Federal Register / Vol. 76, No. 153 / Tuesday, August 9, 2011 / Notices
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 2, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20065 Filed 8–8–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14136–000; 14139–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Lock+TM Hydro Friends Fund XXXV
Riverbank Hydro No. 4, LLC; Notice of
Competing Preliminary Permit
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 1, 2011, Lock+TM Hydro
Friends Fund XXXV (Hydro Friends)
and Riverbank Hydro No. 4, LLC
(Riverbank Hydro) filed preliminary
permit applications, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Lock and Dam No. 5,
located on the Mississippi River near
Minnesota City, Minnesota, in Winona
County, Minnesota, and Buffalo County,
Wisconsin. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
VerDate Mar<15>2010
19:06 Aug 08, 2011
Jkt 223001
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Hydro Friends’ proposed Project
Oscar Project No. 14136–000 would
consist of: (1) A 109-foot-wide, 40-foothigh lock frame module placed in a new
gate constructed in the downstream
portion of an inactive, incomplete
auxiliary lock of the Lock and Dam No.
5; (2) a 109-foot-wide, 40-foot-high lock
frame module placed east of the
movable section of the Lock and Dam
No. 5 in an existing levee of the east
abutment; (3) a new switchyard and
control room located on the eastern side
of the dam; and (4) a new 3-mile-long,
115-kilovolt transmission line extending
from the switchyard to a nearby
distribution line which would feed the
project power to the grid. Each lock
frame module would consist of ten 7foot-diameter hydropower turbines each
rated at 650 kilowatts (kW) based on a
design head of 9 feet with a total rated
capacity per module of 6.5 megawatts
(MW) resulting in a total project
installed capacity of 13 MW. Each
module would be equipped with fish/
debris screens located upstream of each
module and control door assemblies
that can open and close off flow to the
units when needed. The project’s
average annual generation would be
79,770 megawatt-hours (MWh), and the
project would operate run-of-release.
Applicant Contact: Mr. Wayne F.
Krouse, Managing Partner, Lock+TM
Hydro Friends Fund XXXV, 5090
Richmond Avenue #390, Houston, TX
77056, phone (877) 556–6566, extension
709.
Riverbank Hydro’s Mississippi 5
Hydroelectric Project No. 14139–000
would consist of: (1) A forebay and
intake structure equipped with a
trashrack constructed upstream of the
powerhouse on the east section of the
dam in the existing levee of the east
abutment; (2) a reinforced concrete
powerhouse containing five turbinegenerators each with a rating of 4,000
kW for a total project installed capacity
of 20 MW; (3) a tailrace directing river
flows back into the Mississippi River;
and (4) a 13.1-mile-long, 69-kV
transmission line feeding the project
power to an existing transmission line.
The intake, powerhouse, and tailrace
dimensions would be determined
during the permit period. The project’s
average annual generation would be
87,000 MWh at a head range of 5.0 to
9.5 feet, and the project would operate
run-of-release.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
Applicant Contact: Kuo-Bao Tong,
Riverbank Power Corporation, Royal
Bank Plaza, South Tower, P.O. Box 166,
200 Bay Street, Suite 3230, Toronto, ON,
Canada M5J 2J4, phone (416) 861–0092,
extension 154.
FERC Contact: Sergiu Serban,
sergiu.serban@ferc.gov, (202) 502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about each project,
including a copy of the applications,
can be viewed or printed on the
‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–14136–000, or P–14139–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20155 Filed 8–8–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 739–000]
Appalachian Power Company; Notice
of Authorization for Continued Project
Operation
On June 29 2009, The Appalachian
Power Company, licensee for the
Claytor Hydroelectric Project, filed an
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 76, Number 153 (Tuesday, August 9, 2011)]
[Notices]
[Page 48840]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20155]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14136-000; 14139-000]
Lock+\TM\ Hydro Friends Fund XXXV Riverbank Hydro No. 4, LLC;
Notice of Competing Preliminary Permit Applications Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Competing
Applications
On April 1, 2011, Lock+\TM\ Hydro Friends Fund XXXV (Hydro Friends)
and Riverbank Hydro No. 4, LLC (Riverbank Hydro) filed preliminary
permit applications, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of a hydropower project at the U.S.
Army Corps of Engineers' (Corps) Lock and Dam No. 5, located on the
Mississippi River near Minnesota City, Minnesota, in Winona County,
Minnesota, and Buffalo County, Wisconsin. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
Hydro Friends' proposed Project Oscar Project No. 14136-000 would
consist of: (1) A 109-foot-wide, 40-foot-high lock frame module placed
in a new gate constructed in the downstream portion of an inactive,
incomplete auxiliary lock of the Lock and Dam No. 5; (2) a 109-foot-
wide, 40-foot-high lock frame module placed east of the movable section
of the Lock and Dam No. 5 in an existing levee of the east abutment;
(3) a new switchyard and control room located on the eastern side of
the dam; and (4) a new 3-mile-long, 115-kilovolt transmission line
extending from the switchyard to a nearby distribution line which would
feed the project power to the grid. Each lock frame module would
consist of ten 7-foot-diameter hydropower turbines each rated at 650
kilowatts (kW) based on a design head of 9 feet with a total rated
capacity per module of 6.5 megawatts (MW) resulting in a total project
installed capacity of 13 MW. Each module would be equipped with fish/
debris screens located upstream of each module and control door
assemblies that can open and close off flow to the units when needed.
The project's average annual generation would be 79,770 megawatt-hours
(MWh), and the project would operate run-of-release.
Applicant Contact: Mr. Wayne F. Krouse, Managing Partner, Lock+\TM\
Hydro Friends Fund XXXV, 5090 Richmond Avenue 390, Houston, TX
77056, phone (877) 556-6566, extension 709.
Riverbank Hydro's Mississippi 5 Hydroelectric Project No. 14139-000
would consist of: (1) A forebay and intake structure equipped with a
trashrack constructed upstream of the powerhouse on the east section of
the dam in the existing levee of the east abutment; (2) a reinforced
concrete powerhouse containing five turbine-generators each with a
rating of 4,000 kW for a total project installed capacity of 20 MW; (3)
a tailrace directing river flows back into the Mississippi River; and
(4) a 13.1-mile-long, 69-kV transmission line feeding the project power
to an existing transmission line. The intake, powerhouse, and tailrace
dimensions would be determined during the permit period. The project's
average annual generation would be 87,000 MWh at a head range of 5.0 to
9.5 feet, and the project would operate run-of-release.
Applicant Contact: Kuo-Bao Tong, Riverbank Power Corporation, Royal
Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 3230,
Toronto, ON, Canada M5J 2J4, phone (416) 861-0092, extension 154.
FERC Contact: Sergiu Serban, sergiu.serban@ferc.gov, (202) 502-
6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about each project, including a copy of the
applications, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14136-000, or P-14139-000) in the docket
number field to access the document. For assistance, contact FERC
Online Support.
Dated: August 3, 2011.