies
at Sandia National Laboratories, New
Mexico, DOE/EA–1457, March 2003; (4)
Final Environmental Assessment for the
Proposed Consolidation of Neutron
Generator Tritium Target Loading
Production, DOE/EA–1532, June 2005;
(5) Final Environmental Assessment for
the Expansion of Permitted Land and
Operations at the 9940 Complex and
Thunder Range at Sandia National
Laboratories, New Mexico, DOE/EA–
1603, April 2008; (6) Final
Environmental Assessment for the
Removal Actions at the technical Area
III Classified Waste Landfill, Sandia
National Laboratories, New Mexico,
DOE/EA–1729, August 2010; (7) Final
Environmental Assessment for Proposed
Construction and Lease of New
Facilities for the Department of Energy,
National Nuclear Security
Administration, Office of Secure
Transportation (Albuquerque
transportation and Technology Center)
Albuquerque, New Mexico, U. S.
General Services Administration, July
2006. These various documents can be
reviewed at the DOE/NNSA Public
Reading Room at Government
Information/Zimmerman Library,
MSC05 3020, 1 University of New
Mexico, Albuquerque, NM 87131–0001,
Tel: 505/277–5441 Fax: 505/277–6019;
E-mail: govref@unm.edu; Reading Room
Web site: https://elibrary.unm.edu/doe;
and on the Internet at: https://
nepa.energy.gov.
On June 24, 2011, (76 FR 37100),
NNSA published a NOI for the
preparation of a SWEIS (DOE/EIS–0466)
for the continued operation of DOE/
NNSA activities at SNL/NM on KAFB
and within the Albuquerque area, and
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
50213
other DOE activities at both on-site and
off-site locations (i. e., the NNSA
Service Center, the NNSA Office of
Secure Transportation, NNSA Kirtland
Operations, the NNSA Aviation Facility,
and the DOE National Training Center).
The NOI stated that the public scoping
period would continue for 45 days after
publication in the Federal Register,
ending on August 8, 2011. NNSA has
decided to re-open the public scoping
period through September 12, 2011.
NNSA has also decided to hold two
additional public scoping meetings
during the comment period. The newly
added public scoping meetings will take
place on Thursday September 1, 2011,
in Albuquerque, NM. The complete
schedule for the additional public
scoping meetings on the SWEIS with all
dates, times, and locations is the
provided above, under DATES.
The SWEIS scoping meetings will use
a format to facilitate dialogue between
DOE/NNSA and the public and will
provide individuals the opportunity to
give written or oral statements. DOE/
NNSA welcomes specific comments or
suggestions on the SWEIS process.
NNSA invites stakeholders and
members of the public to submit
comments on the scope of the SWEIS
during the public scoping period, which
started with the publication of the NOI
in the Federal Register on June 24,
2011, and will now be continued
through September 12, 2011. NNSA will
consider comments received after this
date to the extent practicable as it
prepares the draft SWEIS. Questions or
Comments concerning the scope of the
SWEIS can be submitted to the NNSA
SSO at the same postal and electronic
addresses given above. Additionally, the
SSO SWEIS Hotline provides
instructions on how to record
comments. Please mark all envelopes,
faxes and e-mail: ‘‘Scoping Comments
SSO SNL/NM SWEIS’’.
Issued in Washington, DC on August 9,
2011.
Thomas P. D’Agostino,
Administrator, National Nuclear Security
Administration.
[FR Doc. 2011–20546 Filed 8–11–11; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8998–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
E:\FR\FM\12AUN1.SGM
12AUN1
50214
Federal Register / Vol. 76, No. 156 / Friday, August 12, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 08/01/2011 through 08/05/2011.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of
the Clean Air Act, EPA is required to
make its comments on EISs issued by
other Federal agencies public.
