Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment, 46793 [2011-19637]

Download as PDF Federal Register / Vol. 76, No. 149 / Wednesday, August 3, 2011 / Notices the applicable criteria to be a qualifying facility. Intervention and/or protest do not lie in dockets that are qualifying facility self-certifications or selfrecertifications. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). Intervention and protests may be filed in response to notices of qualifying facility dockets other than self-certifications and selfrecertifications. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 27, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19626 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK4SPTVN1PROD with NOTICES [Project No. 12740–003–VA] Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the VerDate Mar<15>2010 16:24 Aug 02, 2011 Jkt 223001 Office of Energy Projects has reviewed the application for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the Pound River, at the U.S. Army Corps of Engineers’ (Corps) John W. Flannagan Dam and Reservoir, near the Town of Clintwood, in Dickenson County, Virginia, and has prepared an Environmental Assessment (EA). The proposed project would occupy approximately 1 acre of federal land managed by the Corps. In the EA, Commission staff analyzed the potential environmental effects of licensing the project and conclude that issuing a license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the EA should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Flannagan Hydroelectric Project No. 12740–003’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website under the ‘‘eFiling’’ link. For further information contact Gaylord Hoisington by telephone at (202) 502– 6032 or by e-mail at gaylord.hoisington@ferc.gov. Dated: July 27, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19637 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 46793 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER11–2875–001; ER11–2875– 002; Docket No. EL11–20–001] PJM Interconnection, L.L.C.; PJM Power Providers Group v. PJM Interconnection, L.L.C.; Notice Establishing Post-Technical Comment Period As indicated in the June 29, 2011 Notice in these dockets, comments on the technical conference that was held on July 28, 2011, to discuss issues related to PJM Interconnection, L.L.C. (PJM)’s Minimum Offer Price Rule (MOPR) and resources designed as ‘‘self supply,’’ 1 are due 21 days from the date of this conference, or Thursday, August 18, 2011. Dated: July 28, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19633 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11–4120–000] FFC Energy, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of FFC Energy, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting That such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and 1 PJM Interconnection, L.L.C., 135 FERC ¶ 61,228 (2011). E:\FR\FM\03AUN1.SGM 03AUN1

Agencies

[Federal Register Volume 76, Number 149 (Wednesday, August 3, 2011)]
[Notices]
[Page 46793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19637]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12740-003-VA]


Jordan Hydroelectric Limited Partnership; Notice of Availability 
of Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR Part 
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has 
reviewed the application for an original license for the 3.0-megawatt 
(MW) Flannagan Hydroelectric Project located on the Pound River, at the 
U.S. Army Corps of Engineers' (Corps) John W. Flannagan Dam and 
Reservoir, near the Town of Clintwood, in Dickenson County, Virginia, 
and has prepared an Environmental Assessment (EA). The proposed project 
would occupy approximately 1 acre of federal land managed by the Corps.
    In the EA, Commission staff analyzed the potential environmental 
effects of licensing the project and conclude that issuing a license 
for the project, with appropriate environmental measures, would not 
constitute a major federal action significantly affecting the quality 
of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, 
or for TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    Comments on the EA should be filed within 30 days from the issuance 
date of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project 
No. 12740-003'' to all comments. Comments may be filed electronically 
via Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's website under the ``eFiling'' link. For further 
information contact Gaylord Hoisington by telephone at (202) 502-6032 
or by e-mail at gaylord.hoisington@ferc.gov.

    Dated: July 27, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-19637 Filed 8-2-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.