Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization, 48854-48855 [2011-20147]
Download as PDF
48854
Federal Register / Vol. 76, No. 153 / Tuesday, August 9, 2011 / Notices
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Dated: August 2, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20057 Filed 8–8–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–525–000]
sroberts on DSK5SPTVN1PROD with NOTICES
Monroe Gas Storage Company, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on July 29, 2011
Monroe Gas Storage Company, LLC
(Monroe), Three Riverway, Suite 1350,
Houston, Texas 77056, filed in the
above docket, a request pursuant to
section 157.213 of the Commission’s
Regulations under the Natural Gas Act
VerDate Mar<15>2010
19:06 Aug 08, 2011
Jkt 223001
for authorization to modify a previously
approved natural gas storage injection
and withdrawal well. Specifically,
Monroe proposes to alter the authorized
but not yet constructed Well MGS–6–
W–D from a directional well to a
horizontal well, changing its final
bottomhole location, and rename it Well
MGS–6–W–H. The filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to J.
Gordon Pennington, Attorney at Law,
2707 N. Kensington St., Arlington, VA
22207; phone 703–533–7638; e-mail:
Pennington5@verizon.net.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20148 Filed 8–8–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–522–000]
Williston Basin Interstate Pipeline
Company; Notice of Request Under
Blanket Authorization
Take notice that on July 26, 2011,
Williston Basin Interstate Pipeline
Company (Williston Basin), 1250 West
Century Avenue, Bismarck, North
Dakota 58503 filed a prior notice request
in accordance with sections 157.210 and
157.216 of the Federal Energy
Regulatory Commission’s (Commission)
Regulations under the Natural Gas Act
and Williston Basin’s blanket certificate
issued in Docket Nos. CP82–487–000, et
al., to replace approximately 9.5 miles
of 10-inch diameter pipeline with new
12-inch diameter pipeline located in
Carbon County, Montana. Additionally,
Williston Basin proposes to abandon in
place the existing 9.5 miles of 10-inch
diameter pipeline and remove all
exposed pipe and the existing 12 Mile
Valve. Williston Basin states that the
replacement project will cost
$4,722,550, all as more fully set forth in
the application, which is open to the
public for inspection. The filing may
also be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding the
application should be directed to Keith
A. Tiggelaar, Director of Regulatory
Affairs, Williston Basin Interstate
Pipeline Company, 1250 West Century
Avenue, Bismarck, North Dakota 58503,
or telephone (701) 530–1560, or by email keith.tiggelaar@wbip.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
E:\FR\FM\09AUN1.SGM
09AUN1
Federal Register / Vol. 76, No. 153 / Tuesday, August 9, 2011 / Notices
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20147 Filed 8–8–11; 8:45 am]
sroberts on DSK5SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
20:21 Aug 08, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–518–000]
Questar Pipeline Company; Notice of
Request Under Blanket Authorization
Take notice that on July 20, 2011,
Questar Pipeline Company (Questar),
180 East 100 South, Salt Lake City, Utah
84111 filed a prior notice request
pursuant to 18 CFR 157.205 and 157.214
for authority to increase the maximum
certificated volume of natural gas to be
stored at its Clay Basin storage reservoir
and increase the maximum certificated
shut-in pressure of Clay Basin located in
Daggett County, Utah. The request was
made pursuant to the blanket certificate
authorization issued to Questar in
Docket No. CP82–491–000, all as more
fully set forth in the application, which
is open to the public for inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this prior
notice application should be directed to
L. Bradley Burton, General Manager,
Federal Regulatory Affairs, and Chief
Compliance Officer, Questar Pipeline
Company, 180 East 100 South, P.O. Box
45360, Salt Lake City, Utah 84145–0360,
or telephone (801) 324–2459, or fax
(801) 324–5834 by e-mail
brad.burton@questar.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
48855
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–20145 Filed 8–8–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–4141–000]
New York Independent System
Operator, Inc.; Notice of Request for
Waiver and Shortened Notice Period
On July 29, 2011, the New York
Independent System Operator, Inc.
(NYISO) filed a notification of its
inability to timely complete price
corrections, a request for a limited tariff
waiver to permit ancillary service prices
to be corrected with the corrected prices
to be posted by the end of Monday,
August 1, 2011, and a request for a
shortened notice period and expedited
Commission action. NYISO requests a
shortened answer period to facilitate
expedited Commission consideration.
NYISO states that good cause exists for
the Commission to act on an expedited
basis because until the Commission acts
on NYISO’s waiver request, NYISO and
market participants will not know if
E:\FR\FM\09AUN1.SGM
09AUN1
Agencies
[Federal Register Volume 76, Number 153 (Tuesday, August 9, 2011)]
[Notices]
[Pages 48854-48855]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-522-000]
Williston Basin Interstate Pipeline Company; Notice of Request
Under Blanket Authorization
Take notice that on July 26, 2011, Williston Basin Interstate
Pipeline Company (Williston Basin), 1250 West Century Avenue, Bismarck,
North Dakota 58503 filed a prior notice request in accordance with
sections 157.210 and 157.216 of the Federal Energy Regulatory
Commission's (Commission) Regulations under the Natural Gas Act and
Williston Basin's blanket certificate issued in Docket Nos. CP82-487-
000, et al., to replace approximately 9.5 miles of 10-inch diameter
pipeline with new 12-inch diameter pipeline located in Carbon County,
Montana. Additionally, Williston Basin proposes to abandon in place the
existing 9.5 miles of 10-inch diameter pipeline and remove all exposed
pipe and the existing 12 Mile Valve. Williston Basin states that the
replacement project will cost $4,722,550, all as more fully set forth
in the application, which is open to the public for inspection. The
filing may also be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Any questions regarding the application should be directed to Keith
A. Tiggelaar, Director of Regulatory Affairs, Williston Basin
Interstate Pipeline Company, 1250 West Century Avenue, Bismarck, North
Dakota 58503, or telephone (701) 530-1560, or by e-mail
keith.tiggelaar@wbip.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene
[[Page 48855]]
or notice of intervention. Any person filing to intervene or the
Commission's staff may, pursuant to section 157.205 of the Commission's
Regulations under the NGA (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC 20426.
Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20147 Filed 8-8-11; 8:45 am]
BILLING CODE 6717-01-P