Millennium Pipeline Company, LLC; Notice of Application, 46786-46787 [2011-19632]

Download as PDF 46786 Federal Register / Vol. 76, No. 149 / Wednesday, August 3, 2011 / Notices and seven copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. r. Waiver of Pre-filing Consultation: On May 12, 2011, the applicant requested the agencies to support the waiver of the Commission’s consultation requirements under 18 CFR 4.38(c). On May 31, 2011, the Colorado Division of Wildlife concurred with the request contingent upon the applicant providing additional information, which the applicant provided on July 13, 2011. On June 20, July 5, and July 7, 2011, the U.S. Fish and Wildlife Service, the Colorado Water Quality Control Division, and the Colorado Division of Water Resources, respectively, concurred with this request. No other comments regarding the request for waiver were received. Therefore, we intend to accept the consultation that has occurred on this project during the pre-filing period and we intend to waive pre-filing consultation under section 4.38(c), which requires, among other things, conducting studies requested by resource agencies, and distributing and consulting on a draft exemption application. Dated: July 28, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19625 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK4SPTVN1PROD with NOTICES [Docket No. CP11–515–000] Millennium Pipeline Company, LLC; Notice of Application Take notice that on July 14, 2011, Millennium Pipeline Company, LLC (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New York 10965, filed in the above referenced docket an application VerDate Mar<15>2010 16:24 Aug 02, 2011 Jkt 223001 pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, requesting authorization to construct, own and operate the Minisink Compressor Project, which consists of a new 12,260 horsepower compressor station, suction and discharge pipeline and related appurtenant facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. These facilities will enable Millennium to increase firm deliveries to its interconnection with Algonquin Gas Transmission, LLC at Ramapo, New York from 450,000 Dth/ day to approximately 675,000 Dth/day. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Gary A. Kruse, Vice President-General Counsel & Secretary, Millennium Pipeline Company, LLC, One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New York 10965, by telephone at (845) 620–1300, by facsimile at (845) 620–1320, or by e-mail at kruse@millenniumpipeline.com or Joseph S. Koury, Wright & Talisman, P.C., 1200 G Street, NW., Suite 600, Washington, DC 20005, by telephone at (202) 393–1200, by facsimile at (202) 393–1240, or by e-mail at koury@wrightlaw.com or Ryan J. Collins, Wright & Talisman, P.C., 1200 G Street, NW., Suite 600, Washington, DC 20005, by telephone at (202) 393– 1200, by facsimile at (202) 393–1240, or by e-mail at collins@wrightlaw.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of E:\FR\FM\03AUN1.SGM 03AUN1 Federal Register / Vol. 76, No. 149 / Wednesday, August 3, 2011 / Notices environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: August 17, 2011. Dated: July 27, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19632 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK4SPTVN1PROD with NOTICES Combined Notice of Filings No. 2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP11–2170–001. Applicants: Florida Gas Transmission Company, LLC. Description: Florida Gas Transmission Company, LLC submits tariff filing per 154.203: Future Contracting Compliance to be effective 12/5/2011. Filed Date: 07/21/2011. Accession Number: 20110721–5117. Comment Date: 5 p.m. Eastern Time on Tuesday, August 02, 2011. Docket Numbers: RP10–896–001. Applicants: Granite State Gas Transmission, Inc. Description: Joint Petition of Granite State Gas Transmission, Inc., et al. for Approval of Settlement Amendment and Amendment to Stipulation and Agreement. Filed Date: 07/26/2011. Accession Number: 20110726–5092. Comment Date: 5 p.m. Eastern Time on Tuesday, August 02, 2011. Docket Numbers: RP10–1006–002. Applicants: Liberty Gas Storage, LLC. Description: Liberty Gas Storage, LLC submits tariff filing per 154.203: Liberty Gas Storage LLC Compliance Filing to be effective 9/1/2011. Filed Date: 07/22/2011. Accession Number: 20110722–5103. Comment Date: 5 p.m. Eastern Time on Wednesday, August 03, 2011. Docket Numbers: RP11–2236–001. Applicants: Natural Gas Pipeline Company of America. Description: Natural Gas Pipeline Company of America LLC submits tariff VerDate Mar<15>2010 16:24 Aug 02, 2011 Jkt 223001 filing per 154.205(b): Amended Negotiated Rate Filing to be effective 7/1/2011. Filed Date: 07/26/2011. Accession Number: 20110726–5091. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–1736–001. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: Transcontinental Gas Pipe Line Company, LLC submits tariff filing per 154.203: Compliance Filing for GT&C Sections 2 and 18 (RP11– 1736) to be effective 9/1/2011. Filed Date: 07/25/2011. Accession Number: 20110725–5106. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–2180–001. Applicants: Transcontinental Gas Pipe Line Company. Description: Transcontinental Gas Pipe Line Company, LLC submits tariff filing per 154.203: Compliance Filing— Revision to Volume No. 2 Table of Contents to be effective 5/19/2011. Filed Date: 07/25/2011. Accession Number: 20110725–5107. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 46787 Dated: July 27, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–19631 Filed 8–2–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 1 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP11–2295–000. Applicants: Trailblazer Pipeline Company LLC. Description: Trailblazer Pipeline Company LLC submits tariff filing per 154.403(d)(2): Tracking Filing—7/25/11 to be effective 9/1/2011. Filed Date: 07/25/2011. Accession Number: 20110725–5094. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–2296–000. Applicants: Questar Pipeline Company. Description: Questar Pipeline Company submits tariff filing per 154.204: Correction to Forms of Agreement to be effective 8/25/2011. Filed Date: 07/26/2011. Accession Number: 20110726–5034. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–2297–000. Applicants: Paulsboro Natural Gas Pipeline Company LLC. Description: Paulsboro Natural Gas Pipeline Company LLC submits tariff filing per 154.202: Baseline Tariff Filing to be effective 9/1/2011. Filed Date: 07/26/2011. Accession Number: 20110726–5059. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–2298–000. Applicants: Questar Overthrust Pipeline Company. Description: Report of Questar Overthrust Pipeline Company’s Annual Fuel Gas Reimbursement Report. Filed Date: 07/26/2011. Accession Number: 20110726–5155. Comment Date: 5 p.m. Eastern Time on Monday, August 08, 2011. Docket Numbers: RP11–2299–000. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits tariff filing per 154.204: ETC 34688–19 Amendment to Negotiated Rate Agreement to be effective 8/1/2011. Filed Date: 07/27/2011. E:\FR\FM\03AUN1.SGM 03AUN1

