Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment, 46793 [2011-19637]
Download as PDF
Federal Register / Vol. 76, No. 149 / Wednesday, August 3, 2011 / Notices
the applicable criteria to be a qualifying
facility. Intervention and/or protest do
not lie in dockets that are qualifying
facility self-certifications or selfrecertifications. Any person seeking to
challenge such qualifying facility status
may do so by filing a motion pursuant
to 18 CFR 292.207(d)(iii). Intervention
and protests may be filed in response to
notices of qualifying facility dockets
other than self-certifications and selfrecertifications.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
e-mail FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Dated: July 27, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–19626 Filed 8–2–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK4SPTVN1PROD with NOTICES
[Project No. 12740–003–VA]
Jordan Hydroelectric Limited
Partnership; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47897), the
VerDate Mar<15>2010
16:24 Aug 02, 2011
Jkt 223001
Office of Energy Projects has reviewed
the application for an original license
for the 3.0-megawatt (MW) Flannagan
Hydroelectric Project located on the
Pound River, at the U.S. Army Corps of
Engineers’ (Corps) John W. Flannagan
Dam and Reservoir, near the Town of
Clintwood, in Dickenson County,
Virginia, and has prepared an
Environmental Assessment (EA). The
proposed project would occupy
approximately 1 acre of federal land
managed by the Corps.
In the EA, Commission staff analyzed
the potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the EA should be filed
within 30 days from the issuance date
of this notice, and should be addressed
to the Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Room 1–A, Washington, DC
20426. Please affix ‘‘Flannagan
Hydroelectric Project No. 12740–003’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s
website under the ‘‘eFiling’’ link. For
further information contact Gaylord
Hoisington by telephone at (202) 502–
6032 or by e-mail at
gaylord.hoisington@ferc.gov.
Dated: July 27, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–19637 Filed 8–2–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00073
Fmt 4703
Sfmt 4703
46793
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER11–2875–001; ER11–2875–
002; Docket No. EL11–20–001]
PJM Interconnection, L.L.C.; PJM
Power Providers Group v. PJM
Interconnection, L.L.C.; Notice
Establishing Post-Technical Comment
Period
As indicated in the June 29, 2011
Notice in these dockets, comments on
the technical conference that was held
on July 28, 2011, to discuss issues
related to PJM Interconnection, L.L.C.
(PJM)’s Minimum Offer Price Rule
(MOPR) and resources designed as ‘‘self
supply,’’ 1 are due 21 days from the date
of this conference, or Thursday, August
18, 2011.
Dated: July 28, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–19633 Filed 8–2–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER11–4120–000]
FFC Energy, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of FFC
Energy, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting That
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
1 PJM Interconnection, L.L.C., 135 FERC ¶ 61,228
(2011).
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 76, Number 149 (Wednesday, August 3, 2011)]
[Notices]
[Page 46793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19637]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12740-003-VA]
Jordan Hydroelectric Limited Partnership; Notice of Availability
of Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has
reviewed the application for an original license for the 3.0-megawatt
(MW) Flannagan Hydroelectric Project located on the Pound River, at the
U.S. Army Corps of Engineers' (Corps) John W. Flannagan Dam and
Reservoir, near the Town of Clintwood, in Dickenson County, Virginia,
and has prepared an Environmental Assessment (EA). The proposed project
would occupy approximately 1 acre of federal land managed by the Corps.
In the EA, Commission staff analyzed the potential environmental
effects of licensing the project and conclude that issuing a license
for the project, with appropriate environmental measures, would not
constitute a major federal action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Comments on the EA should be filed within 30 days from the issuance
date of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project
No. 12740-003'' to all comments. Comments may be filed electronically
via Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's website under the ``eFiling'' link. For further
information contact Gaylord Hoisington by telephone at (202) 502-6032
or by e-mail at gaylord.hoisington@ferc.gov.
Dated: July 27, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-19637 Filed 8-2-11; 8:45 am]
BILLING CODE 6717-01-P