Pacific Gas and Electric Company; Notice of Authorization for Continued Project Operation, 49463 [2011-20267]
Download as PDF
Federal Register / Vol. 76, No. 154 / Wednesday, August 10, 2011 / Notices
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice
of Ready for Environmental
Analysis (when FERC approved studies are complete).
Filing of recommendations,
preliminary terms and conditions, and fishway prescriptions.
Commission issues Non-Draft
EA.
Comments on EA ..................
Modified terms and conditions.
October 2011.
December
2011.
April 2012.
May 2012.
July 2012.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20269 Filed 8–9–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2106–000]
emcdonald on DSK2BSOYB1PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Authorization for Continued
Project Operation
On June 16, 2009, Pacific Gas and
Electric Company, licensee for the
McCloud-Pit Hydroelectric Project, filed
an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The McCloud-Pit
Hydroelectric Project is located on the
McCloud and Pit Rivers in Shasta
County, California.
The license for Project No. 2106 was
issued for a period ending July 31, 2011.
Section 15(a)(1) of the FPA, 16 USC
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
VerDate Mar<15>2010
17:48 Aug 09, 2011
Jkt 223001
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 USC 558(c), and as set
forth at 18 CFR 16.21(a), if the licensee
of such project has filed an application
for a subsequent license, the licensee
may continue to operate the project in
accordance with the terms and
conditions of the license after the minor
or minor part license expires, until the
Commission acts on its application. If
the licensee of such a project has not
filed an application for a subsequent
license, then it may be required,
pursuant to 18 CFR 16.21(b), to continue
project operations until the Commission
issues someone else a license for the
project or otherwise orders disposition
of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2106
is issued to the Pacific Gas and Electric
Company for a period effective August
1, 2011 through July 31, 2012, or until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first. If issuance
of a new license (or other disposition)
does not take place on or before July 31,
2012, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the Pacific Gas and Electric
Company is authorized to continue
operation of the McCloud-Pit
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20267 Filed 8–9–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–101–000.
Applicants: Rumford Paper Company,
Rumford Falls Hydro LLC.
Description: Application under
Section 203 of the FPA of Rumford
Paper Company and Rumford Falls
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
49463
Hydro LLC for the return of certain
jointly owned electrical delivery
facilities.
Filed Date: 08/03/2011.
Accession Number: 20110803–5063.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–4195–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc.
submits tariff filing per 35.1: Rate
Schedule No. 94 to be effective
10/1/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5000.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4196–000.
Applicants: Michigan Electric
Transmission Company, Midwest
Independent Transmission System
Operator, Inc.
Description: Michigan Electric
Transmission Company, LLC submits
tariff filing per 35.13(a)(2)(iii): METCGratiot County Wind E&P to be effective
10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5013.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4197–000.
Applicants: Michigan Electric
Transmission Company, LLC, Midwest
Independent Transmission System
Operator, Inc.
Description: Michigan Electric
Transmission Company, LLC submits
tariff filing per 35.13(a)(2)(iii): METCLowell Light and Power IFA to be
effective 10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5014.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4198–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii):
ITC Midwest-Lost Lakes E&P to be
effective 10/3/2011.
Filed Date: 08/03/2011.
Accession Number: 20110803–5015.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 24, 2011.
Docket Numbers: ER11–4199–000.
Applicants: Midwest Independent
Transmission System Operator, Inc., ITC
Midwest LLC.
Description: Midwest Independent
Transmission System Operator, Inc.
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 76, Number 154 (Wednesday, August 10, 2011)]
[Notices]
[Page 49463]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20267]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2106-000]
Pacific Gas and Electric Company; Notice of Authorization for
Continued Project Operation
On June 16, 2009, Pacific Gas and Electric Company, licensee for
the McCloud-Pit Hydroelectric Project, filed an Application for a New
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The McCloud-Pit Hydroelectric Project is
located on the McCloud and Pit Rivers in Shasta County, California.
The license for Project No. 2106 was issued for a period ending
July 31, 2011. Section 15(a)(1) of the FPA, 16 USC 808(a)(1), requires
the Commission, at the expiration of a license term, to issue from
year-to-year an annual license to the then licensee under the terms and
conditions of the prior license until a new license is issued, or the
project is otherwise disposed of as provided in section 15 or any other
applicable section of the FPA. If the project's prior license waived
the applicability of section 15 of the FPA, then, based on section 9(b)
of the Administrative Procedure Act, 5 USC 558(c), and as set forth at
18 CFR 16.21(a), if the licensee of such project has filed an
application for a subsequent license, the licensee may continue to
operate the project in accordance with the terms and conditions of the
license after the minor or minor part license expires, until the
Commission acts on its application. If the licensee of such a project
has not filed an application for a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b), to continue project operations
until the Commission issues someone else a license for the project or
otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2106 is issued to
the Pacific Gas and Electric Company for a period effective August 1,
2011 through July 31, 2012, or until the issuance of a new license for
the project or other disposition under the FPA, whichever comes first.
If issuance of a new license (or other disposition) does not take place
on or before July 31, 2012, notice is hereby given that, pursuant to 18
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the Pacific Gas and Electric Company is authorized to
continue operation of the McCloud-Pit Hydroelectric Project, until such
time as the Commission acts on its application for a subsequent
license.
Dated: August 4, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20267 Filed 8-9-11; 8:45 am]