Agencies

[Federal Register Volume 76, Number 149 (Wednesday, August 3, 2011)]
[Notices]
[Pages 46786-46787]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-19632]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-515-000]


Millennium Pipeline Company, LLC; Notice of Application

    Take notice that on July 14, 2011, Millennium Pipeline Company, LLC 
(Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl 
River, New York 10965, filed in the above referenced docket an 
application pursuant to section 7(c) of the Natural Gas Act (NGA) and 
Part 157 of the Commission's regulations, requesting authorization to 
construct, own and operate the Minisink Compressor Project, which 
consists of a new 12,260 horsepower compressor station, suction and 
discharge pipeline and related appurtenant facilities, all as more 
fully set forth in the application which is on file with the Commission 
and open to public inspection. These facilities will enable Millennium 
to increase firm deliveries to its interconnection with Algonquin Gas 
Transmission, LLC at Ramapo, New York from 450,000 Dth/day to 
approximately 675,000 Dth/day. The filing is available for review at 
the Commission in the Public Reference Room or may be viewed on the 
Commission's Web site web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or 
TYY, (202) 502-8659.
    Any questions concerning this application may be directed to Gary 
A. Kruse, Vice President-General Counsel & Secretary, Millennium 
Pipeline Company, LLC, One Blue Hill Plaza, Seventh Floor, P.O. Box 
1565, Pearl River, New York 10965, by telephone at (845) 620-1300, by 
facsimile at (845) 620-1320, or by e-mail at 
kruse@millenniumpipeline.com or Joseph S. Koury, Wright & Talisman, 
P.C., 1200 G Street, NW., Suite 600, Washington, DC 20005, by telephone 
at (202) 393-1200, by facsimile at (202) 393-1240, or by e-mail at 
koury@wrightlaw.com or Ryan J. Collins, Wright & Talisman, P.C., 1200 G 
Street, NW., Suite 600, Washington, DC 20005, by telephone at (202) 
393-1200, by facsimile at (202) 393-1240, or by e-mail at 
collins@wrightlaw.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of

[[Page 46787]]

environmental documents issued by the Commission) and will not have the 
right to seek court review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the Internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: August 17, 2011.

    Dated: July 27, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-19632 Filed 8-2-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.