Historically, EPA met this mandate by
publishing weekly notices of availability
of EPA comments, which includes a
brief summary of EPA’s comment
letters, in the Federal Register. Since
February 2008, EPA has included its
comment letters on EISs on its Web site
at: https://www.epa.gov/compliance/
nepa/eisdata.html. Including the entire
EIS comment letters on the Web site
satisfies the Section 309(a) requirement
to make EPA’s comments on EISs
available to the public. Accordingly, on
March 31, 2010, EPA discontinued the
publication of the notice of availability
of EPA comments in the Federal
Register.
EIS No. 20110249, Draft Supplement,
USFS, OR, Cobbler II Timber Sale and
Fuels Reduction Project, Updated
Information to Revise and Clarify
Aspects of the Analyses Presented in
the FEIS of October 2010, Proposing
Vegetation and Fuels Management to
Improve Health and Vigor Upland
Forest Stands and Reduce Hazardous
and Ladder Fuels, Walla Walla Ranger
District, Umatilla National Forest,
Wallowa and Union Counties, OR,
Comment Period Ends: 09/26/2011,
Contact: Betsy Kaiser 509–522–6290.
EIS No. 20110250, Draft EIS, NRC, NH,
Generic—License Renewal of Nuclear
Plants Regarding Seabrook Station,
Supplemental 46, City of Seabrook,
Rockingham County, NH, Comment
Period Ends: 10/26/2011, Contact:
Michael Wentzel 301–415–6459.
EIS No. 20110251, Final EIS, USFS, WI,
Phelps Vegetation and Transportation
Management Project, Proposal to
Implement Vegetation and
Transportation Management
Activities, Eagle River-Florence
Ranger District, Vilas County, WI,
Review Period Ends: 09/12/2011,
Contact: Christine Brenner 715–479–
2827 Ext. 21.
EIS No. 20110252, Final EIS, BLM, WY,
Buckskin Mine Hay Creek II Project,
Coal Lease Application WYW–
172684, Wyoming Powder River
Basin, Campbell County, WY, Review
Period Ends: 09/12/2011, Contact:
Teresa Johnson 307–261–7600.
EIS No. 20110253, Final Supplement,
MMS, 00, Gulf of Mexico Outer
VerDate Mar<15>2010
16:37 Aug 11, 2011
Jkt 223001
Continental Shelf Oil and Gas Lease
Sales: 2011 Western Planning Area
Sales 218, TX, Review Period Ends:
09/12/2011, Contact: Gary Goeke 504–
736–3233.
EIS No. 20110254, Final EIS, FWS, WA,
Willapa National Wildlife Refuge
Draft Comprehensive Conservation
Plan, Implementation, Pacific County,
WA, Review Period Ends: 09/12/2011,
Contact: Charles Houghten 503–231–
6207.
EIS No. 20110255, Draft EIS, USFS, SD,
Streamboat Project, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
Ranger District, Black Hills National
Forest, Lawrence, Meade and
Pennington Counties, SD, Comment
Period Ends: 09/26/2011, Contact:
Rhonda O’Byrne 605–642–4622.
EIS No. 20110256, Draft EIS, FRA, CA,
California High-Speed Train (HST):
Fresno to Bakersfield Section HighSpeed Train, Proposes to Construct,
Operate, and Maintain an ElectricPowered High-Speed Train (HST),
Fresno, Kings, Tulare and Kern
Counties, CA, Comment Period Ends:
09/28/2011, Contact: David
Valenstein 202–493–6368.
EIS No. 20110257, Draft EIS, FRA, CA,
California High-Speed Train (HST):
Merced to Fresno Section High-Speed
Train, Proposes to Construct, Operate,
and Maintain an Electric-Powered
High-Speed Train (HST), Merced,
Madera and Fresno Counties, CA,
Comment Period Ends: 09/28/2011,
Contact: David Valenstein 202–493–
6868.
