Red River Hydro LLC; Notice of Application Tendered For Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 49462-49463 [2011-20269]
Download as PDF
49462
Federal Register / Vol. 76, No. 154 / Wednesday, August 10, 2011 / Notices
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–3107) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20264 Filed 8–9–11; 8:45 am]
[FR Doc. 2011–20268 Filed 8–9–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 3107–004]
[Project No. 13160–002]
Newfound Hydroelectric Company,
KTZ Hydro, LLC; Notice of Application
for Transfer of License, and Soliciting
Comments and Motions To Intervene
emcdonald on DSK2BSOYB1PROD with NOTICES
burden of the collections of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g. permitting electronic submission of
responses.
Red River Hydro LLC; Notice of
Application Tendered For Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
On July 25, 2011, Newfound
Hydroelectric Company (transferor) and
KTZ Hydro, LLC (transferee) filed an
application for transfer of license for the
Newfound Hydroelectric Project, No.
3107, located on the Newfound River in
Grafton County, New Hampshire.
Applicants seek Commission approval
to transfer the license for the Newfound
Hydroelectric Project from transferor to
transferee.
Applicants’ Contact: Transferor:
Nathan Wechsler, Newfound
Hydroelectric Company, 31 Bristol
Drive, Boynton Beach, FL 33436, (407)
736–5360. Transferee: Robert King, KTZ
Hydro, LLC, 42 Hurricane Rd., Keene,
NH 03431, (603) 352–3444.
FERC Contact: Jeremy M. Jessup (202)
502–6779, Jeremy.Jessup@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
VerDate Mar<15>2010
17:48 Aug 09, 2011
Jkt 223001
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 13160–002.
c. Date Filed: July 29, 2011.
d. Applicant: Red River Hydro LLC
(Red River), a wholly-owned subsidiary
of Symbiotics LLC.
e. Name of Project: Overton Lock and
Dam Hydroelectric Project.
f. Location: The project would be
located on the Red River in Rapides
Parish, Louisiana at an existing lock and
dam owned and operated by the U.S.
Corps of Engineers (Corps). The project
would occupy 42.5 acres of federal
lands managed by the Corps.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, Chief Operating Officer,
Symbiotics LLC 371 Upper Terrace,
Suite 2, Bend, OR 97702; Telephone
(541)-330–8779.
i. FERC Contact: Lesley Kordella,
(202) 502–6406 or
Lesley.Kordella@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
project would be located at an existing
lock and dam owned and operated by
the Corps-Vicksburg District. The
existing lock and dam are part of the J.
Bennett Johnston Waterway, which was
authorized by Congress in 1968 to
stabilize river banks, straighten river
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
bends, and maintain a 9-foot-deep, 200foot-wide channel for boat traffic. The
waterway consists of five locks and
dams and a number of cutoffs to shorten
the river.
The existing Overton dam is a
concrete gravity structure that is 104
feet in height and 914 feet in length. The
spillway consists of five 60-foot-wide
Tainter gates. The navigation lock is 84
feet wide by 685 feet long. The purpose
of the lock and dam system is
navigation and not storage. The upper
pool above the dam is commonly
referred to as ‘‘Pool 2’’. The Corps
maintains the upper pool at an elevation
of 64 feet. Pool 2 has a surface area of
approximately 3,750 acres and a storage
capacity of approximately 67,500 acrefeet.
The proposed Overton Lock and Dam
Project would consist of: (1) A
powerhouse located on the southwest
bank of the river at the existing dam’s
right abutment; (2) a headrace; (3) a
tailrace; (4) a new switchyard; (5) 3.9
miles of 138-kilovolt (kV) above-ground
transmission line; (6) three turbinegenerator units for a combined installed
capacity of 78 megawatts; and (7)
appurtenant facilities. The projected
annual energy generation would be
255.7 gigawatt hours.
The project would operate in a run-ofrelease mode utilizing releases from
Pool 2 as they are dictated by the Corps,
with no proposed change to the Corps’
facility operation. In addition, no
changes to the reservoir pool elevations
or downstream river flows are proposed.
The project would generate power using
flows between 2,700 cfs (cubic feet per
second) and 49,800 cfs. If flows are less
than 2,700 cfs, all flow would go
through the Corps’ gates and the project
would then be offline. When flows are
greater than 49,800 cfs, the excess flow
would be directed through the Corps
gates.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
E:\FR\FM\10AUN1.SGM
10AUN1
Federal Register / Vol. 76, No. 154 / Wednesday, August 10, 2011 / Notices
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice
of Ready for Environmental
Analysis (when FERC approved studies are complete).
Filing of recommendations,
preliminary terms and conditions, and fishway prescriptions.
Commission issues Non-Draft
EA.
Comments on EA ..................
Modified terms and conditions.
October 2011.
December
2011.
April 2012.
May 2012.
July 2012.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20269 Filed 8–9–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2106–000]
emcdonald on DSK2BSOYB1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Authorization for Continued
Project Operation
On June 16, 2009, Pacific Gas and
Electric Company, licensee for the
McCloud-Pit Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The McCloud-Pit
Hydroelectric Project is located on the
McCloud and Pit Rivers in Shasta
County, California.
The license for Project No. 2106 was
issued for a period ending July 31, 2011.
