Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 48847 [2011-20152]

Download as PDF Federal Register / Vol. 76, No. 153 / Tuesday, August 9, 2011 / Notices Dated: August 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–20154 Filed 8–8–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12933–002] sroberts on DSK5SPTVN1PROD with NOTICES FFP Project 49 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2011, FFP Project 49 LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near the town of Hickman, in Fulton County Kentucky and Mississippi County, Missouri. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Hickman Bend hydrokinetic project would consist of the following: (1) Up to 2,850 SmarTurbine generating units installed in arrays on the bottom of the river; (2) the total capacity of the installation would be up to 114,000 kilowatts; (3) flexible cables would convey each arrays power to a metering station; and (4) a transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 249,660,000 kilowatt-hours (kWh), which would be sold to a local utility. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978) 283– 2822. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 VerDate Mar<15>2010 19:06 Aug 08, 2011 Jkt 223001 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12933–002) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–20153 Filed 8–8–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FFP Project 47 LLC; Project No.12932–002] Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2011, FFP Project 47 LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, in Mississippi County Arkansas and Tipton County, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Williams Point hydrokinetic project would consist of PO 00000 Frm 00059 Fmt 4703 Sfmt 9990 48847 the following: (1) Up to 3,550 SmarTurbine generating units installed in arrays on the bottom of the river; (2) the total capacity of the installation would be up to 142,000 kilowatts; (3) flexible cables would convey each arrays power to a metering station; and (4) a transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 310,980,000 kilowatt-hours (kWh), which would be sold to a local utility. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978) 283– 2822. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12932–002) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–20152 Filed 8–8–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\09AUN1.SGM 09AUN1

Agencies

[Federal Register Volume 76, Number 153 (Tuesday, August 9, 2011)]
[Notices]
[Page 48847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20152]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[FFP Project 47 LLC; Project No.12932-002]


Notice of Preliminary Permit Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Competing Applications

    On February 1, 2011, FFP Project 47 LLC filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of hydropower on the Mississippi River, in Mississippi 
County Arkansas and Tipton County, Tennessee. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed Williams Point hydrokinetic project would consist of 
the following: (1) Up to 3,550 SmarTurbine generating units installed 
in arrays on the bottom of the river; (2) the total capacity of the 
installation would be up to 142,000 kilowatts; (3) flexible cables 
would convey each arrays power to a metering station; and (4) a 
transmission line would interconnect with the power grid. The proposed 
project would have an average annual generation of 310,980,000 
kilowatt-hours (kWh), which would be sold to a local utility.
    Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 
239 Causeway Street, Boston, MA 02114; phone (978) 283-2822.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-12932-002) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20152 Filed 8-8-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.