EIS No. 20110258, Final EIS, DOE, CA,
Topaz Solar Farm Project, Issuing a
Loan Guarantee to Royal Bank of
Scotland for Construction and
Startup, San Luis Obispo County, CA,
Review Period Ends: 09/12/2011,
Contact: Angela F. Colamaria 202–
287–5387.
Amended Notices
EIS No. 20110190, Draft EIS, FRA, MS,
Tupelo Railroad Relocation Planning
and Environmental Study, To
Improve Mobility and Safety by
Reducing Roadway Congestion, City
of Tupelo, MS, Comment Period Ends:
08/08/2011, Contact: John Winkle
202–493–6067. Revision to FR Notice
Published 06/24/2011: Extending
Comment Period from 08/08/2011 to
09/12/2011.
Dated: August 9, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–20599 Filed 8–11–11; 8:45 am]
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8998–5]
Mandan, Hidatsa and Arikara (MHA)
Nation’s Refinery, Notice of Availability
of the Record of Decision (ROD),
National Pollutant Discharge
Elimination System (NPDES) Permit
U.S. Environmental Protection
Agency (EPA).
AGENCY:
ACTION:
Notice.
The MHA Nation proposes to
construct, own and operate a 13,000
barrels-per-day petroleum refinery on
the Fort Berthold Indian Reservation
near Makoti in North Dakota. The
refinery will produce diesel fuel,
gasoline and propane. The NPDES
permit will be for surface water
discharges associated with the operation
of the refinery.
EPA’s decision to issue the NPDES
permit is based on the Environmental
Impact Statement (EIS), the Fact Sheet
for the NPDES permit and the
administrative record for the project.
EPA and the Bureau of Indian Affairs
issued the draft EIS in June 2006 and
the final EIS (FEIS) in August 2009.
Since the FEIS was issued, the MHA
Nation decided to change the refinery
feedstock from synthetic crude oil to the
Bakken formation crude. As a result of
the feedstock change, EPA evaluated the
potential changes in impacts and the
analysis in the FEIS. EPA’s evaluation is
summarized in a Supplemental
Information Report (SIR). The FEIS,
ROD and SIR are available for review at
https://www.epa.gov/region8/
compliance/nepa/mharefinery.html.
The appeal period for the NPDES permit
decision ends 30 days from the date of
this notice in accordance with 40 CFR
124.19.
SUMMARY:
Ms.
Dana Allen; Allen.dana@epa.gov, (303)
312–6870 regarding the ROD and SIR
and Mr. Robert Brobst;
Brobst.bob@epa.gov, (303) 312–6129
regarding the NPDES permit; U.S.
Environmental Protection Agency,
Region 8, 1595 Wynkoop Street; Denver,
Colorado, 80202–1129.
FOR FURTHER INFORMATION CONTACT:
Dated: August 9, 2011.
Susan E. Bromm,
Director, Office of Federal Activities.
[FR Doc. 2011–20601 Filed 8–11–11; 8:45 am]
BILLING CODE P
BILLING CODE 6560–50–P
PO 00000
Frm 00049
Fmt 4703
Sfmt 9990
E:\FR\FM\12AUN1.SGM
12AUN1
Agencies
[Federal Register Volume 76, Number 156 (Friday, August 12, 2011)]
[Notices]
[Pages 50213-50214]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20599]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8998-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202)
[[Page 50214]]
564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 08/01/2011 through 08/05/2011.
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is
required to make its comments on EISs issued by other Federal agencies
public. Historically, EPA met this mandate by publishing weekly notices
of availability of EPA comments, which includes a brief summary of
EPA's comment letters, in the Federal Register. Since February 2008,
EPA has included its comment letters on EISs on its Web site at: https://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS
comment letters on the Web site satisfies the Section 309(a)
requirement to make EPA's comments on EISs available to the public.
Accordingly, on March 31, 2010, EPA discontinued the publication of the
notice of availability of EPA comments in the Federal Register.
