Drawbridge Operation Regulations; Passaic River, Jersey City, NJ, 47440 [2011-19858]
Download as PDF
47440
Federal Register / Vol. 76, No. 151 / Friday, August 5, 2011 / Rules and Regulations
PART 232—REGULATION S–T—
GENERAL RULES AND REGULATIONS
FOR ELECTRONIC FILINGS
Dated: August 1, 2011.
Elizabeth M. Murphy,
Secretary.
[FR Doc. 2011–19824 Filed 8–4–11; 8:45 am]
1. The authority citation for Part 232
continues to read in part as follows:
■
BILLING CODE P
Authority: 15 U.S.C. 77f, 77g, 77h, 77j,
77s(a), 77z–3, 77sss(a), 78c(b), 78l, 78m, 78n,
78o(d), 78w(a), 78ll, 80a–6(c), 80a–8, 80a–29,
80a–30, 80a–37, and 7201 et seq.; and 18
U.S.C. 1350.
*
*
*
*
[Docket No. USCG–2011–0598]
2. Section 232.301 is revised to read
as follows:
erowe on DSKG8SOYB1PROD with RULES
Drawbridge Operation Regulations;
Passaic River, Jersey City, NJ
EDGAR Filer Manual.
Filers must prepare electronic filings
in the manner prescribed by the EDGAR
Filer Manual, promulgated by the
Commission, which sets out the
technical formatting requirements for
electronic submissions. The
requirements for becoming an EDGAR
Filer and updating company data are set
forth in the updated EDGAR Filer
Manual, Volume I: ‘‘General
Information,’’ Version 10 (August 2011).
The requirements for filing on EDGAR
are set forth in the updated EDGAR Filer
Manual, Volume II: ‘‘EDGAR Filing,’’
Version 17 (August 2011). Additional
provisions applicable to Form N–SAR
filers are set forth in the EDGAR Filer
Manual, Volume III: ‘‘N–SAR
Supplement,’’ Version 2 (August 2011).
All of these provisions have been
incorporated by reference into the Code
of Federal Regulations, which action
was approved by the Director of the
Federal Register in accordance with 5
U.S.C. 552(a) and 1 CFR Part 51. You
must comply with these requirements in
order for documents to be timely
received and accepted. You can obtain
paper copies of the EDGAR Filer
Manual from the following address:
Public Reference Room, U.S. Securities
and Exchange Commission, 100 F
Street, NE, Room 1543, Washington, DC
20549, on official business days
between the hours of 10 a.m. and 3 p.m.
Electronic copies are available on the
Commission’s Web site. The address for
the Filer Manual is https://www.sec.gov/
info/edgar.shtml. You can also inspect
the document at the National Archives
and Records Administration (NARA).
For information on the availability of
this material at NARA, call 202–741–
6030, or go to: https://www.archives.gov/
federal_register/
code_of_federal_regulations/
ibr_locations.html.
By the Commission.
VerDate Mar<15>2010
14:55 Aug 04, 2011
Coast Guard
33 CFR Part 117
*
■
§ 232.301
DEPARTMENT OF HOMELAND
SECURITY
Jkt 223001
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 1 & 9 Bridge
across the Passaic River, mile 1.8, at
Jersey City, New Jersey. The deviation is
necessary to facilitate bridge painting
operations at the bridge. This deviation
allows the bridge to remain in the
closed position for 58 days.
DATES: This deviation is effective from
August 1, 2011 through September 27,
2011.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0598 and are available online at&
https://www.regulations.gov, inserting
USCG–2011–0598 in the ‘‘Keyword’’
and then clicking ‘‘Search’’. They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Joe Arca, Project Officer,
First Coast Guard District,
joe.m.arca@uscg.mil or telephone (212)
668–7165. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION:
The Route 1 & 9 Bridge has a vertical
clearance of 40 feet at mean high water,
and 45 feet at mean low water in the
closed position. The existing
drawbridge operating regulations are
listed at 33 CFR 117.739(b). The
waterway is predominantly used by
commercial operators.
