Drawbridge Operation Regulations; Passaic River, Jersey City, NJ, 47440 [2011-19858]

Download as PDF 47440 Federal Register / Vol. 76, No. 151 / Friday, August 5, 2011 / Rules and Regulations PART 232—REGULATION S–T— GENERAL RULES AND REGULATIONS FOR ELECTRONIC FILINGS Dated: August 1, 2011. Elizabeth M. Murphy, Secretary. [FR Doc. 2011–19824 Filed 8–4–11; 8:45 am] 1. The authority citation for Part 232 continues to read in part as follows: ■ BILLING CODE P Authority: 15 U.S.C. 77f, 77g, 77h, 77j, 77s(a), 77z–3, 77sss(a), 78c(b), 78l, 78m, 78n, 78o(d), 78w(a), 78ll, 80a–6(c), 80a–8, 80a–29, 80a–30, 80a–37, and 7201 et seq.; and 18 U.S.C. 1350. * * * * [Docket No. USCG–2011–0598] 2. Section 232.301 is revised to read as follows: erowe on DSKG8SOYB1PROD with RULES Drawbridge Operation Regulations; Passaic River, Jersey City, NJ EDGAR Filer Manual. Filers must prepare electronic filings in the manner prescribed by the EDGAR Filer Manual, promulgated by the Commission, which sets out the technical formatting requirements for electronic submissions. The requirements for becoming an EDGAR Filer and updating company data are set forth in the updated EDGAR Filer Manual, Volume I: ‘‘General Information,’’ Version 10 (August 2011). The requirements for filing on EDGAR are set forth in the updated EDGAR Filer Manual, Volume II: ‘‘EDGAR Filing,’’ Version 17 (August 2011). Additional provisions applicable to Form N–SAR filers are set forth in the EDGAR Filer Manual, Volume III: ‘‘N–SAR Supplement,’’ Version 2 (August 2011). All of these provisions have been incorporated by reference into the Code of Federal Regulations, which action was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR Part 51. You must comply with these requirements in order for documents to be timely received and accepted. You can obtain paper copies of the EDGAR Filer Manual from the following address: Public Reference Room, U.S. Securities and Exchange Commission, 100 F Street, NE, Room 1543, Washington, DC 20549, on official business days between the hours of 10 a.m. and 3 p.m. Electronic copies are available on the Commission’s Web site. The address for the Filer Manual is https://www.sec.gov/ info/edgar.shtml. You can also inspect the document at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741– 6030, or go to: https://www.archives.gov/ federal_register/ code_of_federal_regulations/ ibr_locations.html. By the Commission. VerDate Mar<15>2010 14:55 Aug 04, 2011 Coast Guard 33 CFR Part 117 * ■ § 232.301 DEPARTMENT OF HOMELAND SECURITY Jkt 223001 Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, New Jersey. The deviation is necessary to facilitate bridge painting operations at the bridge. This deviation allows the bridge to remain in the closed position for 58 days. DATES: This deviation is effective from August 1, 2011 through September 27, 2011. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2011– 0598 and are available online at& https://www.regulations.gov, inserting USCG–2011–0598 in the ‘‘Keyword’’ and then clicking ‘‘Search’’. They are also available for inspection or copying at the Docket Management Facility (M– 30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard District, joe.m.arca@uscg.mil or telephone (212) 668–7165. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366–9826. SUPPLEMENTARY INFORMATION: The Route 1 & 9 Bridge has a vertical clearance of 40 feet at mean high water, and 45 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.739(b). The waterway is predominantly used by commercial operators. SUMMARY: PO 00000 Frm 00018 Fmt 4700 Sfmt 9990 On December 13, 2010, the owner of the bridge, New Jersey Department of Transportation, requested a temporary deviation to facilitate bridge painting operations. On January 27, 2011, the Coast Guard published a temporary deviation (76 FR 4819) from the operation regulations. The temporary deviation allowed the bridge owner to require a two hour advance notice for bridge openings and several closures of short duration to facilitate bridge painting. As a result of severe winter weather in 2011, the bridge painting project fell behind schedule; therefore, the bridge painting work will not be completed by July 31, 2011, when the first temporary deviation will expire. We received a request for a second temporary deviation from the bridge owner on June 13, 2011, requesting authorization to allow the bridge to remain in the closed position from August 1, 2011 through September 30, 2011, to facilitate completion of the bridge painting work. We were not able to grant a temporary deviation for the additional 60 days requested because that would exceed the maximum of 180 days allowable for temporary deviations from the operation regulations. Therefore, under this temporary deviation the bridge may remain in the closed position for 58 days from August 1, 2011 through September 27, 2011, to facilitate completion of the bridge painting. Vessels able to pass under the closed draw may do so at any time. The waterway users were advised of the second 58 day temporary deviation necessary to complete the bridge painting. No objections were received. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: July 27, 2011. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2011–19858 Filed 8–4–11; 8:45 am] BILLING CODE 9110–04–P E:\FR\FM\05AUR1.SGM 05AUR1

Agencies

[Federal Register Volume 76, Number 151 (Friday, August 5, 2011)]
[Rules and Regulations]
[Page 47440]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19858]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2011-0598]


Drawbridge Operation Regulations; Passaic River, Jersey City, NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, 
New Jersey. The deviation is necessary to facilitate bridge painting 
operations at the bridge. This deviation allows the bridge to remain in 
the closed position for 58 days.

DATES: This deviation is effective from August 1, 2011 through 
September 27, 2011.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket are part of docket USCG-2011-0598 and are available online 
at& https://www.regulations.gov, inserting USCG-2011-0598 in the 
``Keyword'' and then clicking ``Search''. They are also available for 
inspection or copying at the Docket Management Facility (M-30), U.S. 
Department of Transportation, West Building Ground Floor, Room W12-140, 
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 
p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard 
District, joe.m.arca@uscg.mil or telephone (212) 668-7165. If you have 
questions on viewing the docket, call Renee V. Wright, Program Manager, 
Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: 
    The Route 1 & 9 Bridge has a vertical clearance of 40 feet at mean 
high water, and 45 feet at mean low water in the closed position. The 
existing drawbridge operating regulations are listed at 33 CFR 
117.739(b). The waterway is predominantly used by commercial operators.
    On December 13, 2010, the owner of the bridge, New Jersey 
Department of Transportation, requested a temporary deviation to 
facilitate bridge painting operations.
    On January 27, 2011, the Coast Guard published a temporary 
deviation (76 FR 4819) from the operation regulations. The temporary 
deviation allowed the bridge owner to require a two hour advance notice 
for bridge openings and several closures of short duration to 
facilitate bridge painting.
    As a result of severe winter weather in 2011, the bridge painting 
project fell behind schedule; therefore, the bridge painting work will 
not be completed by July 31, 2011, when the first temporary deviation 
will expire.
    We received a request for a second temporary deviation from the 
bridge owner on June 13, 2011, requesting authorization to allow the 
bridge to remain in the closed position from August 1, 2011 through 
September 30, 2011, to facilitate completion of the bridge painting 
work. We were not able to grant a temporary deviation for the 
additional 60 days requested because that would exceed the maximum of 
180 days allowable for temporary deviations from the operation 
regulations.
    Therefore, under this temporary deviation the bridge may remain in 
the closed position for 58 days from August 1, 2011 through September 
27, 2011, to facilitate completion of the bridge painting. Vessels able 
to pass under the closed draw may do so at any time.
    The waterway users were advised of the second 58 day temporary 
deviation necessary to complete the bridge painting. No objections were 
received.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: July 27, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-19858 Filed 8-4-11; 8:45 am]