EIS No. 20110249, Draft Supplement, USFS, OR, Cobbler II Timber Sale
and Fuels Reduction Project, Updated Information to Revise and Clarify
Aspects of the Analyses Presented in the FEIS of October 2010,
Proposing Vegetation and Fuels Management to Improve Health and Vigor
Upland Forest Stands and Reduce Hazardous and Ladder Fuels, Walla Walla
Ranger District, Umatilla National Forest, Wallowa and Union Counties,
OR, Comment Period Ends: 09/26/2011, Contact: Betsy Kaiser 509-522-
6290.
EIS No. 20110250, Draft EIS, NRC, NH, Generic--License Renewal of
Nuclear Plants Regarding Seabrook Station, Supplemental 46, City of
Seabrook, Rockingham County, NH, Comment Period Ends: 10/26/2011,
Contact: Michael Wentzel 301-415-6459.
EIS No. 20110251, Final EIS, USFS, WI, Phelps Vegetation and
Transportation Management Project, Proposal to Implement Vegetation and
Transportation Management Activities, Eagle River-Florence Ranger
District, Vilas County, WI, Review Period Ends: 09/12/2011, Contact:
Christine Brenner 715-479-2827 Ext. 21.
EIS No. 20110252, Final EIS, BLM, WY, Buckskin Mine Hay Creek II
Project, Coal Lease Application WYW-172684, Wyoming Powder River Basin,
Campbell County, WY, Review Period Ends: 09/12/2011, Contact: Teresa
Johnson 307-261-7600.
EIS No. 20110253, Final Supplement, MMS, 00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease Sales: 2011 Western Planning Area
Sales 218, TX, Review Period Ends: 09/12/2011, Contact: Gary Goeke 504-
736-3233.
EIS No. 20110254, Final EIS, FWS, WA, Willapa National Wildlife Refuge
Draft Comprehensive Conservation Plan, Implementation, Pacific County,
WA, Review Period Ends: 09/12/2011, Contact: Charles Houghten 503-231-
6207.
EIS No. 20110255, Draft EIS, USFS, SD, Streamboat Project, Proposes to
Implement Multiple Resource Management Actions, Northern Hills Ranger
District, Black Hills National Forest, Lawrence, Meade and Pennington
Counties, SD, Comment Period Ends: 09/26/2011, Contact: Rhonda O'Byrne
605-642-4622.
EIS No. 20110256, Draft EIS, FRA, CA, California High-Speed Train
(HST): Fresno to Bakersfield Section High-Speed Train, Proposes to
Construct, Operate, and Maintain an Electric-Powered High-Speed Train
(HST), Fresno, Kings, Tulare and Kern Counties, CA, Comment Period
Ends: 09/28/2011, Contact: David Valenstein 202-493-6368.
EIS No. 20110257, Draft EIS, FRA, CA, California High-Speed Train
(HST): Merced to Fresno Section High-Speed Train, Proposes to
Construct, Operate, and Maintain an Electric-Powered High-Speed Train
(HST), Merced, Madera and Fresno Counties, CA, Comment Period Ends: 09/
28/2011, Contact: David Valenstein 202-493-6868.
EIS No. 20110258, Final EIS, DOE, CA, Topaz Solar Farm Project, Issuing
a Loan Guarantee to Royal Bank of Scotland for Construction and
Startup, San Luis Obispo County, CA, Review Period Ends: 09/12/2011,
Contact: Angela F. Colamaria 202-287-5387.
Amended Notices
EIS No. 20110190, Draft EIS, FRA, MS, Tupelo Railroad Relocation
Planning and Environmental Study, To Improve Mobility and Safety by
Reducing Roadway Congestion, City of Tupelo, MS, Comment Period Ends:
08/08/2011, Contact: John Winkle 202-493-6067. Revision to FR Notice
Published 06/24/2011: Extending Comment Period from 08/08/2011 to 09/
12/2011.
Dated: August 9, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-20599 Filed 8-11-11; 8:45 am]
BILLING CODE 6560-50-P