Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 48850 [2011-20142]

Download as PDF 48850 Federal Register / Vol. 76, No. 153 / Tuesday, August 9, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FFP Project 48 LLC; Project No.12934–002] sroberts on DSK5SPTVN1PROD with NOTICES Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2011, FFP Project 48 LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near the town of New Madrid, in New Madrid County, Missouri and Fulton County Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed New Madrid Bend hydrokinetic project would consist of the following: (1) Up to 5,350 SmarTurbine generating units installed in arrays on the bottom of the river; (2) the total capacity of the installation would be up to 214,000 kilowatts; (3) flexible cables would convey each arrays power to a metering station; and (4) a transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 468,660,000 kilowatt-hours (kWh), which would be sold to a local utility. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978) 283– 2822. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ VerDate Mar<15>2010 19:06 Aug 08, 2011 Jkt 223001 ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12934–002) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–20143 Filed 8–8–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FFP Project 121 LLC; Project No. 14012– 000] Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 10, 2011, FFP Project 121 LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower on the Mississippi River, near Vicksburg, in Warren County, Mississippi and near Tallulah in Madison Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Vicksburg Bend hydrokinetic project would consist of the following: (1) Up to 8,340 SmarTurbine generating units installed in arrays on the bottom of the river; (2) the total capacity of the installation would be up to 333,600 kilowatts; (3) flexible cables would convey each PO 00000 Frm 00062 Fmt 4703 Sfmt 9990 arrays power to a metering station; and (4) a transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 758,681,460 kilowatt-hours (kWh), which would be sold to a local utility. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978) 283– 2822. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14012–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 3, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–20142 Filed 8–8–11; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\09AUN1.SGM 09AUN1

Agencies

[Federal Register Volume 76, Number 153 (Tuesday, August 9, 2011)]
[Notices]
[Page 48850]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-20142]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[FFP Project 121 LLC; Project No. 14012-000]


Notice of Preliminary Permit Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Competing Applications

    On January 10, 2011, FFP Project 121 LLC filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of hydropower on the Mississippi River, near Vicksburg, 
in Warren County, Mississippi and near Tallulah in Madison Parish, 
Louisiana. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed Vicksburg Bend hydrokinetic project would consist of 
the following: (1) Up to 8,340 SmarTurbine generating units installed 
in arrays on the bottom of the river; (2) the total capacity of the 
installation would be up to 333,600 kilowatts; (3) flexible cables 
would convey each arrays power to a metering station; and (4) a 
transmission line would interconnect with the power grid. The proposed 
project would have an average annual generation of 758,681,460 
kilowatt-hours (kWh), which would be sold to a local utility.
    Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 
239 Causeway Street, Boston, MA 02114; phone (978) 283-2822.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14012-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: August 3, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-20142 Filed 8-8-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.