Section 15(a)(1) of the FPA, 16 USC
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
VerDate Mar<15>2010
17:48 Aug 09, 2011
Jkt 223001
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 USC 558(c), and as set
forth at 18 CFR 16.21(a), if the licensee
of such project has filed an application
for a subsequent license, the licensee
may continue to operate the project in
accordance with the terms and
conditions of the license after the minor
or minor part license expires, until the
Commission acts on its application. If
the licensee of such a project has not
filed an application for a subsequent
license, then it may be required,
pursuant to 18 CFR 16.21(b), to continue
project operations until the Commission
issues someone else a license for the
project or otherwise orders disposition
of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2106
is issued to the Pacific Gas and Electric
Company for a period effective August
1, 2011 through July 31, 2012, or until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first. If issuance
of a new license (or other disposition)
does not take place on or before July 31,
2012, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Pacific Gas and Electric
Company is authorized to continue
operation of the McCloud-Pit
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20267 Filed 8–9–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–101–000.
Applicants: Rumford Paper Company,
Rumford Falls Hydro LLC.
Description: Application under
Section 203 of the FPA of Rumford
Paper Company and Rumford Falls
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
49463
Hydro LLC for the return of certain
jointly owned electrical delivery
facilities.
Filed Date: 08/03/2011.
Accession Number: 20110803–5063.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4195–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc.
submits tariff filing per 35.1: Rate
Schedule No. 94 to be effective
10/1/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5000.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4196–000.
Applicants: Michigan Electric
Transmission Company, Midwest
Independent Transmission System
Operator, Inc.
Description: Michigan Electric
Transmission Company, LLC submits
tariff filing per 35.13(a)(2)(iii): METCGratiot County Wind E&P to be effective
10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5013.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4197–000.
Applicants: Michigan Electric
Transmission Company, LLC, Midwest
Independent Transmission System
Operator, Inc.
Description: Michigan Electric
Transmission Company, LLC submits
tariff filing per 35.13(a)(2)(iii): METCLowell Light and Power IFA to be
effective 10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5014.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4198–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii):
ITC Midwest-Lost Lakes E&P to be
effective 10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5015.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4199–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 76, Number 154 (Wednesday, August 10, 2011)]
[Notices]
[Pages 49462-49463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20269]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13160-002]
Red River Hydro LLC; Notice of Application Tendered For Filing
With the Commission and Establishing Procedural Schedule for Licensing
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 13160-002.
c. Date Filed: July 29, 2011.
d. Applicant: Red River Hydro LLC (Red River), a wholly-owned
subsidiary of Symbiotics LLC.
e. Name of Project: Overton Lock and Dam Hydroelectric Project.
f. Location: The project would be located on the Red River in
Rapides Parish, Louisiana at an existing lock and dam owned and
operated by the U.S. Corps of Engineers (Corps). The project would
occupy 42.5 acres of federal lands managed by the Corps.
g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).
h. Applicant Contact: Mr. Brent L. Smith, Chief Operating Officer,
Symbiotics LLC 371 Upper Terrace, Suite 2, Bend, OR 97702; Telephone
(541)-330-8779.
i. FERC Contact: Lesley Kordella, (202) 502-6406 or
Lesley.Kordella@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The project would be located at an
existing lock and dam owned and operated by the Corps-Vicksburg
District. The existing lock and dam are part of the J. Bennett Johnston
Waterway, which was authorized by Congress in 1968 to stabilize river
banks, straighten river bends, and maintain a 9-foot-deep, 200-foot-
wide channel for boat traffic. The waterway consists of five locks and
dams and a number of cutoffs to shorten the river.
The existing Overton dam is a concrete gravity structure that is
104 feet in height and 914 feet in length. The spillway consists of
five 60-foot-wide Tainter gates. The navigation lock is 84 feet wide by
685 feet long. The purpose of the lock and dam system is navigation and
not storage. The upper pool above the dam is commonly referred to as
``Pool 2''. The Corps maintains the upper pool at an elevation of 64
feet. Pool 2 has a surface area of approximately 3,750 acres and a
storage capacity of approximately 67,500 acre-feet.
The proposed Overton Lock and Dam Project would consist of: (1) A
powerhouse located on the southwest bank of the river at the existing
dam's right abutment; (2) a headrace; (3) a tailrace; (4) a new
switchyard; (5) 3.9 miles of 138-kilovolt (kV) above-ground
transmission line; (6) three turbine-generator units for a combined
installed capacity of 78 megawatts; and (7) appurtenant facilities. The
projected annual energy generation would be 255.7 gigawatt hours.
The project would operate in a run-of-release mode utilizing
releases from Pool 2 as they are dictated by the Corps, with no
proposed change to the Corps' facility operation. In addition, no
changes to the reservoir pool elevations or downstream river flows are
proposed. The project would generate power using flows between 2,700
cfs (cubic feet per second) and 49,800 cfs. If flows are less than
2,700 cfs, all flow would go through the Corps' gates and the project
would then be offline. When flows are greater than 49,800 cfs, the
excess flow would be directed through the Corps gates.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances
[[Page 49463]]
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for October 2011.
Environmental Analysis (when FERC
approved studies are complete).
Filing of recommendations, preliminary December 2011.
terms and conditions, and fishway
prescriptions.
Commission issues Non-Draft EA............ April 2012.
Comments on EA............................ May 2012.
Modified terms and conditions............. July 2012.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20269 Filed 8-9-11; 8:45 am]
BILLING CODE 6717-01-P