SUMMARY:
PO 00000
Frm 00018
Fmt 4700
Sfmt 9990
On December 13, 2010, the owner of
the bridge, New Jersey Department of
Transportation, requested a temporary
deviation to facilitate bridge painting
operations.
On January 27, 2011, the Coast Guard
published a temporary deviation (76 FR
4819) from the operation regulations.
The temporary deviation allowed the
bridge owner to require a two hour
advance notice for bridge openings and
several closures of short duration to
facilitate bridge painting.
As a result of severe winter weather
in 2011, the bridge painting project fell
behind schedule; therefore, the bridge
painting work will not be completed by
July 31, 2011, when the first temporary
deviation will expire.
We received a request for a second
temporary deviation from the bridge
owner on June 13, 2011, requesting
authorization to allow the bridge to
remain in the closed position from
August 1, 2011 through September 30,
2011, to facilitate completion of the
bridge painting work. We were not able
to grant a temporary deviation for the
additional 60 days requested because
that would exceed the maximum of 180
days allowable for temporary deviations
from the operation regulations.
Therefore, under this temporary
deviation the bridge may remain in the
closed position for 58 days from August
1, 2011 through September 27, 2011, to
facilitate completion of the bridge
painting. Vessels able to pass under the
closed draw may do so at any time.
The waterway users were advised of
the second 58 day temporary deviation
necessary to complete the bridge
painting. No objections were received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 27, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–19858 Filed 8–4–11; 8:45 am]
BILLING CODE 9110–04–P
E:\FR\FM\05AUR1.SGM
05AUR1
Agencies
[Federal Register Volume 76, Number 151 (Friday, August 5, 2011)]
[Rules and Regulations]
[Page 47440]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19858]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0598]
Drawbridge Operation Regulations; Passaic River, Jersey City, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City,
New Jersey. The deviation is necessary to facilitate bridge painting
operations at the bridge. This deviation allows the bridge to remain in
the closed position for 58 days.
DATES: This deviation is effective from August 1, 2011 through
September 27, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0598 and are available online
at& https://www.regulations.gov, inserting USCG-2011-0598 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, joe.m.arca@uscg.mil or telephone (212) 668-7165. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
The Route 1 & 9 Bridge has a vertical clearance of 40 feet at mean
high water, and 45 feet at mean low water in the closed position. The
existing drawbridge operating regulations are listed at 33 CFR
117.739(b). The waterway is predominantly used by commercial operators.
On December 13, 2010, the owner of the bridge, New Jersey
Department of Transportation, requested a temporary deviation to
facilitate bridge painting operations.
On January 27, 2011, the Coast Guard published a temporary
deviation (76 FR 4819) from the operation regulations. The temporary
deviation allowed the bridge owner to require a two hour advance notice
for bridge openings and several closures of short duration to
facilitate bridge painting.
As a result of severe winter weather in 2011, the bridge painting
project fell behind schedule; therefore, the bridge painting work will
not be completed by July 31, 2011, when the first temporary deviation
will expire.
We received a request for a second temporary deviation from the
bridge owner on June 13, 2011, requesting authorization to allow the
bridge to remain in the closed position from August 1, 2011 through
September 30, 2011, to facilitate completion of the bridge painting
work. We were not able to grant a temporary deviation for the
additional 60 days requested because that would exceed the maximum of
180 days allowable for temporary deviations from the operation
regulations.
Therefore, under this temporary deviation the bridge may remain in
the closed position for 58 days from August 1, 2011 through September
27, 2011, to facilitate completion of the bridge painting. Vessels able
to pass under the closed draw may do so at any time.
The waterway users were advised of the second 58 day temporary
deviation necessary to complete the bridge painting. No objections were
received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 27, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-19858 Filed 8-4-11; 8:45 am]
BILLING CODE 9110-04-P